A picture's worth a thousand words.  Haven't seen any piece by piece
assembly text anywhere.  

That's the way to do it, if in doubt contact your pump supplier and he
may be able to provide some additional data.  

What is the engineer challenging about this arrangement? 

Examples that show what you've described:

Fig. A.5.24.4 (2007)
Fig. A.6.3.1 (2007)
Fig. A 7.3.1 (2007)

And the list goes on.  Should be no debate.  



Craig L. Prahl, CET
Fire Protection Group
Mechanical Department
CH2MHILL
Lockwood Greene
1500 International Drive
PO Box 491, Spartanburg, SC  29304-0491
Direct - 864.599.4102
Fax - 864.599.8439
[EMAIL PROTECTED]
http://www.lg.com


-----Original Message-----
From: [EMAIL PROTECTED]
[mailto:[EMAIL PROTECTED] On Behalf Of FPDC
Sent: Wednesday, September 19, 2007 10:06 AM
To: [email protected]
Subject: pump test header location

The diagrams in NFPA 20 show the connection for the test header prior to
the valve on the discharge side of the pump. However, the diagrams are
located in the appendix and I can't seem to find any text reference to
it within the standard. Coul; someone enlighten me if the is any and if
so, where? I've called for this and am being challenged by an engineer.
Thanks

Todd G. Williams, PE
Fire Protection Design/Consulting
Stonington, Connecticut
www.fpdc.com
860.535.2080
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum

To Unsubscribe, send an email
to:[EMAIL PROTECTED]
(Put the word unsubscribe in the subject field)
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum

To Unsubscribe, send an email to:[EMAIL PROTECTED]
(Put the word unsubscribe in the subject field)

Reply via email to