that actual came up as a proposal and the TC killed it DEAD DEAD DEAD. Let's not loss sight that 25 is attempting to provide a reasonable level of assurance that the system is MECHANICALLY sound and is not looking for anything and everything that could possible be a little off. It's come a loooong way from avoiding the number cause for failures - a closed valve.
Roland On Dec 1, 2009, at 3:52 PM, Bill Brooks wrote: > Should we require a 5-year flow test as part > of an NFPA 25 inspection? > > Bill Brooks _______________________________________________ Sprinklerforum mailing list [email protected] http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum For Technical Assistance, send an email to: [email protected] To Unsubscribe, send an email to:[email protected] (Put the word unsubscribe in the subject field)
