[Axapta-Knowledge-Village] EP Installation Problem

2009-12-29 Thread GOKHAN CAN
I have installed EP and created a site. I have registered my site but when I log into site , site is empty. Does anybody have any Idea on this ?

[Axapta-Knowledge-Village] OLAP Cube Design Problems - URGENT

2009-07-21 Thread Gokhan CAN
I am trying to build an OLAP cube . I created a Query My query is like below. Reqtrans Inventtable Relation Inventtable.itemid = Reqtrans.itemid JoinType 1::1 - Inne

RE: [Axapta-Knowledge-Village] Software Cost calculation on P&L Reports

2007-11-28 Thread Gokhan Can
or 100 or 1000 customer. Therefore how can he sees his cost of software sales base ? Gokhan CAN From: Axapta-Knowledge-Village@yahoogroups.com [mailto:[EMAIL PROTECTED] On Behalf Of prasanna govindan Sent: Tuesday, November 27, 2007 6:55 AM To: Axapta-Knowledge-Village@yahoogroups.com

[Axapta-Knowledge-Village] Software Cost calculation on P&L Reports

2007-11-26 Thread Gokhan Can
amp;L report ?? GOKHAN CAN [Non-text portions of this message have been removed]

RE: [Axapta-Knowledge-Village] Frx Dimension Wizard on latest SP

2007-11-26 Thread Gokhan Can
amp;L report ?? GOKHAN CAN [Non-text portions of this message have been removed]

[Axapta-Knowledge-Village] database insert

2007-10-21 Thread Gokhan Can
Class which is not debug or modify enabled. Thank You Gokhan CAN AGC YAZILIM [Non-text portions of this message have been removed]

[Axapta-Knowledge-Village] Query Table limit

2007-03-12 Thread Gokhan CAN
Hello All; Is there any limit on datasource join function on Axapta ? Gokhan CAN [Non-text portions of this message have been removed]

RE: [Axapta-Knowledge-Village] Production scrap as inventory

2007-02-18 Thread gokhan can
What would I need to do If I want by-product item carry the production cost as same as primary product ? I can report by-product quantity as primary item and then consume primary item and produce by - product item from BOM Journal. Ýs there another way to do that on production order wit

[Axapta-Knowledge-Village] Dynamics 4.0 Product Builder

2007-02-16 Thread gokhan can
Hello; I need information about Product Builder Validation Rules in AX 4.0. In AX 3.0 we made a development for filtering the range of " table " type of variable according to another variable during run time. In AX 4.0 can we do this or do I need to make a custumization ?? Does an

[Axapta-Knowledge-Village] Unable To Load Page

2007-01-05 Thread gokhan can
Hello ; I have a printing problem. When I log on from client using AOS I can see reports which is set to run on client but I get " unable to load page " Error when I try to get run on server type reports. Does anyone had this problem ?? Gokhan CAN

RE: [Axapta-Knowledge-Village] InventSerial Creation Problem

2007-01-02 Thread gokhan can
number inventory dimension. This is by design and not a bug. Karina Normann Jakobsen Program Manager Microsoft Dynamics AX Microsoft Corporation -Original Message- From: Axapta-Knowledge-Village@yahoogroups.com <mailto:Axapta-Knowledge-Village%40yahoogroups.com> [mailto:Axapta-Kno

RE: [Axapta-Knowledge-Village] InventSerial Creation Problem

2007-01-02 Thread gokhan can
After you did this could you see those inventserial numbers on inventserialform. I can create inventserialnumbers on purchase order and when I register them I can see them on on hand manu but when I want to look at those serial numbers from InventSerial Form they are not inserted there. Gök

FW: [Axapta-Knowledge-Village] InventSerial Creation Problem

2007-01-02 Thread gokhan can
look at serial number form system did not create a serial number at there. I guess this is a big bug ... Gökhan CAN From: Axapta-Knowledge-Village@yahoogroups.com [mailto:[EMAIL PROTECTED] On Behalf Of gokhan can Sent: Monday, January 01, 2007 6:47 PM To: Axapta-Knowledge-Village

[Axapta-Knowledge-Village] InventSerial Creation Problem

2007-01-01 Thread gokhan can
when I look on hand form I can see serial numbers and qty near it. But when I looked at serail number form I saw that system did not create any serial number. Has anyone noticed this situation ? Is it a bug or is it the way that system works. Gokhan CAN [Non-text portions of this

[Axapta-Knowledge-Village] Batch No in BOM

2006-08-22 Thread gokhan can
Hello all; I am using batch number for an item which we say as Item A Bom of another item which is Item B , I want to select Item A and specific batch number of that Item. But Axapta does not allow to select batch number in standart Bom ??? Do I miss something ??? or there is a reason why

