But I have seen it work and so as the eternal optimist....On the other
hand, to paraphrase a character from Blood Diamond: My heart tells me
it is the answer, though my experience would suggest otherwise.

On Tue, Nov 11, 2008 at 12:05 PM, George Church <[EMAIL PROTECTED]> wrote:
> After spending a year talking about Cx, I can't give you a warm and fuzzy
> feeling that a commissioning agent is going to do much more than document
> the errors, get the obvious corrected, and wouldn't surprise me if there are
> issues logs with some skeletons buried in the As Builts and O&M's.
>
> Same as so many threads on this Forum- there aren't enough skilled workers
> to do everything that needs skill, and so those of us that "get it" are
> frustrated cause we know we can all do better, and we try to accommodate the
> appearance of Murphy at every step- and still be low bidder, or low enough
> to get a chance at selling something besides just cheap.
>
> I suspect this will be accentuated when we face 16+ bidders on most jobs
> this year.
>
> Glc
> The above certainly isn't an opinion from NFPA.
>
> -----Original Message-----
> From: [EMAIL PROTECTED]
> [mailto:[EMAIL PROTECTED] On Behalf Of Ron Greenman
> Sent: Tuesday, November 11, 2008 2:15 PM
> To: [email protected]
> Subject: Re: White papers and definition of roles
>
> This si why a commissioning agent is necessary from the start of the
> project throughout the life of the building is necessary. Of course
> that costs money and guys that can afford buildings big enough to have
> big time coordination problems have to be pretty rich and they,
> "...didn't get rich by writing a lot of checks." (Bill Gates to Homer
> Simpson just before the Microsoft goons "buy out" Homer's undefined
> internet business.) Commissioners cost money and it appears to be far
> cheaper (though it's not) to let the contractors fight it out.
>
> On Tue, Nov 11, 2008 at 10:56 AM, GAYLE KNOWLES <[EMAIL PROTECTED]> wrote:
>>
>> that's right, what Ron said.  And besides the fact, we all know where the
> design problems are in all the different constructions and occupancies when
> we prepare our bids.  The 3D is great if everyone sits done at the table
> during the construction meetings and signs off on coordination drawings
> showing elevations etc.  Doesn't do much good in bidding, when the
> electrician decides to run his cable trays wherever he wants after the fact.
> If your bid is that tight, counting on the electrician to run his trays "as
> shown conceptually", you are out of luck.> Date: Tue, 11 Nov 2008 11:13:32
> -0700> From: [EMAIL PROTECTED]> To: [email protected]>
> Subject: RE: White papers and definition of roles> > Right on George. With
> all the special systems I would expect more than> $2k difference in the
> specialty equipment quotes and the prices should> be closer if you take away
> the opportunity for innovation of design by> the bidders.> > Our prices are
> higher on jobs requiring 3D or BIM. We find there is very> little
> coordination and more "here is where we are so now you> (sprinkler) can go
> around us. It's like a 3D retrofit. The only thing> that changes is we spend
> more design time to come up with the same> product. Besides we FP
> contractors have been doing 3D since the> beginning of time, it's just that
> the presentation has been 2D.> > Ron Fletcher> Aero Automatic> Phoenix, AZ>
>> -----Original Message-----> From:
> [EMAIL PROTECTED]>
> [mailto:[EMAIL PROTECTED] On Behalf Of George>
> Church> Sent: Tuesday, November 11, 2008 7:00 AM> To:
> [email protected]> Subject: RE: White papers and definition
> of roles> > Ummm, maybe the two bidders had breakfast together on bid
> morning?> Don't throw your elbow out patting yourself on the back.> >
> Coincidence or a comp price is far more likely to produce bids within>
> .001%> of each other than quality of the bid documents. > > Seriously, if
> you'd given em a stocklist, a finished, coordinated dwg,> and a> rational
> schedule, there'd be more difference in the price than this> just on> how
> different companies allocate OH, backlog needs, lift pricing renting> vrs>
> owning, mileage from office to site variance, mix of each contractor's>
> design talent pool $ cost, workman's comp experience reflected in what>
> could> be drastically different rates, skill of the two estimators, whether>
> someone> got something last night- > There are so many variables, I'd
> suspect a comp number before a headless> piping layout as the root cause for
> the close resemblance.> > glc> > -----Original Message-----> From:
> [EMAIL PROTECTED]>
> [mailto:[EMAIL PROTECTED] On Behalf Of>
> [EMAIL PROTECTED]> Sent: Tuesday, November 11, 2008 8:46 AM> To:
> [email protected]> Subject: RE: White papers and definition
> of roles> > Speaking of bid prices. We performed our first AutoCAD based 3D>
> integration> of fire protection on a recent project. Our typical corporate>
> deliverable> is the design criteria and a floor plan with equipment on it.
