Re: [SH-Discuss] 3/1 Opening Day Newsletter

2014-02-06 Thread Andrew Buczko
Very well said G!


On Wed, Feb 5, 2014 at 11:57 PM, gs volt gsvo...@gmail.com wrote:

 Downtown Akron Partnership had a deadline of tonight for a newsletter on
 synhak, so this is what I sent them:

 SYN/HAK OPENS ITS DOORS TO THE PUBLIC

 SYN/HAK The Akron Hackerspace 48 S. Summit St., Akron, OH 44308

 February 5, 2014

 The press and public are invited to the 2014 Spring Open House of SYN/HAK, 
 The Akron Hackerspace on March 1, 2013. Previously located on the far edge of 
 Akron downtown, join us around noon at our new downtown location: 48 S. 
 Summit St., Akron, Ohio to learn more about our space.

 SYN/HAK provides an environment for people to educate, create and share 
 amongst themselves and others within the domains of technology, art and 
 science. Through talks, classes, workshops, collaborative projects and other 
 activities, SYN/HAK encourages research, knowledge exchange, learning, and 
 mentoring in a safe, clean environment.

 Hackerspaces are community-operated places where people can meet and work on 
 their projects. SYN/HAK is a registered 501(c)3 not-for-profit corporation in 
 the State of Ohio. Donations are always appreciated, and will be tax-exempt.

 For more information on SYN/HAK, please visit our website at 
 http://www.synhak.org, or e-mail us at he...@synhak.org


 If you are moderator of other newsletters, please feel free to share this
 with your group(s) as well.

 Feel free to make edits to it, as you see fit.

 Regards,

 --
 G


 ___
 Discuss mailing list
 Discuss@synhak.org
 https://synhak.org/mailman/listinfo/discuss

___
Discuss mailing list
Discuss@synhak.org
https://synhak.org/mailman/listinfo/discuss

Re: [SH-Discuss] Something for summer.

2014-02-06 Thread Andrew Buczko
I'd be up for that



On Thu, Feb 6, 2014 at 12:49 AM, J. F. Corner j...@5n4k3.com wrote:

  Train track? locomotives?
 A FELLOW FOAMER???!

 *HOLY DIESEL ELECTRIC, TELL ME MORE!*


 On 2/5/2014 18:59, Martin Pinkston wrote:

   After I got home from the meeting last night, I got to thinking about a
 couple of things. The one being that once winter ends and decent weather
 start, I will be spending more time out at the train track. Because we hold
 public runs every other Sunday. A public run is where we give the public
 free rides on the trains. Some days we have 700 to 800 people come ride
 with us. It is open to any one who shows up and you all are welcome to come
 and see us.
  So, along those lines, I keep thinking about some of the cool things that
 could be done with a RPi or Arduino or BB in conjunction with this hobby.
 For instance, just a simple set up to graphically represent a locomotives
 location on the track on a laptop and then post that info on a webpage.
 From there, the imagination could run wild, like controlling signal blocks
 and switches, and the nice thing is that once the bugs were worked out, an
 actual product could be packaged and easily marketed on the web or our
 hobby publications.
  Again, this is just a thought.
  I don't believe there is a huge demand for any such products, but when
 has that ever stopped pharmaceutical companies. They are always coming out
 with a pill and then generating the demand for it by marketing. Latest
 example, testostrone replacement theropies.
  Besides, I think it would be a great learning experience in programming
 and might make a decent project for teaching programming.

  Again, just a thought.

 Take Care and Have Fun Always.

