Thom- One could argue that 8.15.5.5. is only talking about heads at the top of hoistways.....
Brian Harris FDFP INC. -----Original Message----- From: [email protected] [mailto:[email protected]] On Behalf Of Thom McMahon Sent: Monday, May 24, 2010 12:03 PM To: [email protected]; [email protected] Subject: RE: Elevator Equipment Rooms Change order is going to be a tough sell, since NFPA 13, 2007 8-15.5 references ASME A17.1 so often, that it could be easy to say, you should have known what it requires. Thom McMahon, SET Firetech, Inc. 2560 Copper Ridge Dr P.O. Box 882136 Steamboat Springs, CO 80488 Tel: 970-879-7952 Fax: 970-879-7926 -----Original Message----- From: [email protected] [mailto:[email protected]] On Behalf Of Brian Harris Sent: Monday, May 24, 2010 9:16 AM To: [email protected]; [email protected] Subject: RE: Elevator Equipment Rooms Brad- Unfortunately I don't have access to that Standard, would it be a big pain in the @$$ to email me that one section? Another question I have is if the plans were approved by the Architect, Engineer, and local AHJ with the line passing through the room wouldn't that at least be grounds for a possible change order? Brian Harris ld) _______________________________________________ Sprinklerforum mailing list [email protected] http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum For Technical Assistance, send an email to: [email protected] To Unsubscribe, send an email to:[email protected] (Put the word unsubscribe in the subject field) _______________________________________________ Sprinklerforum mailing list [email protected] http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum For Technical Assistance, send an email to: [email protected] To Unsubscribe, send an email to:[email protected] (Put the word unsubscribe in the subject field)