Jay,

Check the archives as this topic has been talked about fairly often and 
recently.  NFPA 13, 2007 ed. 10.10.2.5.
We always spec a backflow test outlet (male threads) sized to be able to flow 
system demand.  Contact me if you want more detail.

Reed A. Roisum, CET

Ulteig Engineers, Inc.
3350 38th Avenue S.
Fargo, ND 58104
701.280.8580 direct
701.212.8810 cell
www.ulteig.com

-----Original Message-----
From: [email protected] 
[mailto:[email protected]] On Behalf Of Jay White
Sent: Monday, October 04, 2010 8:14 AM
To: [email protected]
Subject: Backflow Forward Flow Test

Anyone familiar with NFPA 13 requirements to forward flow test the backflow
at system demand? Is this accomplished with a bypass arrangement?

Jay White
Estimator/Design Manager
Dynamic Fire Protection
1807 Hwy. 25 South
Starkville, MS 39759
Phone: 662-324-1550
Fax:       662-324-1545
Cell:      662-312-2426


_______________________________________________
Sprinklerforum mailing list
[email protected]
http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum

For Technical Assistance, send an email to: [email protected]

To Unsubscribe, send an email to:[email protected]
(Put the word unsubscribe in the subject field)
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum

For Technical Assistance, send an email to: [email protected]

To Unsubscribe, send an email to:[email protected]
(Put the word unsubscribe in the subject field)

Reply via email to