On 8/19/2014 8:35 AM, Todd Zuercher wrote:
> The conveyor is slow.  I thought of multiple jets (and this might still be 
> the best way) my only problem is that would be an awful lot of jets and the 
> solenoids to actuate them to cover the conveyor width.
>
> I think one or a small number of mobile jets will be best.
>
> calculating the delay position seems a trivial task.  I assumed the vision 
> would be several feet away from the actual air jet.
>
> The problem of multiple simultaneous pockets to be cleaned, I may be best 
> addressed by telling the humans loading the conveyor to avoid it.

What about a flipper device to turn the pieces pocket side down onto an 
open mesh belt, perhaps with a vibrator to knock the sawdust loose? Are 
the pieces picked off the belt by people or machinery? If it's people 
then there shouldn't be a need to flip the pieces back over.


---
This email is free from viruses and malware because avast! Antivirus protection 
is active.
http://www.avast.com


------------------------------------------------------------------------------
_______________________________________________
Emc-users mailing list
Emc-users@lists.sourceforge.net
https://lists.sourceforge.net/lists/listinfo/emc-users

Reply via email to