You got it bucko!  Con sarnt contraktors always trying to cheat the system out 
of its due!  It's downright Un-American to not follow the plan, people got ta 
eat ya know!    ;) 


Craig L. Prahl, CET   
Fire Protection Specialist
Mechanical Department
CH2MHILL
Lockwood Greene
1500 International Drive
PO Box 491, Spartanburg, SC  29304-0491
Direct - 864.599.4102
Fax - 864.599.8439
[email protected]
http://www.ch2m.com 


-----Original Message-----
From: [email protected] 
[mailto:[email protected]] On Behalf Of Fletcher, Ron
Sent: Thursday, March 26, 2009 10:03 AM
To: [email protected]
Subject: RE: Does NFPA 13 require as-built drawings

So we should submit preliminary plans and get them permitted (A.22.1), submit 
working plans and get them approved (22.1.1 & A.22.1), get the permission of 
the AHJ every time we deviate from the approved working plan (22.1.2) and after 
all our deviations are approved we should submit the "corrected working plans" 
(Bill Brooks) for approval?

Ron Fletcher
Aero Automatic Sprinkler
21605 N. Central Ave
Phoenix, AZ 85024
P: 623.580.7836
F: 623.434.3420
C: 602.763.4160

-----Original Message-----
From: [email protected]
[mailto:[email protected]] On Behalf Of George Church
Sent: Thursday, March 26, 2009 12:49 AM
To: [email protected]
Subject: RE: Does NFPA 13 require as-built drawings

Then there's the contractual thing, where they make minor changes like the 
ceiling guy turns the pattern 90* or shifts it, but they don't want to pay you 
to make the change. Why should we?

Glc
Under 2002 #13 still.

-----Original Message-----
From: [email protected]
[mailto:[email protected]] On Behalf Of Todd Williams
Sent: Wednesday, March 25, 2009 8:01 PM
To: [email protected]
Subject: RE: Does NFPA 13 require as-built drawings

Reality check. "As-builts" are a separate document. They are usually generated 
from the original design drawing and the fitter's field notes (if he kept 
them). As to an as-built being exact - good luck. 
Contractors may keep some notes on what they change, but they are hardly an 
EXACT duplicate of what is installed (and the assumption is that the designer 
has access to them). Consequently, as-built drawings at best give you an idea 
of major changes (main and sprinkler locations) but are far from perfect. There 
is not enough money or time in any design job for the designer to go out and 
map out every piece of pipe installed. "If pipe lengths and fittings have 
changed..."? Outside of number of heads, what else would change? So every job 
would have to be re-calced. Also, if we have to wait for AHJ approval before 
any changes are made (22.1.2), nothing will ever get finished. In a perfect 
world, you are right, but this ain't a perfect world.


