It's way past that, the pipe is installed. I was just going through my review comments from the Engineer and there was an issue with a sprinkler head and a light in one of the Telecom rooms and his note was to "coordinate head location with light"
Thanks for the 2-L's issue..... -----Original Message----- From: [EMAIL PROTECTED] [mailto:[EMAIL PROTECTED] On Behalf Of George Church Sent: Thursday, August 02, 2007 8:40 AM To: [email protected] Subject: RE: Telecom & Data Rooms Omit, note as directed by Architect, and submit. If bounced, submit COR. Only question to ask the Architect, if bounced, is clean agent or A.S. (wet or PA?) (or both CA and AS) to be included in the COR, and who's got the detection? This is one where it may be wise to simply confirm direction from Arch in writing, and play dumb installing contractor. After all, they're the Professionals. You could, if you desire to minimize schedule impact, copy the AHJs on the confirmation to the Architect to telegraph the blow. Glc PS- John Marshall, first chief justice of the US Supreme Court, has 2 L's. Fire marshals do not rise to that. -----Original Message----- From: [EMAIL PROTECTED] [mailto:[EMAIL PROTECTED] On Behalf Of Brian Harris Sent: Thursday, August 02, 2007 8:27 AM To: [email protected] Subject: RE: Telecom & Data Rooms The design criteria on the drawings are: 1. International Fire Prevention Code with North Carolina Amendments 2. NFPA-13 3. Local Fire Marshall 4. County Building Officials -----Original Message----- From: [EMAIL PROTECTED] [mailto:[EMAIL PROTECTED] On Behalf Of John Drucker Sent: Thursday, August 02, 2007 8:10 AM To: [email protected] Subject: RE: Telecom & Data Rooms Brian, What is the adopted building code in this jurisdiction ? That's the starting point. John Drucker -----Original Message----- From: [EMAIL PROTECTED] [mailto:[EMAIL PROTECTED] On Behalf Of Brian Harris Sent: Thursday, August 02, 2007 8:06 AM To: [email protected] Subject: Telecom & Data Rooms I'm being told by an Architect we are doing a school with that I need to remove any heads from the Telecom & Data rooms and that I'm not allowed to run any pipe above those ceilings either. He is basing it on the provisions for eliminating heads in and Electrical room with a 2 hour fire wall, am I missing something? I am not aware of Telecom & Data rooms falling into the same category as an Electrical room. I have approved plans from the AHJ with the heads shown in those rooms and omitted from the Electrical rooms. Any thoughts? _______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum To Unsubscribe, send an email to:[EMAIL PROTECTED] (Put the word unsubscribe in the subject field) _______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum To Unsubscribe, send an email to:[EMAIL PROTECTED] (Put the word unsubscribe in the subject field) _______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum To Unsubscribe, send an email to:[EMAIL PROTECTED] (Put the word unsubscribe in the subject field) _______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum To Unsubscribe, send an email to:[EMAIL PROTECTED] (Put the word unsubscribe in the subject field)