It's more common to take the test header off the end of bulk main or combine it with the FDC line if the header is remote from the pump room.
Ron Fletcher Aero Automatic Phoenix, AZ -----Original Message----- From: [EMAIL PROTECTED] [mailto:[EMAIL PROTECTED] On Behalf Of FPDC Sent: Wednesday, September 19, 2007 7:06 AM To: [email protected] Subject: pump test header location The diagrams in NFPA 20 show the connection for the test header prior to the valve on the discharge side of the pump. However, the diagrams are located in the appendix and I can't seem to find any text reference to it within the standard. Coul; someone enlighten me if the is any and if so, where? I've called for this and am being challenged by an engineer. Thanks Todd G. Williams, PE Fire Protection Design/Consulting Stonington, Connecticut www.fpdc.com 860.535.2080 _______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum To Unsubscribe, send an email to:[EMAIL PROTECTED] (Put the word unsubscribe in the subject field) _______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum To Unsubscribe, send an email to:[EMAIL PROTECTED] (Put the word unsubscribe in the subject field)
