that actual came up as a proposal and the TC killed it DEAD DEAD  
DEAD.  Let's not loss sight that 25 is attempting to provide a  
reasonable level of assurance that the system is MECHANICALLY sound  
and is not looking for anything and everything that could possible be  
a little off.  It's come a loooong way from avoiding the number cause  
for failures - a closed valve.

Roland

On Dec 1, 2009, at 3:52 PM, Bill Brooks wrote:

> Should we require a 5-year flow test as part
> of an NFPA 25 inspection?
>
> Bill Brooks

_______________________________________________
Sprinklerforum mailing list
[email protected]
http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum

For Technical Assistance, send an email to: [email protected]

To Unsubscribe, send an email to:[email protected]
(Put the word unsubscribe in the subject field)

Reply via email to