Luckily not an FM project.

Brian Harris, CET
BVS Systems Inc.
bvssytemsinc.com<http://bvssystemsinc.com/>

From: Sprinklerforum [mailto:[email protected]] On 
Behalf Of Travis Mack
Sent: Thursday, June 01, 2017 9:59 AM
To: [email protected]
Subject: Re: Review Comments

Yes. That comes straight from FM. If you have an FM job, you will be held to 
that requirement.
Travis Mack, SET
MFP Design, LLC
"Follow" us on Facebook: 
https://www.facebook.com/pages/MFP-Design-LLC/92218417692
Send large files to MFP Design via:
https://www.hightail.com/u/MFPDesign

Sent from my iPhone

On Jun 1, 2017, at 6:31 AM, Damien Shannon 
<[email protected]<mailto:[email protected]>> wrote:
That is a requirement in FM Datasheet 2-0. Is it an FM project? Was it 
specified in project specs? Can you use seamless pipe to bypass the issue?

Damien Shannon.

From: Sprinklerforum [mailto:[email protected]] On 
Behalf Of Brian Harris
Sent: 01 June 2017 06:59
To: 
[email protected]<mailto:[email protected]>
Subject: Review Comments

Just got back some review comments for a project we’re doing and one in 
particular stuck out;
“Orient longitudinal pipe weld seam toward building roof; at least 45 degrees 
in relationship to the floor (for reference, the weld line points to the floor 
at 0 degrees) to mitigate pipe weld seam corrosion.”

Could you imagine the headache that would cause at the fab shop?

Brian Harris, CET
BVS Systems Inc.
Design Manager
bvssystemsinc.com<http://bvssystemsinc.com/>
Phone: 704.896.9989
Fax: 704.896.1935

_______________________________________________
Sprinklerforum mailing list
[email protected]<mailto:[email protected]>
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org

Reply via email to