Just tell the GC NO! Seriously, I just a compliment from an architect (in an email to the Owner, it was nice) on a hotel we just got, since we were fighting a code battle for the Owner, and ignored the prelim FP prepared by the Architect's own ME sub, basically telling the PE NO! we're not going to waste all that money, and no, you can't take credit in the mixed use calc for area increase if we do use 13R, BTW.
We can't get PEs to specify proper levels of protection, let alone a 2-hour wall at the pump room or howzabout 6" UG for a K25 ESFR job with barely enough city pressure to work? Maybe the 6" UG was left over from the original criteria, OH 2 to protect 28' high Class IV and Group A in racks. Tempting to just bid what was shown and whack em, but that's not how we do it. PIA to try to educate the PE, hopefully some day it'll be worth it. I was talking to another contractor yesterday that proves its not one sided, numnuts on the A&E side only. He didn't know you couldn't cure overpressurization on a pump by slapping a main relief valve on it. I pointed out the PLDs resulting from the '03 changes to NFPA #20, he was oblivious. 5 years later? Scarier- the contractor is an engineer, used to work for FM before going on to the Big G, then on his own. You'da thunk he'd follow this stuff! Ron, we've built a few windmills behind the shop, you're welcome to come try tilting at them for practice! Glc TGIF -----Original Message----- From: [EMAIL PROTECTED] [mailto:[EMAIL PROTECTED] On Behalf Of [EMAIL PROTECTED] Sent: Friday, March 14, 2008 12:17 PM To: [email protected] Subject: RE: Dry System Size Ron, can't agree with you more. I dealt with some of the same stuff while wearing the contractor's hat. Some of the things that were expected from the sprinkler contractor were downright absurd. But like I said, a lot of the problem is education. The typical spec writers and GC's just don't know where the roles and responsibilities begin and end. Craig L. Prahl, CET Fire Protection Group Mechanical Department CH2MHILL Lockwood Greene 1500 International Drive PO Box 491, Spartanburg, SC 29304-0491 Direct - 864.599.4102 Fax - 864.599.8439 [EMAIL PROTECTED] http://www.ch2m.com -----Original Message----- From: [EMAIL PROTECTED] [mailto:[EMAIL PROTECTED] On Behalf Of Ron Greenman Sent: Friday, March 14, 2008 10:29 AM To: [email protected] Subject: Re: Dry System Size Craig, No battles, no hackles raised, no feelings hurt....My whole issue with this thread was actually not direct but alongside of it. I've become really irritated by sloppy (at best) A&E work and contractors rolling over for expediency. A running joke that a colleague and I have is that sprinkler contractors will be required to hire a soils engineer since the sprinklers are supported from the roof/ceiling structure, the roof is supported by the walls, the walls rely on the foundation and therefore the soils analysis is the sprinkler design/build contractor's responsibility. Out here we're seeing plan reviewers wanting load calculations on the structure to insure it will withstand the forces imposed. All well, good, and proper but when the GC tells the sprink guys that it's theirs the sprink guys are rolling over just to avoid the argument (it's cheaper to just do it than fight it) and setting a bad precedent. Although specifically asking what to do when there was no designated location for the riser, I just saw the real question to be, "Why hasn't the bloody A&E team done its job? Where's the riser go? What's the design basis? What's the performance objective? What's the water supply? Here are my EQ bracing calcs that prove the brace and the fastener will withstand the loading--check that against your STRUCTURAL engineer's calculations to insure your building can live with it. And, by the way, if YOUR building is so under built that the required system is too heavy for it then it's YOUR problem to build it stronger. And on and on and on...." Many A&Es and GCs, for some reason, don't think that planning and coordination is their job. I'm confused since I thought that was their only job. But I'm sure George will point out how naive I'm being when it kind of/sort of clearly states/implies in their creedo that transferring funds from the owner's account to their own is their primary duty. Sorry for the rant. It's my current hot button and I just happened to break into this thread with this sidebar just after your comment, in spite of what you said rather than because of it. _______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum To Unsubscribe, send an email to:[EMAIL PROTECTED] (Put the word unsubscribe in the subject field)