Davis-Besse does not require a source check of an instrument due to its 
use for downposting.   In use instruments are source checked daily and 
would have an acceptable response check prior to use and after return, but 
not a source check.


Douglas L. Noble
Manager - Radiation Protection
Davis-Besse Nuclear Power Station
(419) 321-7780 office
(419) 304-0068  cell




From:   John Sukosky <[email protected]>
To:     "[email protected]" <[email protected]>
Cc:     Duane Boone <[email protected]>
Date:   04/09/2012 11:09 AM
Subject:        Powernet: Quick Posting Question
Sent by:        [email protected]



Surry Power Station would like to know if you require survey instruments 
used to down post High Radiation Areas to be source checked after the down 
posting survey is completed?
 
At Surry, survey instruments used to down post HRA are source checked 
after the down posting survey is completed.
 
Thanks,
 
 
John M. Sukosky, CHP
Health Physicist III
Radiological Protection, Surry Power Station
 
Dominion Generation
Phone: 757-365-2594; Internal: 8-798-2594
Fax: 757-365-2668
Pager: 804-273-3030 3636; E-mail: [email protected]
 
 
 
From: [email protected] [mailto:[email protected]] On Behalf 
Of [email protected]
Sent: Wednesday, March 21, 2012 7:52 PM
To: [email protected]
Subject: RE: Powernet: Quick Question (Outage Dose Goal Revision?)
 
Under these conditions Palo Verde would convene an ALARA Committee meeting 
and revise the outage dose goal upward; conversely, if conditions were 
much lower than anticipated we would use the same process to lower the 
goal.  Fortunately, we have done the latter numerous times.  The upward 
revision based on emergent work / scope change is also approved by the 
ALARA Committee as a stretch goal (amount estimated above the original 
estimate).  While the final reported RFO dose would include all work, the 
ALARA incentives offered to employees are based on the original dose 
estimation; thereby. not penalizing (and disincentivizing) them because of 
conditions beyond their control.
 
 
From: [email protected] [mailto:[email protected]] On Behalf 
Of [email protected]
Sent: Thursday, February 23, 2012 1:05 AM
To: [email protected]
Subject: Powernet: Quick Question (Outage Dose Goal Revision?)
 
At SONGS, the outage dose goal is set prior to the outage like all sites. 
At the onset of the outage, we had  higher than expected dose rates (crud 
burst with new generators) and revised our outage dose goal accordingly. 
Would your site have revised the outage goal is similar event occurred?   

In addition, during the outage it has been determined that additional 
emergent work will be required to support increased inspections on our 
steam generators which is dose impacting.  Would your site revise your 
outage dose goal a second time based upon the increased emergent work 
expected?  Or would your site maintain your revised dose goal as is and 
track the emergent dose as separate goal? 

Thanks, 

"Stevie Ray" Vaughan 
[email protected] 
----------------------------------- Powernet - a service of the Health 
Physics Society Power Reactor Section Powernet archives at 
http://www.mail-archive.com/[email protected]/ Reply to: [email protected] 
If Questions, contact Mike Russell, CHP at [email protected] 
--- NOTICE ---

This message is for the designated recipient only and may contain 
confidential, privileged or proprietary information.  If you have received 
it in error, please notify the sender immediately and delete the original 
and any copy or printout.  Unintended recipients are prohibited from 
making any other use of this e-mail.  Although we have taken reasonable 
precautions to ensure no viruses are present in this e-mail, we accept no 
liability for any loss or damage arising from the use of this e-mail or 
attachments, or for any delay or errors or omissions in the contents which 
result from e-mail transmission.

CONFIDENTIALITY NOTICE: This electronic message contains information which 
may be legally confidential and/or privileged and does not in any case 
represent a firm ENERGY COMMODITY bid or offer relating thereto which 
binds the sender without an additional express written confirmation to 
that effect. The information is intended solely for the individual or 
entity named above and access by anyone else is unauthorized. If you are 
not the intended recipient, any disclosure, copying, distribution, or use 
of the contents of this information is prohibited and may be unlawful. If 
you have received this electronic transmission in error, please reply 
immediately to the sender that you have received the message in error, and 
delete it. Thank you.



-----------------------------------------
The information contained in this message is intended only for the
personal and confidential use of the recipient(s) named above. If
the reader of this message is not the intended recipient or an
agent responsible for delivering it to the intended recipient, you
are hereby notified that you have received this document in error
and that any review, dissemination, distribution, or copying of
this message is strictly prohibited. If you have received this
communication in error, please notify us immediately, and delete
the original message.

Reply via email to