We have done it. Not an issue as long as you know the requirement upfront.

John

John August Denhardt, P.E.
Strickland Fire Protection

On Jun 1, 2017, at 8:59 AM, Brian Harris 
<[email protected]<mailto:[email protected]>> wrote:

Just got back some review comments for a project we’re doing and one in 
particular stuck out;
“Orient longitudinal pipe weld seam toward building roof; at least 45 degrees 
in relationship to the floor (for reference, the weld line points to the floor 
at 0 degrees) to mitigate pipe weld seam corrosion.”

Could you imagine the headache that would cause at the fab shop?

Brian Harris, CET
BVS Systems Inc.
Design Manager
bvssystemsinc.com<http://bvssystemsinc.com/>
Phone: 704.896.9989
Fax: 704.896.1935

_______________________________________________
Sprinklerforum mailing list
[email protected]<mailto:[email protected]>
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org

Reply via email to