At 07:34 PM 3/25/2009, you wrote:
>I think the "as-built" term is a commonly used misnomer, somehow 
>distinguishing the document used to install a system from some "extra"
>document you leave behind for the owner to use later.  The proper term 
>for "as-built" should be "corrected working plan" representing the 
>completion of something that's required from the beginning.  I'm not 
>saying the as-built has to be cadded up like the original.  NFPA 13 is 
>silent on this.  However, the drawing left behind has to be EXACTLY
what
>is installed, and that redlined drawing has to have the AHJ approval in 
>some manner (22.1.2).  If pipe lengths or fittings have changed, then 
>"corrected hydraulic calculations" are also required.  Otherwise the 
>installer has been paid but hasn't completed the job.
>
>Perhaps our frequent AHJ contributors could weigh in on this one as 
>well.
>
>Bill Brooks
>
>William N. Brooks, P.E.
>Brooks Fire Protection Engineering Inc.
>372 Wilett Drive
>Severna Park, MD 21146
>410-544-3620 Phone
>410-544-3032 FAX
>412-400-6528 Cell
>
>-------- Original Message --------
>Subject: RE: Does NFPA 13 require as-built drawings
>From: "larryshulman" <[email protected]>
>Date: Wed, March 25, 2009 6:11 pm
>To: <[email protected]>
>
>Working plans are for the installation phase, while the "as-built" set 
>is intended for use following the installation. That's why NFPA 13 is 
>silent on the as-built requirement but it appears in NFPA 25.
>
>I agree this appears somewhat awkward, but I suppose there's logic in 
>there somewhere. When you find it, so advise:)
>
>-----Original Message-----
>From: [email protected]
>[mailto:[email protected]] On Behalf Of 
>[email protected]
>Sent: Wednesday, March 25, 2009 2:45 PM
>To: [email protected]
>Subject: Re: Does NFPA 13 require as-built drawings
>
>Okay, but NFPA 25 pertains to maintenance of systems, not installation.
>I understand NFPA is saying: IF there are as-builts, they will be 
>stored, etc.
>
>Forest Wilson
>
>Project Manager
>Cherokee Fire Protection Co.
>3195 Dayton Xenia Rd Ste 900
>Dayton OH 45434
>
>ph: 937-376-2333
>fx: 614-455-4324
>cell: 937-307-5647
>
>Visit our blog: _www.cherokee-fire.blogspot.com_
>(http://www.cherokee-fire.blogspot.com/)
>
>
>FIRE SPRINKLERS SAVE LIVES!!
>
>
>
>NOTICE: The information contained in this email is intended to be
solely
>for
>the use of the named individual or entity to which it is directed and 
>may contain information that is privileged or otherwise confidential. 
>It is not
>
>intended for transmission to, or receipt by, anyone other than the
named
>addressee (or a person authorized to deliver it to the named
addressee).
>It
>should
>not be copied or forwarded to any unauthorized persons. If you have 
>received this electronic mail transmission in error, please delete it 
>from your system without copying or forwarding it, and notify the 
>sender of the error by reply email or by calling Cherokee Fire 
>Protection Co. at 888-347-3079 toll free.
>
>
>
>In a message dated 3/25/2009 5:44:36 P.M. Eastern Daylight Time, 
>[email protected] writes:
>
>Actually you'll find it in NFPA 25 as follows:
>
>" 12.3.2 As-built system installation drawings, original acceptance
test
>records, and device manufacturer's maintenance bulletins shall be 
>retained to assist in the proper care of the system and its 
>components."
>
>_______________________________________________
>Sprinklerforum mailing list
>http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
>For Technical Assistance, send an email to:
>[email protected]
>
>To Unsubscribe, send an email
>to:[email protected]
>(Put the word unsubscribe in the subject field)
>
>
>**************Great Deals on Dell 15" Laptops - Starting at $479 
>(http://pr.atwola.com/promoclk/100126575x1220635228x1201407499/aol?redi
r=ht
t
>p:%2F%2Fad.doub
>leclick.net%2Fclk%3B213153654%3B34689672%3Bo)
>_______________________________________________
>Sprinklerforum mailing list
>http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
>For Technical Assistance, send an email to:
>[email protected]
>
>To Unsubscribe, send an email
>to:[email protected]
>(Put the word unsubscribe in the subject field)
>
>_______________________________________________
>Sprinklerforum mailing list
>http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
>For Technical Assistance, send an email to:
>[email protected]
>
>To Unsubscribe, send an email
>to:[email protected]
>(Put the word unsubscribe in the subject field)
>
>_______________________________________________
>Sprinklerforum mailing list
>http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
>For Technical Assistance, send an email to:
[email protected]
>
>To Unsubscribe, send an email
to:[email protected]
>(Put the word unsubscribe in the subject field)

Todd G. Williams, PE
Fire Protection Design/Consulting
Stonington, Connecticut
www.fpdc.com
860.535.2080
_______________________________________________
Sprinklerforum mailing list
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
For Technical Assistance, send an email to:
[email protected]

To Unsubscribe, send an email
to:[email protected]
(Put the word unsubscribe in the subject field)

_______________________________________________
Sprinklerforum mailing list
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
For Technical Assistance, send an email to:
[email protected]

To Unsubscribe, send an email
to:[email protected]
(Put the word unsubscribe in the subject field)

_______________________________________________
Sprinklerforum mailing list
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
For Technical Assistance, send an email to: [email protected]

To Unsubscribe, send an email to:[email protected]
(Put the word unsubscribe in the subject field)
_______________________________________________
Sprinklerforum mailing list
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
For Technical Assistance, send an email to: [email protected]

To Unsubscribe, send an email to:[email protected]
(Put the word unsubscribe in the subject field)

Reply via email to