After spending a year talking about Cx, I can't give you a warm and fuzzy feeling that a commissioning agent is going to do much more than document the errors, get the obvious corrected, and wouldn't surprise me if there are issues logs with some skeletons buried in the As Builts and O&M's.
Same as so many threads on this Forum- there aren't enough skilled workers to do everything that needs skill, and so those of us that "get it" are frustrated cause we know we can all do better, and we try to accommodate the appearance of Murphy at every step- and still be low bidder, or low enough to get a chance at selling something besides just cheap. I suspect this will be accentuated when we face 16+ bidders on most jobs this year. Glc The above certainly isn't an opinion from NFPA. -----Original Message----- From: [EMAIL PROTECTED] [mailto:[EMAIL PROTECTED] On Behalf Of Ron Greenman Sent: Tuesday, November 11, 2008 2:15 PM To: [email protected] Subject: Re: White papers and definition of roles This si why a commissioning agent is necessary from the start of the project throughout the life of the building is necessary. Of course that costs money and guys that can afford buildings big enough to have big time coordination problems have to be pretty rich and they, "...didn't get rich by writing a lot of checks." (Bill Gates to Homer Simpson just before the Microsoft goons "buy out" Homer's undefined internet business.) Commissioners cost money and it appears to be far cheaper (though it's not) to let the contractors fight it out. On Tue, Nov 11, 2008 at 10:56 AM, GAYLE KNOWLES <[EMAIL PROTECTED]> wrote: > > that's right, what Ron said. And besides the fact, we all know where the design problems are in all the different constructions and occupancies when we prepare our bids. The 3D is great if everyone sits done at the table during the construction meetings and signs off on coordination drawings showing elevations etc. Doesn't do much good in bidding, when the electrician decides to run his cable trays wherever he wants after the fact. If your bid is that tight, counting on the electrician to run his trays "as shown conceptually", you are out of luck.> Date: Tue, 11 Nov 2008 11:13:32 -0700> From: [EMAIL PROTECTED]> To: [email protected]> Subject: RE: White papers and definition of roles> > Right on George. With all the special systems I would expect more than> $2k difference in the specialty equipment quotes and the prices should> be closer if you take away the opportunity for innovation of design by> the bidders.> > Our prices are higher on jobs requiring 3D or BIM. We find there is very> little coordination and more "here is where we are so now you> (sprinkler) can go around us. It's like a 3D retrofit. The only thing> that changes is we spend more design time to come up with the same> product. Besides we FP contractors have been doing 3D since the> beginning of time, it's just that the presentation has been 2D.> > Ron Fletcher> Aero Automatic> Phoenix, AZ> > -----Original Message-----> From: [EMAIL PROTECTED]> [mailto:[EMAIL PROTECTED] On Behalf Of George> Church> Sent: Tuesday, November 11, 2008 7:00 AM> To: [email protected]> Subject: RE: White papers and definition of roles> > Ummm, maybe the two bidders had breakfast together on bid morning?> Don't throw your elbow out patting yourself on the back.> > Coincidence or a comp price is far more likely to produce bids within> .001%> of each other than quality of the bid documents. > > Seriously, if you'd given em a stocklist, a finished, coordinated dwg,> and a> rational schedule, there'd be more difference in the price than this> just on> how different companies allocate OH, backlog needs, lift pricing renting> vrs> owning, mileage from office to site variance, mix of each contractor's> design talent pool $ cost, workman's comp experience reflected in what> could> be drastically different rates, skill of the two estimators, whether> someone> got something last night- > There are so many variables, I'd suspect a comp number before a headless> piping layout as the root cause for the close resemblance.> > glc> > -----Original Message-----> From: [EMAIL PROTECTED]> [mailto:[EMAIL PROTECTED] On Behalf Of> [EMAIL PROTECTED]> Sent: Tuesday, November 11, 2008 8:46 AM> To: [email protected]> Subject: RE: White papers and definition of roles> > Speaking of bid prices. We performed our first AutoCAD based 3D> integration> of fire protection on a recent project. Our typical corporate> deliverable> is the design criteria and a floor plan with equipment on it. (I have> had a> couple complete installation level design requests but they are rare in> this> industry) Typical criteria based design, no piping, or heads or> anything> else. (because the contractor will do it for free). Anyway, as we've> progressed into the 3D realm I've pushed to get fire protection included> in> the 3D modeling. Convincing the powers that be that by at least> including> mains and branch lines into the model and coordinating their locations> and> elevations will aid the contractor during installation, reduce his> design> time and reduce change orders and bring us tighter bids as there is less> for> the imagination and more solid information to work with.> > So they let us do the piping layout but no heads, so we did the layout> in> the model dealing with equipment, steel and other modeled obstructions.> > > Two weeks ago the project went out for bids. We had 3 bidders. One> dropped> out due to various personal reasons but the bids came back yesterday> from> the other two.> > The fire protection bids on the project were within $2,000 of each> other.> Now that may not sound like a big deal but understand the total above> ground> fire protection is valued at almost $1.5 million dollars. > > For two bidders to be that close is pretty unusual. But it validated> the> need for better design other than the old floor plan with the note> "follow> NFPA 13" and similar stuff.