On Sep 19, 2007, at 2:57 PM, <[EMAIL PROTECTED]>
<[EMAIL PROTECTED]> wrote:
Sorry but I just can't see any reason to put it at the end of some
bulk
main instead of right at the pump.
Water service entrance happens to be at the most architecturally
sensitive part off the building and there is no way you can send the
test flow down a drain. The most demanding hazard, one reason for the
pump and the other being a poor water supply (the pump is small),
happens to be at the opposite corner of the building. You already
have a relatively big pipe headed to that end of the building which
also is the ugly side of the building and where the FDC will be
installed on this single system. So you hang one pipe instead of two.
Every job is different in some way.
Allan Seidel
St. Louis, MO
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
To Unsubscribe, send an email to:[EMAIL PROTECTED]
(Put the word unsubscribe in the subject field)