On Wed, 9 Dec 2015 10:24:54 +0100
Simon Poole <si...@poole.ch> wrote:

> road works (ok we don't have that)

Depends on region. Some mappers in Poland map construction works
lasting for longer period (switch to highway=construction during time
when road is inaccessible).

See for example http://www.openstreetmap.org/#map=19/50.06364/19.93235

_______________________________________________
talk mailing list
talk@openstreetmap.org
https://lists.openstreetmap.org/listinfo/talk

Reply via email to