Again, accept my thanks.to all of you. seriously.
i will take the black and the blue
cause i am learning on you.
I am not out to break the contractor's bank.
working with this national contracting company--
  at least this office of theirs-- has been  frustrating
  and time consuming.

the specs are not ideal.
the specs are for the GC, who hires the sprinkler contractor
  and then hires an engineer to review the sprinkler
  contractor's drawings (me).



I want the government to get a reasonable product, and
  receive a water supply description they can refer to in the future,
  because these buildings have a service life of 35-50
  years and will probably be
  renovated again, like they
  were before in '94.

So, I will let the earthquake bracing issue fall.
I don't want to be unreasonable, just that almost all
military jobs I worked on, seismic is required,
regardless if the job is in Oklahoma or in Northridge, CA.
it seemed like a natural thing to ask for.

Regarding waterflow, I would be happy with a JPEG of the
UG piping plan splashed on a sheet, or
even hand drawn layout.  Just document the underground
and water supply like NFPA 13 asks.  The renovation has
a changed wall layout, and new design area.  To get the UG
water supply and waterflow information documented, the
GC is forwarding to me the civil engineer's work, and I am going to put the
UG piping
and  waterflow on a new sheet with my letterhead and name.
This is the quickest way to get it done.

The government PE (I am not sure if it is the same one that
wrote the spec, but i got a suspicion) has stated to the GC
that they are concerned the contract FPE (me) has not been
doing his job.

that was after i went through 3 plan check cycles with this
contractor on another project, over the same things.  The
government PE apparently did not have a clue about
what was going on, or the sprinkler contractor gave him a
clue.  Earthquake bracing was provided on that project as
it was new construction.  same specs were used though.

I think the military contract FPE model is tweaked.
the contract FPE serves two masters.  but only
one pays me:  the GC.  only thing is, the other master
is the one that pays the GC.



scot deal
excelsior fire
_______________________________________________
Sprinklerforum mailing list
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
For Technical Assistance, send an email to: [email protected]

To Unsubscribe, send an email to:[email protected]
(Put the word unsubscribe in the subject field)

Reply via email to