We have a job did not put hangers on the tie in pieces in the peak of a grid
because they are so tight to the sheetrock etc, and the inspector wants them
added. When I reread the code it states that hangers are to be installed on
every "section" of piping and I have NEVER seen a job with hangers like
that. 

 

The tie in piece is approximately 3'-0" long an there are hangers on the end
of each piece adjacent to this length. The pipe size is 2-1/2" and it
penetrates a fire rated wall.

 

 

Thank you,

Greg McGahan

 

Living Water Fire Protection, LLC

1160 McKenzie Road

Cantonment, FL 32533

850-937-1850

Fax: 850-937-1852

 