OK, So what do you do when the builder decides to frame the attic at the end of the job with pull down stair access for storage purposes after the pipe is run and sized?
Exposed wood, sloped structure 6/12. If we have to use 13 with upright heads there is absolutely no way the calcs will work for these 6 heads. Thanks, Greg McGahan _______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
