Travis- Building isn’t built yet but shop drawings were done and submitted for approval. (2) stories, (6) Zones, (4) stairwells, (4) remote hose valve cabinets, etc. Off the top of my head I’m thinking all the Mains will have to be reconfigured which will also affect some branchlines, new calc’s of course, most likely changes to pipe sizes, etc. Just trying to get an idea of how much additional design time will be needed for cost.
Brian Harris, CET BVS Systems Inc. bvssytemsinc.com<http://bvssystemsinc.com/> From: Sprinklerforum [mailto:[email protected]] On Behalf Of Travis Mack Sent: Tuesday, August 09, 2016 8:32 AM To: [email protected] Subject: Re: Combination Standpipes Hundreds of variables. Construction. BIM. Work installed already. Number of standpipes. Calc and pipe size changes. Travis Mack, SET MFP Design, LLC "Follow" us on Facebook: https://www.facebook.com/pages/MFP-Design-LLC/92218417692 Send large files to MFP Design via: https://www.hightail.com/u/MFPDesign Sent from my iPhone On Aug 9, 2016, at 5:20 AM, Brian Harris <[email protected]<mailto:[email protected]>> wrote: Hypothetical question: You’ve completely designed a (2) story school, 6 zones with a pump, and now the owner/architect has decided to had combination standpipes to the job. What would be your thoughts on the amount of work involved? Brian Harris, CET BVS Systems Inc. Sprinkler Division bvssystemsinc.com<http://bvssystemsinc.com/> Phone: 704.896.9989 Fax: 704.896.1935 _______________________________________________ Sprinklerforum mailing list [email protected]<mailto:[email protected]> http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org
_______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org