DaveF, Any examples you wish to share of infrastructure/items not removed which were ultimately abandoned?
Cheers Andy -----Original Message----- From: Dave F [mailto:[email protected]] Sent: 29 November 2016 21:48 To: [email protected] Subject: Re: [Talk-GB] HS2 phase 2a preferred route I thought it was agreed we weren't mapping pie-in-the-sky proposals. Primarily because the creator fails to remove them when political will wanes. Perfect for a Leaflet overlay, though. DaveF On 29/11/2016 19:19, Andy Robinson wrote: > As it happens the Phase 2b shape files are available. Just rather > buried under an obscure filename. > > I'll post again once I've made the route updates for 2b (Manchester & > Leeds) > > Cheers > Andy > > -----Original Message----- > From: Andy Robinson [mailto:[email protected]] > Sent: 29 November 2016 16:28 > To: talk-gb > Subject: HS2 phase 2a preferred route > > Folks, > > I've just added the Jan 2016 preferred route alignment for HS2 phase > 2a (West Midlands to Crewe) along with the associated tags, converted > from the data.gov OGL shapefile to OSM format as per previous HS2 > additions I've undertaken. All ways are also added into a single > relation for ease of reference/selection. > > The upload sits in one changeset > https://www.openstreetmap.org/changeset/44037689 > > The uploaded data basically duplicates the consultation alignment > (with a very slight few meter offset) that was uploaded as the Phase 2 > consultation alignment in 2014. Once the OGL shapefiles are available > for the now preferred phase 2b (Crewe to Manchester & West Midlands to > Leeds) I would propose to remove the original Phase 2 2014 data from > OSM so that the data properly reflects Governments now preferred > routes and the proper distinction between the three main phases of the > proposed HS2 (Phase 1, Phase 2a & Phase 2b -West and East). This will > also eliminate the apparent current data duplication over the Phase 2a > portion between the West Midlands and Crewe. > > The only data that appears to be missing in the Jan 2016 Phase 2a > shapefile is the proposed HS2 linespeed. I could copy the linespeed > data from the Phase 2 consultation version though I do not know if it > would be entirely correct. For now I'll ignore as it can always be > added from a suitable source later. > > Any comments please add them in the changeset comments. > > In other rail related updates I made new road layout final changes at > Norton Bridge WCML upgrades near Eccleshall at the weekend. All works > are now complete there. > Also for those near Peterborough the new rail diveunder at Werrington > has just stared detailed design with the contractor now on board for > construction. > > > Cheers > Andy > > > > _______________________________________________ > Talk-GB mailing list > [email protected] > https://lists.openstreetmap.org/listinfo/talk-gb --- This email has been checked for viruses by Avast antivirus software. https://www.avast.com/antivirus _______________________________________________ Talk-GB mailing list [email protected] https://lists.openstreetmap.org/listinfo/talk-gb _______________________________________________ Talk-GB mailing list [email protected] https://lists.openstreetmap.org/listinfo/talk-gb

