On 01/05/2008, at 11:52 AM, Evan Worley wrote:

I was not clear as to what Wendy was referring to. She might have seen something in the stack trace that triggered that comment about the embedder,
it was unclear to me.

Ah, I see - I was thrown by your switching to 2.1-SNAPSHOT, thinking that was only necessary for the embedder, but it seems some of the tests depend on a certain version of maven-artifact also (which is the wagon manager interface that the stub tests).

We should set the versions to 2.0.8 or 2.0.9 and probably rollback changes to this stub that are dependant on 2.1 - as Wendy said the embedded version of 2.1 that was required for the VS integration shouldn't be required based on the previous list discussion. Anyone able to give that a shot?

I haven't tried building it recently, but when I did I was using a set of binaries of Maven built from trunk around July last year. I can contrib either the binaries or the SVN rev it was built from, but probably better to get it back to 2.0.x anyway.

Cheers,
Brett

--
Brett Porter
[EMAIL PROTECTED]
http://blogs.exist.com/bporter/

Reply via email to