 Martin


 ___
 Discuss mailing 
 listDiscuss@synhak.orghttps://synhak.org/mailman/listinfo/discuss



 ___
 Discuss mailing list
 Discuss@synhak.org
 https://synhak.org/mailman/listinfo/discuss

___
Discuss mailing list
Discuss@synhak.org
https://synhak.org/mailman/listinfo/discuss

Re: [SH-Discuss] another zoning proposal

2014-02-06 Thread Andrew Buczko
looks good



On Thu, Feb 6, 2014 at 1:41 AM, Craig Bergdorf mm1...@gmail.com wrote:

 What if the EE lab and general meeting area were connected again in an
 L? Having the meeting area being the entire width we could fit the 21
 people we had at this weeks meeting.   Also with a shrunken machine shop
 from the first post to the floor drain, a clear shot to load/unload from
 the garage door including the basement  4x8 sheets to the machine room.
 The right side of the back 40 is left out, a good classroom and something
 else could spaciously fit in there.  I'm just trying to get 21 unpacked.  2
 weeks, 2 days till the soft launch.

 http://calculais.com/syn/2/5.1.pdf



 ___
 Discuss mailing list
 Discuss@synhak.org
 https://synhak.org/mailman/listinfo/discuss

___
Discuss mailing list
Discuss@synhak.org
https://synhak.org/mailman/listinfo/discuss

Re: [SH-Discuss] another zoning proposal

2014-02-06 Thread Torrie Fischer
On Thursday, February 06, 2014 01:41:59 Craig Bergdorf wrote:
 What if the EE lab and general meeting area were connected again in an
 L? Having the meeting area being the entire width we could fit the 21
 people we had at this weeks meeting.   Also with a shrunken machine shop
 from the first post to the floor drain, a clear shot to load/unload from
 the garage door including the basement  4x8 sheets to the machine room.
 The right side of the back 40 is left out, a good classroom and something
 else could spaciously fit in there.  I'm just trying to get 21 unpacked.  2
 weeks, 2 days till the soft launch.
 
 http://calculais.com/syn/2/5.1.pdf

Replying to indicate that I have given up on caring about floorplans since any 
such discussion inevitably ends up pissing me off when I get told how wrong my 
ideas are without any real logical argument.
___
Discuss mailing list
Discuss@synhak.org
https://synhak.org/mailman/listinfo/discuss


[SH-Discuss] Kitchen Supplies

2014-02-06 Thread Torrie Fischer
Hi, all.

Its a new month, and we haven't spent the last $23 of January's maintenence 
budget.

What are some supplies we need to stock up on?

I'm planning on picking up:

* Foam cups
* Kitchen utensils
* Rags/Towels
* Dish soap
___
Discuss mailing list
Discuss@synhak.org
https://synhak.org/mailman/listinfo/discuss


Re: [SH-Discuss] Kitchen Supplies

2014-02-06 Thread Justin Herman
Can we get mugs, rather than foam cups?

Or paper cups if we want disposable.


On Thu, Feb 6, 2014 at 11:37 AM, Michael Griesacker
mgriesac...@gmail.comwrote:

 How about a dustpan?
 On Feb 6, 2014 11:19 AM, Torrie Fischer tdfisc...@hackerbots.net
 wrote:

 Hi, all.

 Its a new month, and we haven't spent the last $23 of January's
 maintenence
 budget.

 What are some supplies we need to stock up on?

 I'm planning on picking up:

 * Foam cups
 * Kitchen utensils
 * Rags/Towels
 * Dish soap
 ___
 Discuss mailing list
 Discuss@synhak.org
 https://synhak.org/mailman/listinfo/discuss


 ___
 Discuss mailing list
 Discuss@synhak.org
 https://synhak.org/mailman/listinfo/discuss

___
Discuss mailing list
Discuss@synhak.org
https://synhak.org/mailman/listinfo/discuss

Re: [SH-Discuss] Kitchen Supplies

2014-02-06 Thread Chris Egeland
A couple ice-cube trays would be nice.

(to be operated in failover mode, not load-balancing mode, ie:
http://imgur.com/tH88mei)

On 2/6/2014 11:19 AM, Torrie Fischer wrote:
 Hi, all.

 Its a new month, and we haven't spent the last $23 of January's maintenence 
 budget.

 What are some supplies we need to stock up on?