> (I have> had a> couple complete installation level design requests but they
> are rare in> this> industry) Typical criteria based design, no piping, or
> heads or> anything> else. (because the contractor will do it for free).
> Anyway, as we've> progressed into the 3D realm I've pushed to get fire
> protection included> in> the 3D modeling. Convincing the powers that be that
> by at least> including> mains and branch lines into the model and
> coordinating their locations> and> elevations will aid the contractor during
> installation, reduce his> design> time and reduce change orders and bring us
> tighter bids as there is less> for> the imagination and more solid
> information to work with.> > So they let us do the piping layout but no
> heads, so we did the layout> in> the model dealing with equipment, steel and
> other modeled obstructions.> > > Two weeks ago the project went out for
> bids. We had 3 bidders. One> dropped> out due to various personal reasons
> but the bids came back yesterday> from> the other two.> > The fire
> protection bids on the project were within $2,000 of each> other.> Now that
> may not sound like a big deal but understand the total above> ground> fire
> protection is valued at almost $1.5 million dollars. > > For two bidders to
> be that close is pretty unusual. But it validated> the> need for better
> design other than the old floor plan with the note> "follow> NFPA 13" and
> similar stuff.> > Hopefully we can continue this trend within our company. I
> know this> would> be difficult for many companies because there is a lack of
> qualified> people> who can actually layout a fire protection system and this
> project ran> the> gamut of system types from wet, dry, pre-action,
> foam-water deluge, low> expansion foam, dry chemical, CO2 and a proprietary,
> IR triggered, high> speed, deluge curtain system (that is really cool by the
> way). > > Now I'm hoping that our management sees the value in this effort
> and> will> continue down this path. Convincing some to allow us to provide
> more> than> the bare minimum of fire protection information is a tough
> fight. For> whatever reason is has been for years. Maybe it has to do with
> the lack> of> qualified people, some of it is based on economics, some of it
> is> perceived> value, like I said, most AE firms feel the contractor
> provides the> engineering effort for free so why do anything other than a
> spec and> some> fancy notes.> > I actually had one PM complain that the
> sprinkler contractors ALWAYS put> their pipe in the wrong place and it has
> to be torn down and removed.> He> caught me on a good day so I graciously
> (stop snickering) reminded him> of> the directive we typically give
> sprinkler contractors: 1. coordinate> with> everyone and everything. But at
> the same time all we give them is a> floor> plan of the building, no process
> piping layouts (because there is no> such> animal), no steel plans, no duct
> layouts, etc. So how can he coordinate> with things that don't exist or
> haven't been designed yet? Hence my> sales> pitch for getting it in the
> model and then giving that info to the> contractor. > > But this is one I
> will put in the WIN column. They come far and few> between> so forgive me
> while I savor the moment....................> > > > > Craig L. Prahl, CET >
> Fire Protection Specialist> Mechanical Department> CH2MHILL> Lockwood
> Greene> 1500 International Drive> PO Box 491, Spartanburg, SC 29304-0491>
> Direct - 864.599.4102> Fax - 864.599.8439> [EMAIL PROTECTED]>
> http://www.ch2m.com > > > -----Original Message-----> From:
> [EMAIL PROTECTED]>
> [mailto:[EMAIL PROTECTED] On Behalf Of Mark>
> Sornsin> Sent: Monday, November 10, 2008 6:16 PM> To:
> '[email protected]'> Subject: RE: White papers and definition
> of roles> > Then there are those jurisdictions such as ND where you not only
> don't> get> registered in a specific discipline, but complaints will not be>
