they may not matter, in terms of performance, but sometimes the intention of the specifications is to force a design area using the Density/Area method. the owner intends to pay for the full 1,500 ft² DA, (before QR reductions). But the smart contractors come back and subvert the intention with the room design method.
i know, it meets Code. But when a client is willing to pay (or does pay through the bid process) for a fullER design area, and does not get it... that chaps my jingle bells. scot deal excelsior fire engineering _______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum To Unsubscribe, send an email to:[EMAIL PROTECTED] (Put the word unsubscribe in the subject field)
