On Wed, Aug 26, 2009 at 3:32 PM, John Smith<delta_foxt...@yahoo.com> wrote: > > Actually there is still a junction from when it goes from 2 lanes to 1 lane, > and the (usually in .au) give way sign is before the junction of the 2 lanes > into one.
Only if the lanes are marked as separate ways, which they normally wouldn't be for a narrow road. > Neither of these cases need fudging, in the case of railway=level_crossing > it's already in wide spread usage, as for 2 lanes to one this can still be > done via proximity searches. Look, if you insist that a "proximity search" is a better way to relate a way to a node, as opposed to a relation, I respectfully disagree. I've got nothing more to say :) _______________________________________________ talk mailing list talk@openstreetmap.org http://lists.openstreetmap.org/listinfo/talk