I have a fire house which has 3 poles dropping from the living quarters 
to platforms in the apparatus bay. At this point they drop from a separate 
pole to the ground level. These platforms are steel with slots approximately 
1/4 inch by 6 inches long. I piped them out with 155 QR Uprights the same as 
the high ceiling.

Question: Shall/should these heads have a rack type shield to prevent 
cold-solder?

Question:  AHJ wants Intermediate heads so that they dont fuse before upper 
coverage  responds. (He didn't say anything about the heads under ductwork.) 
Isn't this backward thinking? I would think you would want the closest head 
to activate first. Right?

Thomas