 I'm planning on picking up:

 * Foam cups
 * Kitchen utensils
 * Rags/Towels
 * Dish soap
 ___
 Discuss mailing list
 Discuss@synhak.org
 https://synhak.org/mailman/listinfo/discuss

___
Discuss mailing list
Discuss@synhak.org
https://synhak.org/mailman/listinfo/discuss


Re: [SH-Discuss] Kitchen Supplies

2014-02-06 Thread Torrie Fischer
On Thursday, February 06, 2014 11:52:04 Justin Herman wrote:
 Can we get mugs, rather than foam cups?

Thats pricey.

 
 Or paper cups if we want disposable.

Right, yeah. Paper then.

 
 
 On Thu, Feb 6, 2014 at 11:37 AM, Michael Griesacker
 
 mgriesac...@gmail.comwrote:
  How about a dustpan?
  On Feb 6, 2014 11:19 AM, Torrie Fischer tdfisc...@hackerbots.net
  
  wrote:
  Hi, all.
  
  Its a new month, and we haven't spent the last $23 of January's
  maintenence
  budget.
  
  What are some supplies we need to stock up on?
  
  I'm planning on picking up:
  
  * Foam cups
  * Kitchen utensils
  * Rags/Towels
  * Dish soap
  ___
  Discuss mailing list
  Discuss@synhak.org
  https://synhak.org/mailman/listinfo/discuss
  
  ___
  Discuss mailing list
  Discuss@synhak.org
  https://synhak.org/mailman/listinfo/discuss
___
Discuss mailing list
Discuss@synhak.org
https://synhak.org/mailman/listinfo/discuss


Re: [SH-Discuss] Kitchen Supplies

2014-02-06 Thread Craig Bergdorf
or how about a trip to goodwill for a few more reusable cups, and maybe a
frypan or cookie sheet for the new stove.


On Thu, Feb 6, 2014 at 11:52 AM, Justin Herman just...@gmail.com wrote:

 Can we get mugs, rather than foam cups?

 Or paper cups if we want disposable.


 On Thu, Feb 6, 2014 at 11:37 AM, Michael Griesacker mgriesac...@gmail.com
  wrote:

 How about a dustpan?
 On Feb 6, 2014 11:19 AM, Torrie Fischer tdfisc...@hackerbots.net
 wrote:

 Hi, all.

 Its a new month, and we haven't spent the last $23 of January's
 maintenence
 budget.

 What are some supplies we need to stock up on?

 I'm planning on picking up:

 * Foam cups
 * Kitchen utensils
 * Rags/Towels
 * Dish soap
 ___
 Discuss mailing list
 Discuss@synhak.org
 https://synhak.org/mailman/listinfo/discuss


 ___
 Discuss mailing list
 Discuss@synhak.org
 https://synhak.org/mailman/listinfo/discuss



 ___
 Discuss mailing list
 Discuss@synhak.org
 https://synhak.org/mailman/listinfo/discuss

___
Discuss mailing list
Discuss@synhak.org
https://synhak.org/mailman/listinfo/discuss

Re: [SH-Discuss] Kitchen Supplies

2014-02-06 Thread Justin Herman
Goodwill is where I was thinking. paper is ok though.


On Thu, Feb 6, 2014 at 12:08 PM, Craig Bergdorf mm1...@gmail.com wrote:

 or how about a trip to goodwill for a few more reusable cups, and maybe a
 frypan or cookie sheet for the new stove.


 On Thu, Feb 6, 2014 at 11:52 AM, Justin Herman just...@gmail.com wrote:

 Can we get mugs, rather than foam cups?

 Or paper cups if we want disposable.


 On Thu, Feb 6, 2014 at 11:37 AM, Michael Griesacker 
 mgriesac...@gmail.com wrote:

 How about a dustpan?
 On Feb 6, 2014 11:19 AM, Torrie Fischer tdfisc...@hackerbots.net
 wrote:

 Hi, all.

 Its a new month, and we haven't spent the last $23 of January's
 maintenence
 budget.

 What are some supplies we need to stock up on?

