Maybe the inspector just didn't like the look of it for some reason?
Sometimes it's just easiest to ask the inspector what he would like to see.
If he didnt give the code reference it may be one of these items below:
* 2020 NEC*
Article 110.12 Workmanship ( the catch all of many issues for some
i
I’m not the code expert.
But here is a company making parts used for code installations.
https://www.cabproducts.com/solar/
Maybe one of theirs will work instead of the plastic chase.
Jay
> On Mar 22, 2022, at 5:20 PM, Jerry Shafer wrote:
>
>
> Without question the wires are either sup
Without question the wires are either supported via a rail or strut between
the rows of modules or trenched underground if a ground mount. I have seen
fly over and it will be a point of failure by someone that should be there
but is and if you damage one JB/diode pack on the back of a module you wi
22 5:48 PM
> *To: *RE-wrenches;
> *Cc: *
> *Subject:*Re: [RE-wrenches] Wires between arrays
>
> Once in my life i had an inspector concerned about strain relief, i used a
> GBC on each end of the pipe, it surficed. I think i could have used a bell
> mouth connector.
>
>
www.millersolar.com
CA Lic. 773985
*From:* RE-wrenches [mailto:re-wrenches-boun...@lists.re-wrenches.org] *On
Behalf Of *Dave Tedeyan
*Sent:* Tuesday, March 22, 2022 1:43 PM
*To:* RE-wrenches
*Subject:* [RE-wrenches] Wires between arrays
Hi All,
I have an inspector giving me a hard time about
There is a code citation that prohibits the use of conduit without an end or
fitting of some kind.-GlennSent from my 'smart'phone, so please excuse typos
and spelling errors.-- Original message--From: Darryl ThayerDate: Tue,
Mar 22, 2022 5:48 PMTo: RE-wrenches;Cc: Subject:Re: [RE-wrenche
--From: Dave Tedeyan
Date: 3/22/22 1:44 PM (GMT-08:00) To: RE-wrenches
Subject: [RE-wrenches] Wires between arrays
Hi All, I have an inspector giving me a hard time about wire management between
two ground mounted arrays. The racking is Unirac GFT, and the system was too
large to have one
Once in my life i had an inspector concerned about strain relief, i used a
GBC on each end of the pipe, it surficed. I think i could have used a bell
mouth connector.
On Tue, Mar 22, 2022, 3:43 PM Dave Tedeyan wrote:
> Hi All,
>
> I have an inspector giving me a hard time about wire management b
Hi Dave,
I typically use the same method you do for running conductors between two
non-continuous arrays. I have never had an issue with either AHJ blowback
or actual compromised conductors due to a lack of strain relief.
The only code reference I can think of is 300.4 regarding protection
agains
In Florida, the AHJ is required to cite the section of code when rejecting
work. I always ask for that if rejected. I'm not sure how things work in NY.
You might start with 690.31(C)(1) that allows PV wire to be exposed within
the PV array. The array boundary is defined elsewhere as within 1 ft of