Thanks... That's kind of what I expected to see. I'm wondering now, would this be worth the price (of development, deployment) to have this info down to the piping level of a sprinkler system?
Most of bim that I've seen answers one question - did I hit anything? And a lot of drawings are being coordinated on that basis alone (here's where I wanna run, why can't I ?). Any other thinking along this line? At 11:32 AM 5/24/2010, you wrote: >For a sprinkler system in a real Bldg. Information Model you would >be able to click on a sprinkler pipe and be referred to additional >information which could include >the contractor installation drawings, system calculations, >equipment/component shop drawings, testing records, activation or >repair records, basically anything related to the installation or operation Vince Sabolik Christi Fire Protection, Inc. 11351 Pearl Road Strongsville, Ohio 44136 T 440 572-7730 F 440 572-7719 Email: <mailto:[email protected]>[email protected] _______________________________________________ Sprinklerforum mailing list [email protected] http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum For Technical Assistance, send an email to: [email protected] To Unsubscribe, send an email to:[email protected] (Put the word unsubscribe in the subject field)
