I have a project we designed the Dry System with  7 SD Attic heads. The ME 
wants the Area and Slope increases per 11.2.3.2.4 and 11.2.3.2.5. I pointed out 
the listing of the Attic heads but all he says is " If it's OK with the Local 
AHJ, he takes " no exception to that design approach" but he will not stamp the 
drawings saying this, even tho he DID stamp the first set " rejected/ 
resubmit"! 

LOcal AHJ requires plans to be stamped by the EOR or the Architect prior to 
submission, and the Architect won't stamp them " because".

Trying to build a case that what we did is " per NFPA 13 and industry standard. 
Any thoughts?