Good question.  I believe it will possibly help but do not know how
much. This is why RelMark has asked for testing to determine what is
correct answer at certain humidity, pressure and fitting not all the way
home.

Top Myers
RelMark Group
961 Pottstown Pike
Chester Springs, PA 19425
O - 610-321-2415 X-219, C - 610-952-0965
[EMAIL PROTECTED]
-----Original Message-----
From: [EMAIL PROTECTED]
[mailto:[EMAIL PROTECTED] On Behalf Of art
Sent: Monday, October 22, 2007 12:02 PM
To: [email protected]
Subject: RE: Plastic cure times

A novice question: Could a heat lamp or other heat source reduce the
cure
time if only a few joints are involved so an entire system is not out
service for over 24 hours?

-----Original Message-----
From: [EMAIL PROTECTED]
[mailto:[EMAIL PROTECTED] On Behalf Of Top Myers
Sent: Sunday, October 21, 2007 7:56 PM
To: [email protected]
Subject: RE: Plastic cure times

The sprinkler industry is experiencing water damage losses from CPVC
piping. There have been many large dollar catastrophic losses and almost
always in a service situation.  After visiting contractors and there
fitters all over the country who had such losses we realized how
important cure time was to these losses.  In new construction most
joints have days or weeks to cure before water is applied so a joint
that is not perfect will cure with no problem.  In a service situation
this is just not the case in the real world. Many good contractors with
experienced trained fitters got burnt.

However, at RelMark, the loss activity related to improperly joining of
piping has decreased to the point where these types of claims are nearly
non-existent with our insured. The reason? RelMark Program Managers
requires our contracting partners to practice standard cut-in procedures
that include a minimum of 24-hour cure time for all modifications or
repairs made to CPVC piping.

There are many variables to insuring the proper joining of two pieces of
CPVC piping. The temperature, humidity, pipe size, age of the solvent
cement, cut of the pipe, or dirt or moisture on the pipe, can all affect
the time needed for the proper curing of the cement. Because it is
difficult for field installers to weigh all the variables and adjust for
appropriate cure times for each cut-in, RelMark Program Managers Cut-In
Procedures require a minimum 24-hour cure time before introducing water
into the sprinkler piping.

With a 24-hour cure time, the sprinkler system, or a portion of the
sprinkler system, will be out of service while the cement cures. It is
important that the building owners understand their responsibility in
maintaining a safe environment during the system modification/repair.
Written notification of the length of cure time must be shared with the
building owner prior to initiating work. If using a contract, the
standard wording should be added to the document. Otherwise, a standard
'Shut Down Notification' should be developed and signed by the building
owner before work is initiated. The following is sample language for
your consideration.

Sample Wording for 24-Hour Minimum Cure Time:

We, (name of sprinkler contractor), are providing notification to you
(name of building owner) that we will be altering the CPVC piping in
your building as part of the sprinkler system repair or modification.
To assure proper operation when completed, CPVC piping components
require a minimum cure time of 24 hours. As such, your sprinkler system
will be shut down and out of service for at least 24 hours. You are
responsible for instituting and maintaining a fire watch in the building
while the sprinkler system is out of service. You must provide your
property insurance carrier with advance notification of the sprinkler
shut down. You may be asked by your property insurer to take additional
precautions.
We, (name of sprinkler contractor), are not responsible for fire, or
other bodily injury or property damage that could result due to lack of
sprinkler system response during the shut down period. 

If a building owner needs additional information as to why you, as the
sprinkler contractor, are asking for lengthy down times on the sprinkler
system, feel free to share the first page of this document with the
individual(s). Education and understanding of the hazard will aid in
compliance of the cure times.

Of course the standard check with your lawyer...

Top Myers
RelMark Group
961 Pottstown Pike
Chester Springs, PA 19425
O - 610-321-2415 X-219, C - 610-952-0965
[EMAIL PROTECTED]
-----Original Message-----
From: [EMAIL PROTECTED]
[mailto:[EMAIL PROTECTED] On Behalf Of Jim
Deason
Sent: Friday, October 19, 2007 4:01 PM
To: [email protected]
Subject: Re: Plastic cure times

