It is always taken to the flow test point. 

Sharon Alves  
Design Manager
LP Consulting Engineera

Sent from my iPhone

> On Jun 19, 2014, at 6:19 AM, "Brian Harris" <[email protected]> wrote:
> 
> Was just told by one of our new designers that he was taught that it didn't 
> matter where the flow test was taken on the underground that you just need to 
> take it back to the tie in point at the main & that everywhere he's worked 
> does it that way. News to me, any of you guys do it that way? If so how do 
> you account for the loss in the underground to the test hydrant, elevation, 
> etc.... ?
> 
> Brian Harris, CET
> BVS Systems Inc.
> Sprinkler Division
> bvssystemsinc.com<http://bvssystemsinc.com/>
> Phone: 704.896.9989
> Fax: 704.896.1935
> 
> _______________________________________________
> Sprinklerforum mailing list
> [email protected]
> http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org

Reply via email to