My favorite story in the ongoing battle between the professionals is the difficulty Steve Leyton had with a registered PE who informed him that by the virtue of his lack of registration as a PE that he was "unqualified" to discuss the issues related to standpipe design, use, and compliance with NFPA-14. The fact that Steve was a member of the NFPA-14 committee at the time escaped the notice of the individual, and in a delicious moment of irony Steve pointed to his name in the front of the book.
That was a day I'll long cherish.

PARSLEY CONSULTING
Ken Wagoner, SET
760.745.6181 voice
760.745.0537 fax
[EMAIL PROTECTED] <mailto:[EMAIL PROTECTED]> e-mail
www.ParsleyConsulting.com <http://www.ParsleyConsulting.com> website



Ron Greenman wrote:
Once I was called incompetent by the architect because in the field
there was one inch of clear space between the bottom of the beams in a
parking garage and the minimum low clearance for the cars and I
couldn't fit a four inch pipe in the space (and I couldn't touch the
beams. He drew nine inches but the excavator screwed up, the garage
got poured and it was my problem somehow.

On Wed, Nov 12, 2008 at 11:39 AM, Thom McMahon <[EMAIL PROTECTED]> wrote:
Your RIGHT! Because the sprinkler contractor is now the only one that does
his layout in 3D he visualizes all of the problems the others call "Field
Conditions".
Architects get really pissed off when you point out that they and their
consultants didn't co-ordinate space above the ceiling even with their own
structural engineer. Yeah the ceiling to bottom of floor is 36", and there
are recessed lights in the ceiling with lenses that make them 8" deep. And
yes you clearly show the 16x30 duct, and the cable tray and our main is only
6", so what's your problem? COULD IT POSSABLY BE THAT W30 beam we're all
shown crossing?

Since ancient times the builder of empires and Architects have had the same
theory, KILL the messenger!!

Thom McMahon, SET
Firetech, Inc.
2560 Copper Ridge Dr
P.O. Box 882136
Steamboat Springs, CO 80488
Tel:  970-879-7952
Fax: 970-879-7926


-----Original Message-----
From: [EMAIL PROTECTED]
[mailto:[EMAIL PROTECTED] On Behalf Of Todd Williams
- FPDC
Sent: Wednesday, November 12, 2008 10:59 AM
To: [email protected]
Subject: RE: design and coordination roles and responsibilities.

One of the consistent problems we have up here is the electrician.
They don't take part in the coordination process, they often don't even have
CAD drawings and they just run everything where they want.
And the GC's tend to let them get away with a lot of it. I find that more
problems with the architect's concepts surface in the sprinkler design that
any of the other trades.


_______________________________________________
Sprinklerforum mailing list
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
For Technical Assistance, send an email to: [EMAIL PROTECTED]

To Unsubscribe, send an email to:[EMAIL PROTECTED]
(Put the word unsubscribe in the subject field)




_______________________________________________
Sprinklerforum mailing list
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
For Technical Assistance, send an email to: [EMAIL PROTECTED]

To Unsubscribe, send an email to:[EMAIL PROTECTED]
(Put the word unsubscribe in the subject field)

Reply via email to