Actually doesn't the building code define Horz. building separations as a 3
hour horizontal barrier?
Which I believe can only be achieved with concrete with fireproofing
applied?

Thom McMahon, SET
Firetech, Inc.
2560 Copper Ridge Dr
P.O. Box 882136
Steamboat Springs, CO 80488
Tel:  970-879-7952
Fax: 970-879-7926


-----Original Message-----
From: [email protected]
[mailto:[email protected]] On Behalf Of George Church
Sent: Thursday, October 01, 2009 10:20 AM
To: [email protected]
Subject: RE: Hotel/Motel and concealed combustible spaces

So to avoid the 3,000 SF application we need to include 4 hour horizontal
separations very 4-floors so we can still apply 13R where the onerous large
MRA isn't included?  Naturally I'm assuming the sprinklers under the
balconies will control vertical exterior fire spread.

glc

-----Original Message-----

_______________________________________________
Sprinklerforum mailing list
[email protected]
http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum

For Technical Assistance, send an email to: [email protected]

To Unsubscribe, send an email to:[email protected]
(Put the word unsubscribe in the subject field)

Reply via email to