[Axapta-Knowledge-Village] Property using in Capacity Planning

2006-07-26 Thread gokhan can
How can we use Property in Capacity Planning ?? Gökhan CAN AGC Yazilim Elektrik Tic. Ltd. Þti. Tel : 0 232 463 16 63 Fax : 0 232 463 51 57 Cep: 0 532 701 17 39 [Non-text portions of this message have been removed] Yahoo! Groups Sponsor

[Axapta-Knowledge-Village] Dynamic Form according to ledgertrans

2006-04-20 Thread Gokhan Can
according to ledgertrans data. GOKHAN CAN Sharing the knowledge on Axapta. Visit www.frappr.com/axapta for axapta friends. YAHOO! GROUPS LINKS  Visit your group "Axapta-Knowledge-Village" on the web.   To unsubscribe from this group, send an email

[Axapta-Knowledge-Village] Creating Report 2 pages in a page ( Urgent )

2005-10-20 Thread Gokhan Can
line  2 nd line   N+2 nd line  3 rd line   …  …    …  …    …  N th line       Can anybody give an idea about this?   Gokhan CAN Sharing the knowledge on Axapta. SPONSORED LINKS

[Axapta-Knowledge-Village] BOM Journal and Master Planning

2005-10-16 Thread Gokhan Can
Hi all; We are planning to offer a license model to a customer. the price is increase if we add Production I module therefore I am looking some kinf of oppurtunities to solve customer's requirements. The situation; Customer does master planing just for purchase items, and produces cooked foo

[Axapta-Knowledge-Village] InventCostItemDım

2005-09-23 Thread Gokhan Can
Hi All; I have a problem about costing progress of axapta. My client make production for 2-3 month for same order.Before August we did not split our production orders month by month.But at the end of august we wrote a job and split production orders. But right now we are trying to close June

[Axapta-Knowledge-Village] Period Costing for productions

2005-09-07 Thread Gokhan Can
I have a big costing situation for production which goes for few months. We cost them at everymonth so financial stocks and physical stocks are equal. But when we finish same production in the following month it calculates the production receipts again and makes some adjustments for the receip

[Axapta-Knowledge-Village] Error when try to adjust on hand inventory

2005-08-20 Thread Gokhan Can
When I try to adjust my on hand inventory I get an error whicj I wrote below. Error Adjustment of on-hand inventory\Item number: TPDD15 Adjustment cannot be completely allocated to open transactions. What can I do about this ?Or what is the reason ? Gökhan CAN Software Engineer / Mic

[Axapta-Knowledge-Village] BOM requirements loss after partiallt costing a production order( Urgent)

2005-08-12 Thread Gokhan Can
I have a production order which is status is Started.when we turn from june to August we had to cost our production for report of finished quantities.But I can not see ant BOM requirements for this production anymore. As an example Production Order Qty : 1000 Total BOM requirement of pro

[Axapta-Knowledge-Village] BOM Requirements loss when partial costing a production order

2005-08-11 Thread Gokhan Can
I have a production order which is status is Started.when we turn from june to August we had to cost our production for report of finished quantities.But I can not see ant BOM requirements for this production anymore. As an example Production Order Qty : 1000 Total BOM requirement of producti

[Axapta-Knowledge-Village] MUIC locking

2005-07-12 Thread Gokhan Can
Hi all; Has anyone experienced MUIC locking?We ran MUIC from 10 clients and it works for few hours very good but we realize that MUIC does not make any settlement and does not take any more item from calculation list.When we restart the server or just stop calculation and restart again it w

YNT: [Axapta-Knowledge-Village] 64 KB error on product builder (compiler error.)

2005-07-07 Thread Gokhan Can
Hi Gloria; We had same kind of situation but or product model is very big like 600 variables on the same model so the code , BOM and if nodes gave error for 64 KB error .But I am not sure that your situation is this big. ,I f you did not check the compile as X++ classes under Product Builder ->

YNT: [Axapta-Knowledge-Village] Production Costing

2005-06-29 Thread Gokhan Can
age@yahoogroups.com bu kişinin yerine: Gloria Sun Gönderilmiş: Çar 29.06.2005 20:49 Kime: Axapta-Knowledge-Village@yahoogroups.com Konu: Re: [Axapta-Knowledge-Village] Production Costing Hi Gokhan, Can you please clarify the subject?? What does "..I must not select batch number base

[Axapta-Knowledge-Village] Production Costing

2005-06-29 Thread Gokhan Can
Hi; I ran production costing.But I realized that I made a mistake on inventory dimension selection which I must not select batch number base costing but I did select it. Now I changed that selection but I need to cancel those cost account calculation for production but production module does n

