For the AHJ's among us...
We have a job did not put hangers on the tie in pieces in the peak of a grid because they are so tight to the sheetrock etc, and the inspector wants them added. When I reread the code it states that hangers are to be installed on every "section" of piping and I have NEVER seen a job with hangers like that. The tie in piece is approximately 3'-0" long an there are hangers on the end of each piece adjacent to this length. The pipe size is 2-1/2" and it penetrates a fire rated wall. Thank you, Greg McGahan Living Water Fire Protection, LLC 1160 McKenzie Road Cantonment, FL 32533 850-937-1850 Fax: 850-937-1852 _______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum To Unsubscribe, send an email to:[EMAIL PROTECTED] (Put the word unsubscribe in the subject field)