> > Hopefully we can continue this trend within our company. I know this> would> be difficult for many companies because there is a lack of qualified> people> who can actually layout a fire protection system and this project ran> the> gamut of system types from wet, dry, pre-action, foam-water deluge, low> expansion foam, dry chemical, CO2 and a proprietary, IR triggered, high> speed, deluge curtain system (that is really cool by the way). > > Now I'm hoping that our management sees the value in this effort and> will> continue down this path. Convincing some to allow us to provide more> than> the bare minimum of fire protection information is a tough fight. For> whatever reason is has been for years. Maybe it has to do with the lack> of> qualified people, some of it is based on economics, some of it is> perceived> value, like I said, most AE firms feel the contractor provides the> engineering effort for free so why do anything other than a spec and> some> fancy notes.> > I actually had one PM complain that the sprinkler contractors ALWAYS put> their pipe in the wrong place and it has to be torn down and removed.> He> caught me on a good day so I graciously (stop snickering) reminded him> of> the directive we typically give sprinkler contractors: 1. coordinate> with> everyone and everything. But at the same time all we give them is a> floor> plan of the building, no process piping layouts (because there is no> such> animal), no steel plans, no duct layouts, etc. So how can he coordinate> with things that don't exist or haven't been designed yet? Hence my> sales> pitch for getting it in the model and then giving that info to the> contractor. > > But this is one I will put in the WIN column. They come far and few> between> so forgive me while I savor the moment....................> > > > > Craig L. Prahl, CET > Fire Protection Specialist> Mechanical Department> CH2MHILL> Lockwood Greene> 1500 International Drive> PO Box 491, Spartanburg, SC 29304-0491> Direct - 864.599.4102> Fax - 864.599.8439> [EMAIL PROTECTED]> http://www.ch2m.com > > > -----Original Message-----> From: [EMAIL PROTECTED]> [mailto:[EMAIL PROTECTED] On Behalf Of Mark> Sornsin> Sent: Monday, November 10, 2008 6:16 PM> To: '[email protected]'> Subject: RE: White papers and definition of roles> > Then there are those jurisdictions such as ND where you not only don't> get> registered in a specific discipline, but complaints will not be> investigated> unless there is a problem with the design. E.g., simply being trained in> structural engineering and signing someone's sprinkler system design is> not> a problem that will be investigated. It may violate the engineers' code> of> ethics, but it won't see action from the State Board unless there arises> some issue with the design. So if you're a PE not trained in sprinkler> design, just get some non-PE designer to complete the work and then you> can> seal it. Effectively there is no problem. If the building burns as a> result> of improper design, then you've got a problem.> > Of course, how many MEs even attempt to design a system? It's pretty> difficult to hold an engineer to the fire when his "design" boils down> to> "do it per code." I have had MEs ask me why I would ever attempt to> provide> a complete sprinkler system design. They wonder, "doesn't that expose> you> to more liability?" Gee, and here I thought design and the associated> liability was the whole point of our profession.> > But that leads us right back to Thom's point about doing whatever is> easiest. And when an ME gets paid on a percentage of construction,> there's> no sense putting time into a project and exposing himself to more> liability.> Besides, his lack of effort will typically result in higher bid prices> and> therefore higher fees. And the contractors don't want to rock the boat> because the engineer may make their life more difficult. So the cycle> continues.> > I ought to write an article...> > Mark A. Sornsin, PE> Fire Protection Engineer> Ulteig Engineers, Inc.> 3350 38th Avenue S.> Fargo, ND 58104-7079> > [EMAIL PROTECTED]> > _______________________________________________> Sprinklerforum mailing list> http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum> For Technical Assistance, send an email to:> [EMAIL PROTECTED]> > To Unsubscribe, send an email> to:[EMAIL PROTECTED]> (Put the word unsubscribe in the subject field)> > _______________________________________________> Sprinklerforum mailing list> http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum> For Technical Assistance, send an email to:> [EMAIL PROTECTED]> > To Unsubscribe, send an email> to:[EMAIL PROTECTED]> (Put the word unsubscribe in the subject field)> > _______________________________________________> Sprinklerforum mailing list> http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum> For Technical Assistance, send an email to: [EMAIL PROTECTED]> > To Unsubscribe, send an email to:[EMAIL PROTECTED]> (Put the word unsubscribe in the subject field)_______________________________________________ > Sprinklerforum mailing list > http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum > For Technical Assistance, send an email to: [EMAIL PROTECTED] > > To Unsubscribe, send an email to:[EMAIL PROTECTED] > (Put the word unsubscribe in the subject field) > -- Ron Greenman at home.... _______________________________________________ Sprinklerforum mailing list http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum For Technical Assistance, send an email to: [EMAIL PROTECTED] To Unsubscribe, send an email to:[EMAIL PROTECTED] (Put the word unsubscribe in the subject field) _______________________________________________ Sprinklerforum mailing list http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum For Technical Assistance, send an email to: [EMAIL PROTECTED] To Unsubscribe, send an email to:[EMAIL PROTECTED] (Put the word unsubscribe in the subject field)