We have done it. Not an issue as long as you know the requirement upfront. John
John August Denhardt, P.E. Strickland Fire Protection On Jun 1, 2017, at 8:59 AM, Brian Harris <[email protected]<mailto:[email protected]>> wrote: Just got back some review comments for a project we’re doing and one in particular stuck out; “Orient longitudinal pipe weld seam toward building roof; at least 45 degrees in relationship to the floor (for reference, the weld line points to the floor at 0 degrees) to mitigate pipe weld seam corrosion.” Could you imagine the headache that would cause at the fab shop? Brian Harris, CET BVS Systems Inc. Design Manager bvssystemsinc.com<http://bvssystemsinc.com/> Phone: 704.896.9989 Fax: 704.896.1935 _______________________________________________ Sprinklerforum mailing list [email protected]<mailto:[email protected]> http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org
_______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org