> investigated> unless there is a problem with the design. E.g., simply being
> trained in> structural engineering and signing someone's sprinkler system
> design is> not> a problem that will be investigated. It may violate the
> engineers' code> of> ethics, but it won't see action from the State Board
> unless there arises> some issue with the design. So if you're a PE not
> trained in sprinkler> design, just get some non-PE designer to complete the
> work and then you> can> seal it. Effectively there is no problem. If the
> building burns as a> result> of improper design, then you've got a problem.>
>> Of course, how many MEs even attempt to design a system? It's pretty>
> difficult to hold an engineer to the fire when his "design" boils down> to>
> "do it per code." I have had MEs ask me why I would ever attempt to>
> provide> a complete sprinkler system design. They wonder, "doesn't that
> expose> you> to more liability?" Gee, and here I thought design and the
> associated> liability was the whole point of our profession.> > But that
> leads us right back to Thom's point about doing whatever is> easiest. And
> when an ME gets paid on a percentage of construction,> there's> no sense
> putting time into a project and exposing himself to more> liability.>
> Besides, his lack of effort will typically result in higher bid prices> and>
> therefore higher fees. And the contractors don't want to rock the boat>
> because the engineer may make their life more difficult. So the cycle>
> continues.> > I ought to write an article...> > Mark A. Sornsin, PE> Fire
> Protection Engineer> Ulteig Engineers, Inc.> 3350 38th Avenue S.> Fargo, ND
> 58104-7079> > [EMAIL PROTECTED]> >
> _______________________________________________> Sprinklerforum mailing
> list> http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum> For
> Technical Assistance, send an email to:> [EMAIL PROTECTED]> > To
> Unsubscribe, send an email> to:[EMAIL PROTECTED]>
> (Put the word unsubscribe in the subject field)> >
> _______________________________________________> Sprinklerforum mailing
> list> http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum> For
> Technical Assistance, send an email to:> [EMAIL PROTECTED]> > To
> Unsubscribe, send an email> to:[EMAIL PROTECTED]>
> (Put the word unsubscribe in the subject field)> >
> _______________________________________________> Sprinklerforum mailing
> list> http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum> For
> Technical Assistance, send an email to: [EMAIL PROTECTED]> > To
> Unsubscribe, send an email to:[EMAIL PROTECTED]> (Put
> the word unsubscribe in the subject
> field)_______________________________________________
>> Sprinklerforum mailing list
>> http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
>> For Technical Assistance, send an email to: [EMAIL PROTECTED]
>>
>> To Unsubscribe, send an email to:[EMAIL PROTECTED]
>> (Put the word unsubscribe in the subject field)
>>
>
>
>
> --
> Ron Greenman
> at home....
> _______________________________________________
> Sprinklerforum mailing list
> http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
> For Technical Assistance, send an email to: [EMAIL PROTECTED]
>
> To Unsubscribe, send an email to:[EMAIL PROTECTED]
> (Put the word unsubscribe in the subject field)
>
> _______________________________________________
> Sprinklerforum mailing list
> http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
> For Technical Assistance, send an email to: [EMAIL PROTECTED]
>
> To Unsubscribe, send an email to:[EMAIL PROTECTED]
> (Put the word unsubscribe in the subject field)
>



-- 
Ron Greenman
at home....
_______________________________________________
Sprinklerforum mailing list
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
For Technical Assistance, send an email to: [EMAIL PROTECTED]

To Unsubscribe, send an email to:[EMAIL PROTECTED]
(Put the word unsubscribe in the subject field)

Reply via email to