Ron, can't agree with you more. I dealt with some of the same stuff while wearing the contractor's hat. Some of the things that were expected from the sprinkler contractor were downright absurd. But like I said, a lot of the problem is education. The typical spec writers and GC's just don't know where the roles and responsibilities begin and end.
Craig L. Prahl, CET Fire Protection Group Mechanical Department CH2MHILL Lockwood Greene 1500 International Drive PO Box 491, Spartanburg, SC 29304-0491 Direct - 864.599.4102 Fax - 864.599.8439 [EMAIL PROTECTED] http://www.ch2m.com -----Original Message----- From: [EMAIL PROTECTED] [mailto:[EMAIL PROTECTED] On Behalf Of Ron Greenman Sent: Friday, March 14, 2008 10:29 AM To: [email protected] Subject: Re: Dry System Size Craig, No battles, no hackles raised, no feelings hurt....My whole issue with this thread was actually not direct but alongside of it. I've become really irritated by sloppy (at best) A&E work and contractors rolling over for expediency. A running joke that a colleague and I have is that sprinkler contractors will be required to hire a soils engineer since the sprinklers are supported from the roof/ceiling structure, the roof is supported by the walls, the walls rely on the foundation and therefore the soils analysis is the sprinkler design/build contractor's responsibility. Out here we're seeing plan reviewers wanting load calculations on the structure to insure it will withstand the forces imposed. All well, good, and proper but when the GC tells the sprink guys that it's theirs the sprink guys are rolling over just to avoid the argument (it's cheaper to just do it than fight it) and setting a bad precedent. Although specifically asking what to do when there was no designated location for the riser, I just saw the real question to be, "Why hasn't the bloody A&E team done its job? Where's the riser go? What's the design basis? What's the performance objective? What's the water supply? Here are my EQ bracing calcs that prove the brace and the fastener will withstand the loading--check that against your STRUCTURAL engineer's calculations to insure your building can live with it. And, by the way, if YOUR building is so under built that the required system is too heavy for it then it's YOUR problem to build it stronger. And on and on and on...." Many A&Es and GCs, for some reason, don't think that planning and coordination is their job. I'm confused since I thought that was their only job. But I'm sure George will point out how naive I'm being when it kind of/sort of clearly states/implies in their creedo that transferring funds from the owner's account to their own is their primary duty. Sorry for the rant. It's my current hot button and I just happened to break into this thread with this sidebar just after your comment, in spite of what you said rather than because of it. On 3/14/08, [EMAIL PROTECTED] <[EMAIL PROTECTED]> wrote: > > I enjoy a good battle, bring it on. > > Obviously no valve room would be required or needed when there is no > issue with freezing. > > > > Craig L. Prahl, CET > Fire Protection Group > Mechanical Department > CH2MHILL > Lockwood Greene > 1500 International Drive > PO Box 491, Spartanburg, SC 29304-0491 Direct - 864.599.4102 Fax - > 864.599.8439 [EMAIL PROTECTED] http://www.ch2m.com > > -----Original Message----- > From: [EMAIL PROTECTED] > > [mailto:[EMAIL PROTECTED] On Behalf Of George > Church > Sent: Thursday, March 13, 2008 8:39 PM > To: [email protected] > Subject: RE: Dry System Size > > In the case you present, Craig, you'd need a valve room with heat (in > TX, also AC) > > But the code does not mandate a valve room, since one another job you > could stick it on the other side of the wall in a heated area. > > Glc > Ps- word to wise- don't pick code battles with JAD without a lot of > research and ammo :) > > -----Original Message----- > From: [EMAIL PROTECTED] > [mailto:[EMAIL PROTECTED] On Behalf Of > [EMAIL PROTECTED] > Sent: Thursday, March 13, 2008 1:54 PM > To: [email protected] > Subject: RE: Dry System Size > > And in a wide open space where temps could fall below 40 degrees, how > would you accomplish that without the valve room? > > > Craig L. Prahl, CET > Fire Protection Group > Mechanical Department > CH2MHILL > Lockwood Greene > 1500 International Drive > PO Box 491, Spartanburg, SC 29304-0491 Direct - 864.599.4102 Fax - > 864.599.8439 [EMAIL PROTECTED] http://www.ch2m.com > > -----Original Message----- > From: [EMAIL PROTECTED] > [mailto:[EMAIL PROTECTED] On Behalf Of John > Denhardt > Sent: Thursday, March 13, 2008 1:43 PM > To: [email protected] > Subject: RE: Dry System Size > > You do not need a valve room. The valve must be maintained above > freezing is the only requirement as far as temperature is concerned. > > John > > John August Denhardt, P.E. > Strickland Fire Protection Incorporated > 5113 Berwyn Road > College Park, Maryland 20740 > Office Telephone Number: 301-474-1136 Mobile Telephone Number: > 301-343-1457 FIRE SPRINKLERS SAVE LIVES > > > > _______________________________________________ > Sprinklerforum mailing list > [email protected] > http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum > > To Unsubscribe, send an email > to:[EMAIL PROTECTED] > (Put the word unsubscribe in the subject field) > _______________________________________________ > Sprinklerforum mailing list > [email protected] > http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum > > To Unsubscribe, send an email > to:[EMAIL PROTECTED] > (Put the word unsubscribe in the subject field) > -- Ron Greenman at home.... _______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum To Unsubscribe, send an email to:[EMAIL PROTECTED] (Put the word unsubscribe in the subject field) _______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum To Unsubscribe, send an email to:[EMAIL PROTECTED] (Put the word unsubscribe in the subject field)