I'd combine Craig's 4 and 5 and add a new 5 water supply analysis.  Otherwise 
that is what the A/E should focus on.

Chris
-----Original Message-----
From: <[email protected]>
Sender: [email protected]
Date: Thu, 10 Mar 2011 06:37:18 
To: <[email protected]>
Reply-To: [email protected]
Subject: RE: top five list

Duane,

When you say consulting are you talking about A/E firms?

In real basic, simple terms (definitely not all inclusive):

A/E Fire Protection Specialist:
1. Obtain description of the use of the occupancy.
2. Identify applicable codes.
3. Identify Insurance Underwriter, Risk Consultant, AHJ and any specific 
additional requirements.
4. Perform fire hazards analysis.
5. Determine fire protection systems design criteria based on hazards analysis, 
applicable codes and any additional requirements.


Contractor:  (not design/build)
1. Obtain A/E drawings or occupancy descriptions
2. Verify water data, code data, system design criteria
3. Throw A/E drawings in the trash*
4. See list of items under heading of A/E above.
5. Prepare installation drawings.


*This is not applicable for all A/E submitted drawings and should not be taken 
as an indictment against any A/E firm its engineers, designers or other related 
staff, their families or pets, living or dead or in a semi-comatose state stuck 
at their desk. Your results may vary.


Craig L. Prahl, CET   
Fire Protection 
CH2MHILL
Lockwood Greene
1500 International Drive
Spartanburg, SCĀ  29304-0491
Direct - 864.599.4102
Fax - 864.599.8439
CH2MHILL Extension  74102
[email protected]



-----Original Message-----
From: [email protected] 
[mailto:[email protected]] On Behalf Of Johnson, Duane 
(NIH/OD/ORS) [C]
Sent: Thursday, March 10, 2011 7:07 AM
To: [email protected]
Subject: top five list

I will be a guest lecturer at the Univ of Md next week.  I will be providing a 
list of must do's while preparing sprinkler drawings.  Knowing that many 
students will be going to work for consulting firms and others to installation 
firms, I want to provide input from both perspectives.  So I ask the forum the 
following questions... here is your chance to provide input to future industry 
personnel:


If you were asked to provide a top 5 list that an engineer should do/identify 
on a sprinkler design, what would they be?


What are the first 5 items a sprinkler designer should do when preparing 
drawings?


Feel free to email me direct.
Thanks.

Duane Johnson, PE
Program Manager
Division of the Fire Marshal (Support Contractor)
Office of Research Services
National Institutes of Health
301-496-0487

"Protecting Science - One Sprinkler at a Time"

_______________________________________________
Sprinklerforum mailing list
[email protected]
http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum

For Technical Assistance, send an email to: [email protected]

To Unsubscribe, send an email to:[email protected]
(Put the word unsubscribe in the subject field)
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum

For Technical Assistance, send an email to: [email protected]

To Unsubscribe, send an email to:[email protected]
(Put the word unsubscribe in the subject field)
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum

For Technical Assistance, send an email to: [email protected]

To Unsubscribe, send an email to:[email protected]
(Put the word unsubscribe in the subject field)

Reply via email to