and a rather accurate opinion. It's just those trying to shift the responsibility for their mistakes that seem to have a problem with such explicit text.

Roland

On Nov 12, 2012, at 2:35 PM, Jim Davidson wrote:

Steve,

What some are trying to do is to make the inspecting contractor responsible for the items missed by the Owner's design team engineers and the AHJ reviewing the original sprinkler system shop drawing. If every one reads NFPA 25 2008 paragraph 1.1.2 "The types of systems addressed by this standard include, but are not limited to, sprinkler, standpipe and hose, fixed water spray, and foam water. Included are the water supplies that are part of these systems, such as private fire service mains and appurtenances, fire pumps and water storage tanks, and valves that control system flow. The document also addresses impairment handling and reporting. This standard applies to fire protection systems that have been properly installed in accordance with generally accepted practices. Where a system has not been installed in accordance with generally accepted practices, the corrective action is beyond the scope of this standard. The corrective action to ensure that the system performs in a satisfactory manner shall be in accordance with the appropriate installation standard." This clearly defines that incorrectly installed systems are not part of this standard, the inspecting contractor should notify the Building Owner of the original system deficiencies found in a separate letter to the Owner and not as part of the NFPA 25 inspection report.

This is just my opinion.

Regards

Jim

-------------- next part --------------
An HTML attachment was scrubbed...
URL: 
<http://fireball.firesprinkler.org/mailman/private/sprinklerforum/attachments/20121112/581f4bb6/attachment.html>
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum

Reply via email to