We have an existing school we are sprinkling. When we pass through a block
wall, non-rated (smoke, fire etc.) we plan on providing clearance or a flex
coupling within a foot of the wall on both sides of the wall. Does it say
anywhere we have to use sleeves for block walls? We will be using Sch. 10 &
40 pipe as well as CPVC. I can't seem to find anything other than NFPA 13 -
2007 9.3.4.3 "Where clearance is provided by a pipe sleeve.." But nothing
requiring one.

 