Change order is going to be a tough sell, since NFPA 13, 2007 8-15.5
references ASME A17.1 so often, that it could be easy to say, you should
have known what it requires.

Thom McMahon, SET
Firetech, Inc.
2560 Copper Ridge Dr
P.O. Box 882136
Steamboat Springs, CO 80488
Tel:  970-879-7952
Fax: 970-879-7926



-----Original Message-----
From: [email protected]
[mailto:[email protected]] On Behalf Of Brian Harris
Sent: Monday, May 24, 2010 9:16 AM
To: [email protected]; [email protected]
Subject: RE: Elevator Equipment Rooms

Brad-
Unfortunately I don't have access to that Standard, would it be a big pain
in the @$$ to email me that one section? Another question I have is if the
plans were approved by the Architect, Engineer, and local AHJ with the line
passing through the room wouldn't that at least be grounds for a possible
change order?


Brian Harris
ld)

_______________________________________________
Sprinklerforum mailing list
[email protected]
http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum

For Technical Assistance, send an email to: [email protected]

To Unsubscribe, send an email to:[email protected]
(Put the word unsubscribe in the subject field)

Reply via email to