Here is an interesting question: In the event that you do not have an adequate 
amount of water flow (in terms of GPM) is it acceptable to flow the 4-1/2" 
pumper connection in lieu of the standard 2-1/2" connection on the side ? I 
know that in NFPA 291 it is recommended to only blow off the 2-1/2" outlet but 
when you blow off the pumper connection there is a formula used to reduce it. 
However, even after the formula reduction you still have a far higher amount of 
water (once again, in terms of GPM). My question is this, can you use that GPM 
in your hydraulic calculations ? I would have to think that most AHJ's would be 
hesitant to allow this to be used since you are artificially inflating the 
water supply. 

What does everyone else think ?

              Sean Lockyer
              Project Designer                               4617 Parkbreeze 
Court
              Cell    386-279-1197                              Orlando, 
Florida 32808
              [email protected]              Phone:      407-816-9101
              www.AITLifeSafety.com                       Fax:         
407-816-9104