they may not matter, in terms of performance,

but sometimes the intention of the specifications
is to force a design area using the Density/Area
method.   the owner intends to pay for the full
1,500 ft² DA, (before QR reductions).  But
the smart contractors come back
and subvert the intention with the room design
method.

i know, it meets Code.

But when a client is willing to pay (or does
pay through the bid process) for a fullER
design area, and does not get it... that
chaps my jingle bells.

scot deal
excelsior fire engineering
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum

To Unsubscribe, send an email to:[EMAIL PROTECTED]
(Put the word unsubscribe in the subject field)

Reply via email to