 I'm planning on picking up:

 * Foam cups
 * Kitchen utensils
 * Rags/Towels
 * Dish soap
 ___
 Discuss mailing list
 Discuss@synhak.org
 https://synhak.org/mailman/listinfo/discuss


 ___
 Discuss mailing list
 Discuss@synhak.org
 https://synhak.org/mailman/listinfo/discuss



 ___
 Discuss mailing list
 Discuss@synhak.org
 https://synhak.org/mailman/listinfo/discuss



 ___
 Discuss mailing list
 Discuss@synhak.org
 https://synhak.org/mailman/listinfo/discuss

___
Discuss mailing list
Discuss@synhak.org
https://synhak.org/mailman/listinfo/discuss

Re: [SH-Discuss] Kitchen Oven and Stove

2014-02-06 Thread Justin Herman
Do we want a dishwasher?


On Wed, Feb 5, 2014 at 11:22 PM, Tiki Mclemore spiralsparrowcr...@gmail.com
 wrote:

 I am so happy! I can't wait for the kitchen to come together!!!

 ___
 Discuss mailing list
 Discuss@synhak.org
 https://synhak.org/mailman/listinfo/discuss

___
Discuss mailing list
Discuss@synhak.org
https://synhak.org/mailman/listinfo/discuss

Re: [SH-Discuss] another zoning proposal

2014-02-06 Thread Philip P. Patnode
Torrie is doing what she needs to do in the face of the continuing
bickering, deal making, personal agendas, ego-driven land grabs, and the
subtle obstructionism shown by some members over the floorplan.

In the face of complete chaos and a looming deadline, form a committee.

Yes, I am serious.

Following the philosophy of action as a do'ocracy, some motivated members
should assemble to discuss the floorplan and make a final decision.

Five people, with sharp pencils and blank paper, can sketch out a
compromise floorplan in under an hour.  Add another half hour for coffee
and revisions.

After a decision has been made, print out a few copies to work from and
start moving stuff into the designated areas.

The members will take it from there, knowing that a final floorplan exists.

If this doesn't sound like a workable solution, then just keep on bickering
and squabbling about where to put things or who gets his way about this or
that.

Of course, the opening day celebration might have to be moved to August 1st
if you keep up the noise level and refuse to cooperate with each other.

Reminds me of 4th grade recess out on the parking lot...






On Thu, Feb 6, 2014 at 9:47 AM, Torrie Fischer tdfisc...@hackerbots.netwrote:

 On Thursday, February 06, 2014 01:41:59 Craig Bergdorf wrote:
  What if the EE lab and general meeting area were connected again in an
  L? Having the meeting area being the entire width we could fit the 21
  people we had at this weeks meeting.   Also with a shrunken machine shop
  from the first post to the floor drain, a clear shot to load/unload from
  the garage door including the basement  4x8 sheets to the machine room.
  The right side of the back 40 is left out, a good classroom and something
  else could spaciously fit in there.  I'm just trying to get 21 unpacked.
  2
  weeks, 2 days till the soft launch.
 
  http://calculais.com/syn/2/5.1.pdf

 Replying to indicate that I have given up on caring about floorplans since
 any
 such discussion inevitably ends up pissing me off when I get told how
 wrong my
 ideas are without any real logical argument.
 ___
 Discuss mailing list
 Discuss@synhak.org
 https://synhak.org/mailman/listinfo/discuss

___
Discuss mailing list
Discuss@synhak.org
https://synhak.org/mailman/listinfo/discuss

Re: [SH-Discuss] Kitchen Oven and Stove

2014-02-06 Thread Philip P. Patnode
JH

Was that notice of a job opening?

How much does it pay and what are the hours?

Will start working on my CV while I wait for your reply.

In this economy, any job is a good job.

PPP


--- if you are referring to the appliance, then never mind


On Thu, Feb 6, 2014 at 12:25 PM, Justin Herman just...@gmail.com wrote:

 Do we want a dishwasher?


