The design criteria on the drawings are:
1. International Fire Prevention Code with North Carolina Amendments
2. NFPA-13
3. Local Fire Marshall
4. County Building Officials 


 


-----Original Message-----
From: [EMAIL PROTECTED]
[mailto:[EMAIL PROTECTED] On Behalf Of John Drucker
Sent: Thursday, August 02, 2007 8:10 AM
To: [email protected]
Subject: RE: Telecom & Data Rooms

Brian,

What is the adopted building code in this jurisdiction ?   That's the
starting point.

John Drucker 

-----Original Message-----
From: [EMAIL PROTECTED]
[mailto:[EMAIL PROTECTED] On Behalf Of Brian Harris
Sent: Thursday, August 02, 2007 8:06 AM
To: [email protected]
Subject: Telecom & Data Rooms

I'm being told by an Architect we are doing a school with that I need to
remove any heads from the Telecom & Data rooms and that I'm not allowed to
run any pipe above those ceilings either. He is basing it on the provisions
for eliminating heads in and Electrical room with a 2 hour fire wall, am I
missing something? I am not aware of Telecom & Data rooms falling into the
same category as an Electrical room. I have approved plans from the AHJ with
the heads shown in those rooms and omitted from the Electrical rooms. Any
thoughts?
 

 

 

 

_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum

To Unsubscribe, send an email to:[EMAIL PROTECTED]
(Put the word unsubscribe in the subject field)

_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum

To Unsubscribe, send an email to:[EMAIL PROTECTED]
(Put the word unsubscribe in the subject field)

Reply via email to