Jakub M. wrote:
>OK, tried this one, but when I load netlist I see that there is only one >copy of analog channel and there should be 20 copies of it. Did I do >something wrong with the annotation? > > First, you have to instantiate the 20 sub-sheets on the main (or other) sheet, then do the flatten hierarchy, which will "expand" the 20 instances of the sheet symbol into 20 actual sheets with different names. >Also, I do not understand how should I load this pre-made PCB (for the >analog channel for instance) > > > Uhhh, it doesn't, period. You can duplicate the pre-made block once it is in the clipboard, but the reannotating is not simple or automatic. If you named the parts in the right scheme, then you can select each channel and global edit all the component identifiers at once, so it takes 20 global edits. That sounds awful, but really can be done, in, maybe 10 minutes. Jon ____________________________________________________________ You are subscribed to the PEDA discussion forum To Post messages: mailto:[email protected] Unsubscribe and Other Options: http://techservinc.com/mailman/listinfo/peda_techservinc.com Browse or Search Old Archives (2001-2004): http://www.mail-archive.com/[email protected] Browse or Search Current Archives (2004-Current): http://www.mail-archive.com/[email protected]
