Travis-

Building isn’t built yet but shop drawings were done and submitted for 
approval. (2) stories, (6) Zones, (4) stairwells, (4) remote hose valve 
cabinets, etc. Off the top of my head I’m thinking all the Mains will have to 
be reconfigured which will also affect some branchlines, new calc’s of course, 
most likely changes to pipe sizes, etc. Just trying to get an idea of how much 
additional design time will be needed for cost.

Brian Harris, CET
BVS Systems Inc.
bvssytemsinc.com<http://bvssystemsinc.com/>

From: Sprinklerforum [mailto:[email protected]] On 
Behalf Of Travis Mack
Sent: Tuesday, August 09, 2016 8:32 AM
To: [email protected]
Subject: Re: Combination Standpipes

Hundreds of variables. Construction. BIM. Work installed already. Number of 
standpipes. Calc and pipe size changes.
Travis Mack, SET
MFP Design, LLC
"Follow" us on Facebook: 
https://www.facebook.com/pages/MFP-Design-LLC/92218417692
Send large files to MFP Design via:
https://www.hightail.com/u/MFPDesign

Sent from my iPhone

On Aug 9, 2016, at 5:20 AM, Brian Harris 
<[email protected]<mailto:[email protected]>> wrote:
Hypothetical question:

You’ve completely designed a (2) story school, 6 zones with a pump, and now the 
owner/architect has decided to had combination standpipes to the job. What 
would be your thoughts on the amount of work involved?

Brian Harris, CET
BVS Systems Inc.
Sprinkler Division
bvssystemsinc.com<http://bvssystemsinc.com/>
Phone: 704.896.9989
Fax: 704.896.1935

_______________________________________________
Sprinklerforum mailing list
[email protected]<mailto:[email protected]>
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org

Reply via email to