[Axapta-Knowledge-Village] Master Planing problem

2005-06-21 Thread Gokhan Can
Hi; I created an production order for 100 pieces and the BOM of this production order is Item No WH Qua Per Series AGW 1 1 I ran job scheduling and the started production On the BOM form pf the production and T

[Axapta-Knowledge-Village] Join SalesTable to ProdTable

2005-06-14 Thread Gokhan Can
Hi; I am trying to make a form and show salesorders and the relevant production order and thequantity of the sales and production order etc etc. I created a form and I added salestable and prodtable on the datasource. I select salestable on the prodtable joinsource and jointype delayed. On the

YNT: [Axapta-Knowledge-Village] Inventory Calculation and Adjustment ( Urgent )

2005-06-01 Thread Gokhan Can
ntDim))); } loopMax = loopX; loopX = 0; while (loopX < loopMax) { loopX++; this.updateItemDim(mapLoopTrans.lookup(loopX),mapLoopDim.lookup(loopX)); } } HTH sas - Original Message - From: "Gokhan Can" <[EMAIL PROTECTED]> To: Sent: Wednesda

[Axapta-Knowledge-Village] Inventory Calculation and Adjustment ( Urgent )

2005-06-01 Thread Gokhan Can
Hi; We started our inventory calculation on Monday ( this is not good ) and it is still going on but there is unhappiness about the performance of the system today very badly. What if we select Calculation - > Stop Calculation and at night when weight gets lower select Calculation - > Help

YNT: [Axapta-Knowledge-Village]Negative Inventory after posting Picking List ( urgent )

2005-03-22 Thread Gokhan Can
doesn't let us to post negative qty for the configured item. Please see the attached doc regarding your problem, and check where the difference is? Kindly regards, Handan ________ From: Gokhan Can [mailto:[EMAIL PROTECTED] Sent: Thursday, March 17, 200

YNT: [Axapta-Knowledge-Village] RE: Negative Inventory after posting Picking List ( urgent )

2005-03-17 Thread Gokhan Can
ns for the stock checking. Does the Negative inventory parameter checked on your Inventory Model Group? Regards, Gülden. ____ From: Gokhan Can [mailto:[EMAIL PROTECTED] Sent: Thursday, March 17, 2005 11:05 AM To: Axapta-Knowledge-Village@yahoogroups.com Subject: YN

YNT: [Axapta-Knowledge-Village] RE: Negative Inventory after posting Picking List ( urgent )

2005-03-17 Thread Gokhan Can
rything is ofcourse possible) Wat version do you have? it works correctly in 3.0 SP3. Gunther ____ From: Gokhan Can [mailto:[EMAIL PROTECTED] Sent: donderdag 17 maart 2005 10:05 To: Axapta-Knowledge-Village@yahoogroups.com Subject: YNT: [Axapta-Knowledge-Village] RE

YNT: [Axapta-Knowledge-Village] RE: Negative Inventory after posting Picking List ( urgent )

2005-03-17 Thread Gokhan Can
from con1 to con2 greetz, Gunther ________ From: Gokhan Can [mailto:[EMAIL PROTECTED] Sent: woensdag 16 maart 2005 20:27 To: Axapta-Knowledge-Village@yahoogroups.com Subject: Negative Inventory after posting Picking List ( urgent ) Hi; I have a huge problem at my customer. Customer started to compl

[Axapta-Knowledge-Village] Negative Inventory after posting Picking List ( urgent )

2005-03-16 Thread Gokhan Can
Hi; I have a huge problem at my customer. Customer started to complete production order and after posting picking list I have seen some inventory dimensions has negative stock. I have found the bug but I do not know how to solve it... Warehouse is ware_1 Item A has 2 konfigurations Con_1 a

[Axapta-Knowledge-Village] BOM calculation Problem

2005-03-07 Thread Gokhan Can
Title: Message  I have a BOM for Product A    Item Count    Per series  B 10 1     The Route of B is   Operation   Setup Time    Process Time   Opr 1  10 sec    30 sec   When bom calculation runs   it creates a estima

[Axapta-Knowledge-Village] Capacity Planning Problem ( Urgent )

2005-01-10 Thread Gokhan Can
%2 quantity. I finished my production and my good quantity is 998. So for my customer 998 quantity is not a problem but when I try to finish my production order it gives an error "Production count is reserved and you can not decrease production quantity" so I can not finish my productio