 On Wed, Feb 5, 2014 at 11:22 PM, Tiki Mclemore 
 spiralsparrowcr...@gmail.com wrote:

 I am so happy! I can't wait for the kitchen to come together!!!

 ___
 Discuss mailing list
 Discuss@synhak.org
 https://synhak.org/mailman/listinfo/discuss



 ___
 Discuss mailing list
 Discuss@synhak.org
 https://synhak.org/mailman/listinfo/discuss

___
Discuss mailing list
Discuss@synhak.org
https://synhak.org/mailman/listinfo/discuss

Re: [SH-Discuss] Kitchen Supplies

2014-02-06 Thread Omar Rassi
There's Salvation Army Family Store next to Aldi's on Brittain Road. If
Goodwill doesn't have something we're looking for, its another place to
check. There's also a nice bigger one in Fairlawn.


On Thu, Feb 6, 2014 at 12:24 PM, Justin Herman just...@gmail.com wrote:

 Goodwill is where I was thinking. paper is ok though.


 On Thu, Feb 6, 2014 at 12:08 PM, Craig Bergdorf mm1...@gmail.com wrote:

 or how about a trip to goodwill for a few more reusable cups, and maybe a
 frypan or cookie sheet for the new stove.


 On Thu, Feb 6, 2014 at 11:52 AM, Justin Herman just...@gmail.com wrote:

 Can we get mugs, rather than foam cups?

 Or paper cups if we want disposable.


 On Thu, Feb 6, 2014 at 11:37 AM, Michael Griesacker 
 mgriesac...@gmail.com wrote:

 How about a dustpan?
 On Feb 6, 2014 11:19 AM, Torrie Fischer tdfisc...@hackerbots.net
 wrote:

 Hi, all.

 Its a new month, and we haven't spent the last $23 of January's
 maintenence
 budget.

 What are some supplies we need to stock up on?

 I'm planning on picking up:

 * Foam cups
 * Kitchen utensils
 * Rags/Towels
 * Dish soap
 ___
 Discuss mailing list
 Discuss@synhak.org
 https://synhak.org/mailman/listinfo/discuss


 ___
 Discuss mailing list
 Discuss@synhak.org
 https://synhak.org/mailman/listinfo/discuss



 ___
 Discuss mailing list
 Discuss@synhak.org
 https://synhak.org/mailman/listinfo/discuss



 ___
 Discuss mailing list
 Discuss@synhak.org
 https://synhak.org/mailman/listinfo/discuss



 ___
 Discuss mailing list
 Discuss@synhak.org
 https://synhak.org/mailman/listinfo/discuss

___
Discuss mailing list
Discuss@synhak.org
https://synhak.org/mailman/listinfo/discuss

Re: [SH-Discuss] Kitchen Oven and Stove

2014-02-06 Thread Tiki Mclemore
Dishwasher might be overkill. Anyone cooking in the kitchen should clean up
after themselves and any plates or whatever used should be cleaned by the
person using them. I don't think there should ever be enough dirty dishes
for a dishwasher to be needed.
___
Discuss mailing list
Discuss@synhak.org
https://synhak.org/mailman/listinfo/discuss

Re: [SH-Discuss] Kitchen Supplies

2014-02-06 Thread Tiki Mclemore
Goodwill is amazing!! You can get a full set of everything for a kitchen
for way under $20!
___
Discuss mailing list
Discuss@synhak.org
https://synhak.org/mailman/listinfo/discuss

Re: [SH-Discuss] another zoning proposal

2014-02-06 Thread Torrie Fischer
On Thursday, February 06, 2014 12:31:45 Philip P. Patnode wrote:
 Torrie is doing what she needs to do in the face of the continuing
 bickering, deal making, personal agendas, ego-driven land grabs, and the
 subtle obstructionism shown by some members over the floorplan.
 
 In the face of complete chaos and a looming deadline, form a committee.
 
 Yes, I am serious.
 
 Following the philosophy of action as a do'ocracy, some motivated members
 should assemble to discuss the floorplan and make a final decision.
 
