It's in Appendix B of IFC and is definitely in the realm of A/E team. Fire 
flow, hydrant spacing etc.. Is required for building permits (usually) and the 
fire line size should have been determined well before a sprinkler contractor 
was involved.

Sent from my iPhone

> On Dec 22, 2015, at 1:46 PM, Brian Harris <[email protected]> wrote:
> 
> Can someone please put into laymen's terms the difference between doing a 
> fire flow demand calc for the underground and the hydraulic calc's for the 
> sprinkler system? We have been running into some projects lately where the 
> civil engineer tries to pawn sizing the underground off onto the sprinkler 
> contractor. I try telling them that's their responsibility not ours but I'd 
> like something more definitive to have on hand.
> 
> Brian Harris, CET
> BVS Systems Inc.
> Sprinkler Division
> bvssystemsinc.com<http://bvssystemsinc.com/>
> Phone: 704.896.9989
> Fax: 704.896.1935
> 
> _______________________________________________
> Sprinklerforum mailing list
> [email protected]
> http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org

Reply via email to