[Axapta-Knowledge-Village] Capacity Planning Problem

2005-01-07 Thread Gokhan Can
Hello ;   I have a problem about capacity planing. I have a production order   Fort his production route is defined like ;   Work Center  -> A ( Group type which has 16 work centers ) Work Center count -> 6   In my prodution parameters   Max conflict solution quant

[Axapta-Knowledge-Village] Problem about Inter-Company

2005-01-04 Thread Gokhan Can
I have 2 companies one of them is vendor for other one and they are both using same database and application.Company A is production company and company B is seller company and also Company A can sell this item too. My problem is I created Product Models in Production company but I can not use

[Axapta-Knowledge-Village] İLT: Salesline Id from Product Builder

2004-11-10 Thread Gokhan Can
Hi; I want to get the id of salesline id and sales delivery date and sales quantity from Product builder code node. Is it possible to get them?If yes can anyone guide me? Gökhan CAN Yahoo! Groups Sponsor ~--> Make a clean sweep of pop-up ads.

YNT: [Axapta-Knowledge-Village] Multiple workcenters parallel using same operation name

2004-11-05 Thread Gokhan Can
Thank you but I do not wanna define different operation for same jobs. I guess my porblem can not be handled by standart axapta I need to make some custumization Gokhan CAN Kimden: Arkadiusz Zimniak [mailto:[EMAIL PROTECTED] Gönderilmiş: Cum 05.11.2004 09:28

YNT: [Axapta-Knowledge-Village] Multiple workcenters parallel using same operation name

2004-11-04 Thread Gokhan Can
error too . GOKHAN CAN Kimden: Dick Howard [mailto:[EMAIL PROTECTED] Gönderilmiş: Per 04.11.2004 16:28 Kime: [EMAIL PROTECTED] Konu: RE: [Axapta-Knowledge-Village] Multiple workcenters parallel using same operation name The setup you show is erroring because

[Axapta-Knowledge-Village] Multiple workcenters parallel using same operation name

2004-11-04 Thread Gokhan Can
Hi all; I have a problem about work centers and operations. I usually do an operation with one work center but If another work center is empty I can divide my operation into two parallel operations in one route . But in axapta it does not let me to do this as an example I can make holes

[Axapta-Knowledge-Village] Mutliple Workcenters with same operation

2004-11-04 Thread Gokhan Can
Hi all; I have a problem about work centers and operations. I usually do an operation with one work center but If another work center is empty I can divide my operation into two parallel operations in one route . But in axapta it does not let me to do this as an example I can make holes o

YNT: [Axapta-Knowledge-Village] Route Node Product Builder (urgent)

2004-11-03 Thread Gokhan Can
with the required type. .Did you try to set priority from variable and compile it?Does it give an error ? I need an urgent answer ... Gokhan CAN Kimden: Deleu,Walter [mailto:[EMAIL PROTECTED] Gönderilmiş: Çar 03.11.2004 11:16 Kime: [EMAIL PROTECTED] Kon

[Axapta-Knowledge-Village] Route Node Product Builder (urgent)

2004-11-02 Thread Gokhan Can
node. But when I do this Axapta gives an error message like incompatible value. How can I create this kind of route or how can I set priority from a variable??? Thanks Gokhan CAN Yahoo! Groups Sponsor ~--> Make a clean sweep of pop-up

[Axapta-Knowledge-Village] Product Builder Route Node

2004-11-02 Thread Gokhan Can
Hi; I am trying to set priority by using a variable but PB does not let me do that. Has anybody noticed an error like this ?? Yahoo! Groups Sponsor ~--> $9.95 domain names from Yahoo!. Register anything. http://us.click.yahoo.com/J8kdrA/y20IAA/yQL

[Axapta-Knowledge-Village] Compiling Product Model

2004-11-02 Thread Gokhan Can
it possible to compile it faster?? I did chekc the compile as axapta classes if it is over 128 kb ckeckbox. Gokhan CAN Yahoo! Groups Sponsor ~--> Make a clean sweep of pop-up ads. Yahoo! Companion Toolbar. Now with Pop-Up Blocker. Get it for f

RE: [Axapta-Knowledge-Village] Operation - Workcenter reletion

2004-10-22 Thread Gokhan Can
enters, then its two different routes.     In Operations -> Relations , specify the route  where the different work center is used for the same operation. It must work!.   Cheers   Jim Gokhan Can <[EMAIL PROTEC

[Axapta-Knowledge-Village] Operation - Workcenter reletion

2004-10-22 Thread Gokhan Can
Hi all;   I have a problem about operations and work centers.   I have 2 operations and they are named as op1 and op2 I have 2 workcenters groups and they are workgroup1 and workgroup2   And when ı am creating my relations I try to do   Operation   Work Center