Make sure you set up a camera to get video of them taking it down


At 02:02 PM 7/30/2009, you wrote:
>You could consider just throwing up a couple lengths of pipe alongside the
>big openings on their trunk duct, amking sure you're the size of the opening
>+ 6" away from it so you've accommodated the offsets they'd need to get
>around you. Start with the openings just outside the meeting room.
>
>A couple lengths under roof top openings should give them a clue that you're
>serious. In one day you should be able to hang a couple lengths in front of
>several of these, no outlets required, helps you make your point.
>
>-----Original Message-----
>From: [email protected]
>[mailto:[email protected]] On Behalf Of Fletcher, Ron
>Sent: Thursday, July 30, 2009 12:21 PM
>To: [email protected]
>Subject: RE: Renegade HVAC Contractor
>
>At least you are not spending money and time on BIM while all the other
>trades are doing installation. Remember the sprinkler creed "install
>high install first".
>
>Ron Fletcher
>Aero Automatic
>Phoenix
>
>-----Original Message-----
>From: [email protected]
>[mailto:[email protected]] On Behalf Of Brian
>Harris
>Sent: Thursday, July 30, 2009 7:02 AM
>To: [email protected]
>Subject: Renegade HVAC Contractor
>
>I could use a little ammo for an upcoming coordination meeting I have on
>Monday. We are working on a pretty big school and the HVAC sub (per the
>spec) is suppose to be spearheading a set of coordination drawings that
>all subs need to agree on and then sigh off on before "any work can be
>fabricated or installed". These drawings still have not been completed
>and are actually not even close to being done.
>
>Here's where it gets good:
>
>*       He has already begun installing his duct and has actually
>completed
>a couple wings. (without the approved coordination drawings)
>*       He wants to run all his ductwork 8" above ceiling throughout and
>says sprinkler pipe needs to run above him, "that's industry standard"
>!!
>*       He says he's never heard of ductwork being run through the
>joist,
>it's always the sprinkler lines that run up high. (this is in areas with
>ceiling tiles)
>
>I could go on and on but I think you get the point, what I would love to
>have is some hard facts/references that I can provide at the meeting so
>this doesn't turn into a bigger pissing contest than it already has. I
>don't dare release our pipe for fab without the drawings being signed
>off but in the mean time he is installing away!
>
>
>Regards,
>
>                                  <http://www.firstdefensefire.com/>
>
>
>
>
>
>
>
>
>E-mail message checked by Spyware Doctor (6.0.1.441) Database version:
>6.12940 http://www.pctools.com/en/spyware-doctor-antivirus/
>_______________________________________________
>Sprinklerforum mailing list
>http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
>For Technical Assistance, send an email to: [email protected]
>
>To Unsubscribe, send an email to:[email protected]
>(Put the word unsubscribe in the subject field)
>
>_______________________________________________
>Sprinklerforum mailing list
>http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
>For Technical Assistance, send an email to: [email protected]
>
>To Unsubscribe, send an email to:[email protected]
>(Put the word unsubscribe in the subject field)

Todd G. Williams, PE
Fire Protection Design/Consulting
Stonington, Connecticut
www.fpdc.com
860.535.2080  
_______________________________________________
Sprinklerforum mailing list
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
For Technical Assistance, send an email to: [email protected]

To Unsubscribe, send an email to:[email protected]
(Put the word unsubscribe in the subject field)

Reply via email to