On 8/19/2014 8:35 AM, Todd Zuercher wrote: > The conveyor is slow. I thought of multiple jets (and this might still be > the best way) my only problem is that would be an awful lot of jets and the > solenoids to actuate them to cover the conveyor width. > > I think one or a small number of mobile jets will be best. > > calculating the delay position seems a trivial task. I assumed the vision > would be several feet away from the actual air jet. > > The problem of multiple simultaneous pockets to be cleaned, I may be best > addressed by telling the humans loading the conveyor to avoid it.
What about a flipper device to turn the pieces pocket side down onto an open mesh belt, perhaps with a vibrator to knock the sawdust loose? Are the pieces picked off the belt by people or machinery? If it's people then there shouldn't be a need to flip the pieces back over. --- This email is free from viruses and malware because avast! Antivirus protection is active. http://www.avast.com ------------------------------------------------------------------------------ _______________________________________________ Emc-users mailing list Emc-users@lists.sourceforge.net https://lists.sourceforge.net/lists/listinfo/emc-users