I have a project we designed the Dry System with 7 SD Attic heads. The ME wants the Area and Slope increases per 11.2.3.2.4 and 11.2.3.2.5. I pointed out the listing of the Attic heads but all he says is " If it's OK with the Local AHJ, he takes " no exception to that design approach" but he will not stamp the drawings saying this, even tho he DID stamp the first set " rejected/ resubmit"!
LOcal AHJ requires plans to be stamped by the EOR or the Architect prior to submission, and the Architect won't stamp them " because". Trying to build a case that what we did is " per NFPA 13 and industry standard. Any thoughts? Dennis Browning Browning Fire Medford, Oregon _______________________________________________ Sprinklerforum mailing list http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum For Technical Assistance, send an email to: [EMAIL PROTECTED] To Unsubscribe, send an email to:[EMAIL PROTECTED] (Put the word unsubscribe in the subject field)