Ron Greenman wrote:
> Chris,
>
> Cure times are in the manufactures' literature at are specific to pipe
> size and ambient temperature per manufacturer (or at least supplier of
> resin). Make sure you file documentation with the job file as to what
> you did since it may save you later. I've heard of a suit involving a
> penthouse apartment and a Monet that questioned cure time that is
> around $8M.
>
> On 10/19/07, Todd Williams - FPDC <[EMAIL PROTECTED]> wrote:
>   
>> It seems to me I read somewhere something about 24 hours cure time
>> before a 200# test
>>
>>
>>
>> At 03:09 PM 10/19/2007, you wrote:
>>     
>>> It is going to be in the book for the type pipe you are using. The
cure
>>> times are listed, but there is an area in most of them for reno's to
>>> existing plastic. I can't remember seeing 24 hours before. I think
that is
>>> just a standard SOP for most companies. Watch the Temp changes
because after
>>> a certain temp, you can't even work with plastic until you bring the
room to
>>> a minimum temp.
>>>
>>> Matt
>>>
>>> Matthew J. Willis
>>> Living Water Fire Protection, LLC.
>>> 1160 McKenzie Rd.
>>> PO Box 877
>>> Cantonment, FL. 32533
>>> 850-937-1850 Voice
>>> 850-937-1852 Facsimile
>>> [EMAIL PROTECTED]
>>>
>>>
>>> ----- >-----Original Message-----
>>> ----- >From: [EMAIL PROTECTED]
>>> ----- >[mailto:[EMAIL PROTECTED] On
>>> ----- >Behalf Of Chris Cahill
>>> ----- >Sent: Friday, October 19, 2007 2:05 PM
>>> ----- >To: [email protected]
>>> ----- >Subject: Plastic cure times
>>> ----- >
>>> ----- >We don't do a lot of plastic work and what little we do
>>> ----- >is new work.   We
>>> ----- >seem to recall we're supposed to allow the glue to cure
>>> ----- >for 24 hrs before returning an existing system to
>>> ----- >service.  Even longer for 2" and larger.
>>> ----- >But when we look at 2 different manufactures recommended
>>> ----- >guidelines they don't match our memory.  We can go 1.5
>>> ----- >hours for 1" and 8 hours for 2" and up for brand A and
>>> ----- >30 minutes up to 2" and 1.5 hrs for larger for brand B.
>>> ----- >Has the glue changed that much the 24 hrs is no longer
>>> ----- >valid?  Has our memory just failed and it never was 24
>>> ----- >hrs?  Does the 24 hrs. come from some other source?
>>> ----- >What are some of your policies on modifying existing CPVC?
>>> ----- >
>>> ----- >
>>> ----- >
>>> ----- >
>>> ----- >
>>> ----- >Chris Cahill, P.E.
>>> ----- >
>>> ----- >Fire Protection Engineer
>>> ----- >
>>> ----- >Sentry Fire Protection, Inc.
>>> ----- >
>>> ----- >
>>> ----- >
>>> ----- >763-658-4483
>>> ----- >
>>> ----- >763-658-4921 fax
>>> ----- >
>>> ----- >
>>> ----- >
>>> ----- >Email: [EMAIL PROTECTED]
>>> ----- >
>>> ----- >
>>> ----- >
>>> ----- >Mail: P.O. Box 69
>>> ----- >
>>> ----- >        Waverly, MN 55390
>>> ----- >
>>> ----- >
>>> ----- >
>>> ----- >Location: 4439 Hwy 12 SW
>>> ----- >
>>> ----- >              Waverly, MN 55390
>>> ----- >
>>> ----- >
>>> ----- >
>>> ----- >_______________________________________________
>>> ----- >Sprinklerforum mailing list
>>> ----- >[email protected]
>>> -----
>http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
>>> ----- >
>>> ----- >To Unsubscribe, send an email
>>> ----- >to:[EMAIL PROTECTED]
>>> ----- >(Put the word unsubscribe in the subject field)
>>>
>>> _______________________________________________
>>> Sprinklerforum mailing list
>>> [email protected]
>>> http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
>>>
>>> To Unsubscribe, send an email
to:[EMAIL PROTECTED]
>>> (Put the word unsubscribe in the subject field)
>>>       
>> Todd G. Williams, PE
>> Fire Protection Design/Consulting
>> Stonington, Connecticut
>> www.fpdc.com
>> 860.535.2080
>> _______________________________________________
>> Sprinklerforum mailing list
>> [email protected]
>> http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
>>
>> To Unsubscribe, send an email
to:[EMAIL PROTECTED]
>> (Put the word unsubscribe in the subject field)
>>
>>     
>
>
>   
We are in the middle of renewing our general liability insurance and 
every insurer wants a mandatory 24 hour cure time on CPVC regardless of 
size, ambient temperature or whether renovation or new. We have even had

two companies that would refuse to insure if the 24 hour cure time did 
not become company policy.
Jim Deason
Priority Fire Protection, Inc.
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum

To Unsubscribe, send an email
to:[EMAIL PROTECTED]
(Put the word unsubscribe in the subject field)



_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum

To Unsubscribe, send an email
to:[EMAIL PROTECTED]
(Put the word unsubscribe in the subject field)

_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum

To Unsubscribe, send an email
to:[EMAIL PROTECTED]
(Put the word unsubscribe in the subject field)



_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum

To Unsubscribe, send an email to:[EMAIL PROTECTED]
(Put the word unsubscribe in the subject field)

Reply via email to