Make sure you set up a camera to get video of them taking it down
At 02:02 PM 7/30/2009, you wrote: >You could consider just throwing up a couple lengths of pipe alongside the >big openings on their trunk duct, amking sure you're the size of the opening >+ 6" away from it so you've accommodated the offsets they'd need to get >around you. Start with the openings just outside the meeting room. > >A couple lengths under roof top openings should give them a clue that you're >serious. In one day you should be able to hang a couple lengths in front of >several of these, no outlets required, helps you make your point. > >-----Original Message----- >From: [email protected] >[mailto:[email protected]] On Behalf Of Fletcher, Ron >Sent: Thursday, July 30, 2009 12:21 PM >To: [email protected] >Subject: RE: Renegade HVAC Contractor > >At least you are not spending money and time on BIM while all the other >trades are doing installation. Remember the sprinkler creed "install >high install first". > >Ron Fletcher >Aero Automatic >Phoenix > >-----Original Message----- >From: [email protected] >[mailto:[email protected]] On Behalf Of Brian >Harris >Sent: Thursday, July 30, 2009 7:02 AM >To: [email protected] >Subject: Renegade HVAC Contractor > >I could use a little ammo for an upcoming coordination meeting I have on >Monday. We are working on a pretty big school and the HVAC sub (per the >spec) is suppose to be spearheading a set of coordination drawings that >all subs need to agree on and then sigh off on before "any work can be >fabricated or installed". These drawings still have not been completed >and are actually not even close to being done. > >Here's where it gets good: > >* He has already begun installing his duct and has actually >completed >a couple wings. (without the approved coordination drawings) >* He wants to run all his ductwork 8" above ceiling throughout and >says sprinkler pipe needs to run above him, "that's industry standard" >!! >* He says he's never heard of ductwork being run through the >joist, >it's always the sprinkler lines that run up high. (this is in areas with >ceiling tiles) > >I could go on and on but I think you get the point, what I would love to >have is some hard facts/references that I can provide at the meeting so >this doesn't turn into a bigger pissing contest than it already has. I >don't dare release our pipe for fab without the drawings being signed >off but in the mean time he is installing away! > > >Regards, > > <http://www.firstdefensefire.com/> > > > > > > > > >E-mail message checked by Spyware Doctor (6.0.1.441) Database version: >6.12940 http://www.pctools.com/en/spyware-doctor-antivirus/ >_______________________________________________ >Sprinklerforum mailing list >http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum >For Technical Assistance, send an email to: [email protected] > >To Unsubscribe, send an email to:[email protected] >(Put the word unsubscribe in the subject field) > >_______________________________________________ >Sprinklerforum mailing list >http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum >For Technical Assistance, send an email to: [email protected] > >To Unsubscribe, send an email to:[email protected] >(Put the word unsubscribe in the subject field) Todd G. Williams, PE Fire Protection Design/Consulting Stonington, Connecticut www.fpdc.com 860.535.2080 _______________________________________________ Sprinklerforum mailing list http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum For Technical Assistance, send an email to: [email protected] To Unsubscribe, send an email to:[email protected] (Put the word unsubscribe in the subject field)