Craig,
No battles, no hackles raised, no feelings hurt....My whole issue with this
thread was actually not direct but alongside of it. I've become really
irritated by sloppy (at best) A&E work and contractors rolling over for
expediency. A running joke that a colleague and I have is that sprinkler
contractors will be required to hire a soils engineer since the sprinklers
are supported from the roof/ceiling structure, the roof is supported by the
walls, the walls rely on the foundation and therefore the soils analysis is
the sprinkler design/build contractor's responsibility. Out here we're
seeing plan reviewers wanting load calculations on the structure to insure
it will withstand the forces imposed. All well, good, and proper but when
the GC tells the sprink guys that it's theirs the sprink guys are rolling
over just to avoid the argument (it's cheaper to just do it than fight it)
and setting a bad precedent. Although specifically asking what to do when
there was no designated location for the riser, I just saw the real question
to be, "Why hasn't the bloody A&E team done its job? Where's the riser go?
What's the design basis? What's the performance objective? What's the water
supply? Here are my EQ bracing calcs that prove the brace and the fastener
will withstand the loading--check that against your STRUCTURAL engineer's
calculations to insure your building can live with it. And, by the way, if
YOUR building is so under built that the required system is too heavy for it
then it's YOUR problem to build it stronger. And on and on and on...." Many
A&Es and GCs, for some reason, don't think that planning and coordination is
their job. I'm confused since I thought that was their only job. But I'm
sure George will point out how naive I'm being when it kind of/sort of
clearly states/implies in their creedo that transferring funds from the
owner's account to their own is their primary duty. Sorry for the rant. It's
my current hot button and I just happened to break into this thread with
this sidebar just after your comment, in spite of what you said rather than
because of it.

On 3/14/08, [EMAIL PROTECTED] <[EMAIL PROTECTED]> wrote:
>
> I enjoy a good battle, bring it on.
>
> Obviously no valve room would be required or needed when there is no
> issue with freezing.
>
>
>
> Craig L. Prahl, CET
> Fire Protection Group
> Mechanical Department
> CH2MHILL
> Lockwood Greene
> 1500 International Drive
> PO Box 491, Spartanburg, SC  29304-0491
> Direct - 864.599.4102
> Fax - 864.599.8439
> [EMAIL PROTECTED]
> http://www.ch2m.com
>
> -----Original Message-----
> From: [EMAIL PROTECTED]
>
> [mailto:[EMAIL PROTECTED] On Behalf Of George
> Church
> Sent: Thursday, March 13, 2008 8:39 PM
> To: [email protected]
> Subject: RE: Dry System Size
>
> In the case you present, Craig, you'd need a valve room with heat (in
> TX, also AC)
>
> But the code does not mandate a valve room, since one another job you
> could stick it on the other side of the wall in a heated area.
>
> Glc
> Ps- word to wise- don't pick code battles with JAD without a lot of
> research and ammo :)
>
> -----Original Message-----
> From: [EMAIL PROTECTED]
> [mailto:[EMAIL PROTECTED] On Behalf Of
> [EMAIL PROTECTED]
> Sent: Thursday, March 13, 2008 1:54 PM
> To: [email protected]
> Subject: RE: Dry System Size
>
> And in a wide open space where temps could fall below 40 degrees, how
> would you accomplish that without the valve room?
>
>
> Craig L. Prahl, CET
> Fire Protection Group
> Mechanical Department
> CH2MHILL
> Lockwood Greene
> 1500 International Drive
> PO Box 491, Spartanburg, SC  29304-0491
> Direct - 864.599.4102
> Fax - 864.599.8439
> [EMAIL PROTECTED]
> http://www.ch2m.com
>
> -----Original Message-----
> From: [EMAIL PROTECTED]
> [mailto:[EMAIL PROTECTED] On Behalf Of John
> Denhardt
> Sent: Thursday, March 13, 2008 1:43 PM
> To: [email protected]
> Subject: RE: Dry System Size
>
> You do not need a valve room.  The valve must be maintained above
> freezing is the only requirement as far as temperature is concerned.
>
> John
>
> John August Denhardt, P.E.
> Strickland Fire Protection Incorporated
> 5113 Berwyn Road
> College Park, Maryland 20740
> Office Telephone Number:  301-474-1136
> Mobile Telephone Number:  301-343-1457
> FIRE SPRINKLERS SAVE LIVES
>
>
>
> _______________________________________________
> Sprinklerforum mailing list
> [email protected]
> http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
>
> To Unsubscribe, send an email
> to:[EMAIL PROTECTED]
> (Put the word unsubscribe in the subject field)
> _______________________________________________
> Sprinklerforum mailing list
> [email protected]
> http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
>
> To Unsubscribe, send an email to:[EMAIL PROTECTED]
> (Put the word unsubscribe in the subject field)
>



-- 
Ron Greenman
at home....
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum

To Unsubscribe, send an email to:[EMAIL PROTECTED]
(Put the word unsubscribe in the subject field)

Reply via email to