 Five people, with sharp pencils and blank paper, can sketch out a
 compromise floorplan in under an hour.  Add another half hour for coffee
 and revisions.

This is an excellent idea. I think this could also be a wonderful experiment 
in an improved governance process for the space. Consensus is starting to fall 
apart.

There was recently a large thread on noisebridge-discuss along the very same 
lines. I will look at their discussion and see what happened.

I'm wholly in favor of such a committee producing a floorplan with this 
limited set of rules:

* The floorplan is binding on The Community until March 2nd at 00:00
* No significant modifications may be done to the floorplan after the 
floorplan is approved without majority approval from the committee members
* Any committee member may declare a modification to be significant such that 
it is required to be approved by the committee
* The floorplan shall not include anything that cannot be uninstalled, moved, 
disassembled, or otherwise modified over a two day weekend after March 3rd 
without unaminous approval from the committee members
* The committee is dissolved on March 2nd at 00:00
* Additions to the committee shall not change without majority approval from 
the committee members or a Membership proposal
* Committee discussion and voting is held on the build@ list
* The SYNHAK Secretary is responsible for maintaining the committee membership 
roster
* The roster and any other commitee records are made public to The Membership
* Only Active Members in Good Standing are permitted to be a committee member
* Committee members may resign at any time, only in writing to the committee

 
 After a decision has been made, print out a few copies to work from and
 start moving stuff into the designated areas.
 
 The members will take it from there, knowing that a final floorplan exists.
 
 If this doesn't sound like a workable solution, then just keep on bickering
 and squabbling about where to put things or who gets his way about this or
 that.
 
 Of course, the opening day celebration might have to be moved to August 1st
 if you keep up the noise level and refuse to cooperate with each other.
 
 Reminds me of 4th grade recess out on the parking lot...
 
 On Thu, Feb 6, 2014 at 9:47 AM, Torrie Fischer 
tdfisc...@hackerbots.netwrote:
  On Thursday, February 06, 2014 01:41:59 Craig Bergdorf wrote:
   What if the EE lab and general meeting area were connected again in an
   L? Having the meeting area being the entire width we could fit the 21
   people we had at this weeks meeting.   Also with a shrunken machine shop
   from the first post to the floor drain, a clear shot to load/unload from
   the garage door including the basement  4x8 sheets to the machine room.
   The right side of the back 40 is left out, a good classroom and
   something
   else could spaciously fit in there.  I'm just trying to get 21 unpacked.
   
   2
   
   weeks, 2 days till the soft launch.
   
   http://calculais.com/syn/2/5.1.pdf
  
  Replying to indicate that I have given up on caring about floorplans since
  any
  such discussion inevitably ends up pissing me off when I get told how
  wrong my
  ideas are without any real logical argument.
  ___
  Discuss mailing list
  Discuss@synhak.org
  https://synhak.org/mailman/listinfo/discuss
___
Discuss mailing list
Discuss@synhak.org
https://synhak.org/mailman/listinfo/discuss


Re: [SH-Discuss] Kitchen Oven and Stove

2014-02-06 Thread Torrie Fischer
On Thursday, February 06, 2014 12:25:27 Justin Herman wrote:
 Do we want a dishwasher?

Sure, once everyone is trained to clean up their soda cans and bags of fast 
food :)

 
 
 On Wed, Feb 5, 2014 at 11:22 PM, Tiki Mclemore spiralsparrowcr...@gmail.com
  wrote:
  
  I am so happy! I can't wait for the kitchen to come together!!!
  
  ___
  Discuss mailing list
  Discuss@synhak.org
  https://synhak.org/mailman/listinfo/discuss
___
Discuss mailing list
Discuss@synhak.org
https://synhak.org/mailman/listinfo/discuss


Re: [SH-Discuss] Kitchen Oven and Stove

2014-02-06 Thread Justin Herman
It wasn't a suggestion just an offer. When I was picking up the stove the
dishwasher was offered too.


