Yes. That comes straight from FM. If you have an FM job, you will be held to 
that requirement. 

Travis Mack, SET
MFP Design, LLC
"Follow" us on Facebook: 
https://www.facebook.com/pages/MFP-Design-LLC/92218417692
Send large files to MFP Design via:
https://www.hightail.com/u/MFPDesign

Sent from my iPhone

> On Jun 1, 2017, at 6:31 AM, Damien Shannon <[email protected]> wrote:
> 
> That is a requirement in FM Datasheet 2-0. Is it an FM project? Was it 
> specified in project specs? Can you use seamless pipe to bypass the issue?
>  
> Damien Shannon.
>  
> From: Sprinklerforum [mailto:[email protected]] 
> On Behalf Of Brian Harris
> Sent: 01 June 2017 06:59
> To: [email protected]
> Subject: Review Comments
>  
> Just got back some review comments for a project we’re doing and one in 
> particular stuck out;
> “Orient longitudinal pipe weld seam toward building roof; at least 45 degrees 
> in relationship to the floor (for reference, the weld line points to the 
> floor at 0 degrees) to mitigate pipe weld seam corrosion.”
>  
> Could you imagine the headache that would cause at the fab shop?
>  
> Brian Harris, CET
> BVS Systems Inc.
> Design Manager
> bvssystemsinc.com
> Phone: 704.896.9989
> Fax: 704.896.1935
>  
> _______________________________________________
> Sprinklerforum mailing list
> [email protected]
> http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org

Reply via email to