I must admit I'm with DaveF on this. It's immaterial to me whether previous proposed routes were added to osm; this does not feel to me like osm data, what with it not yet existing. But... I presume there's been some previous detailed discussion thread about all of this, since it's quite a significant "object" UK-wise?.
Best Dan 2016-11-29 21:48 GMT+00:00 Dave F <[email protected]>: > I thought it was agreed we weren't mapping pie-in-the-sky proposals. > Primarily because the creator fails to remove them when political will > wanes. > > Perfect for a Leaflet overlay, though. > > DaveF > > > On 29/11/2016 19:19, Andy Robinson wrote: >> >> As it happens the Phase 2b shape files are available. Just rather buried >> under an obscure filename. >> >> I'll post again once I've made the route updates for 2b (Manchester & >> Leeds) >> >> Cheers >> Andy >> >> -----Original Message----- >> From: Andy Robinson [mailto:[email protected]] >> Sent: 29 November 2016 16:28 >> To: talk-gb >> Subject: HS2 phase 2a preferred route >> >> Folks, >> >> I've just added the Jan 2016 preferred route alignment for HS2 phase 2a >> (West Midlands to Crewe) along with the associated tags, converted from >> the >> data.gov OGL shapefile to OSM format as per previous HS2 additions I've >> undertaken. All ways are also added into a single relation for ease of >> reference/selection. >> >> The upload sits in one changeset >> https://www.openstreetmap.org/changeset/44037689 >> >> The uploaded data basically duplicates the consultation alignment (with a >> very slight few meter offset) that was uploaded as the Phase 2 >> consultation >> alignment in 2014. Once the OGL shapefiles are available for the now >> preferred phase 2b (Crewe to Manchester & West Midlands to Leeds) I would >> propose to remove the original Phase 2 2014 data from OSM so that the data >> properly reflects Governments now preferred routes and the proper >> distinction between the three main phases of the proposed HS2 (Phase 1, >> Phase 2a & Phase 2b -West and East). This will also eliminate the apparent >> current data duplication over the Phase 2a portion between the West >> Midlands >> and Crewe. >> >> The only data that appears to be missing in the Jan 2016 Phase 2a >> shapefile >> is the proposed HS2 linespeed. I could copy the linespeed data from the >> Phase 2 consultation version though I do not know if it would be entirely >> correct. For now I'll ignore as it can always be added from a suitable >> source later. >> >> Any comments please add them in the changeset comments. >> >> In other rail related updates I made new road layout final changes at >> Norton >> Bridge WCML upgrades near Eccleshall at the weekend. All works are now >> complete there. >> Also for those near Peterborough the new rail diveunder at Werrington has >> just stared detailed design with the contractor now on board for >> construction. >> >> >> Cheers >> Andy >> >> >> >> _______________________________________________ >> Talk-GB mailing list >> [email protected] >> https://lists.openstreetmap.org/listinfo/talk-gb > > > > --- > This email has been checked for viruses by Avast antivirus software. > https://www.avast.com/antivirus > > > > _______________________________________________ > Talk-GB mailing list > [email protected] > https://lists.openstreetmap.org/listinfo/talk-gb _______________________________________________ Talk-GB mailing list [email protected] https://lists.openstreetmap.org/listinfo/talk-gb

