On 01/05/2008, at 11:52 AM, Evan Worley wrote:
I was not clear as to what Wendy was referring to. She might have
seen
something in the stack trace that triggered that comment about the
embedder,
it was unclear to me.
Ah, I see - I was thrown by your switching to 2.1-SNAPSHOT, thinking
that was only necessary for the embedder, but it seems some of the
tests depend on a certain version of maven-artifact also (which is the
wagon manager interface that the stub tests).
We should set the versions to 2.0.8 or 2.0.9 and probably rollback
changes to this stub that are dependant on 2.1 - as Wendy said the
embedded version of 2.1 that was required for the VS integration
shouldn't be required based on the previous list discussion. Anyone
able to give that a shot?
I haven't tried building it recently, but when I did I was using a set
of binaries of Maven built from trunk around July last year. I can
contrib either the binaries or the SVN rev it was built from, but
probably better to get it back to 2.0.x anyway.
Cheers,
Brett
--
Brett Porter
[EMAIL PROTECTED]
http://blogs.exist.com/bporter/