On Thu, Feb 6, 2014 at 1:26 PM, Torrie Fischer tdfisc...@hackerbots.netwrote:

 On Thursday, February 06, 2014 12:25:27 Justin Herman wrote:
  Do we want a dishwasher?

 Sure, once everyone is trained to clean up their soda cans and bags of fast
 food :)

 
 
  On Wed, Feb 5, 2014 at 11:22 PM, Tiki Mclemore 
 spiralsparrowcr...@gmail.com
   wrote:
  
   I am so happy! I can't wait for the kitchen to come together!!!
  
   ___
   Discuss mailing list
   Discuss@synhak.org
   https://synhak.org/mailman/listinfo/discuss
 ___
 Discuss mailing list
 Discuss@synhak.org
 https://synhak.org/mailman/listinfo/discuss

___
Discuss mailing list
Discuss@synhak.org
https://synhak.org/mailman/listinfo/discuss

Re: [SH-Discuss] another zoning proposal

2014-02-06 Thread Becca Salchak
Id like to volunteer myself for the committee
On Feb 6, 2014 1:24 PM, Torrie Fischer tdfisc...@hackerbots.net wrote:

 On Thursday, February 06, 2014 12:31:45 Philip P. Patnode wrote:
  Torrie is doing what she needs to do in the face of the continuing
  bickering, deal making, personal agendas, ego-driven land grabs, and the
  subtle obstructionism shown by some members over the floorplan.
 
  In the face of complete chaos and a looming deadline, form a committee.
 
  Yes, I am serious.
 
  Following the philosophy of action as a do'ocracy, some motivated
 members
  should assemble to discuss the floorplan and make a final decision.
 
  Five people, with sharp pencils and blank paper, can sketch out a
  compromise floorplan in under an hour.  Add another half hour for coffee
  and revisions.

 This is an excellent idea. I think this could also be a wonderful
 experiment
 in an improved governance process for the space. Consensus is starting to
 fall
 apart.

 There was recently a large thread on noisebridge-discuss along the very
 same
 lines. I will look at their discussion and see what happened.

 I'm wholly in favor of such a committee producing a floorplan with this
 limited set of rules:

 * The floorplan is binding on The Community until March 2nd at 00:00
 * No significant modifications may be done to the floorplan after the
 floorplan is approved without majority approval from the committee members
 * Any committee member may declare a modification to be significant such
 that
 it is required to be approved by the committee
 * The floorplan shall not include anything that cannot be uninstalled,
 moved,
 disassembled, or otherwise modified over a two day weekend after March 3rd
 without unaminous approval from the committee members
 * The committee is dissolved on March 2nd at 00:00
 * Additions to the committee shall not change without majority approval
 from
 the committee members or a Membership proposal
 * Committee discussion and voting is held on the build@ list
 * The SYNHAK Secretary is responsible for maintaining the committee
 membership
 roster
 * The roster and any other commitee records are made public to The
 Membership
 * Only Active Members in Good Standing are permitted to be a committee
 member
 * Committee members may resign at any time, only in writing to the
 committee

 
  After a decision has been made, print out a few copies to work from and
  start moving stuff into the designated areas.
 
  The members will take it from there, knowing that a final floorplan
 exists.
 
  If this doesn't sound like a workable solution, then just keep on
 bickering
  and squabbling about where to put things or who gets his way about this
 or
  that.
 
  Of course, the opening day celebration might have to be moved to August
 1st
  if you keep up the noise level and refuse to cooperate with each other.
 
  Reminds me of 4th grade recess out on the parking lot...
 
  On Thu, Feb 6, 2014 at 9:47 AM, Torrie Fischer
 tdfisc...@hackerbots.netwrote:
   On Thursday, February 06, 2014 01:41:59 Craig Bergdorf wrote:
What if the EE lab and general meeting area were connected again in
 an
L? Having the meeting area being the entire width we could fit the 21
people we had at this weeks meeting.   Also with a shrunken machine
 shop
from the first post to the floor drain, a clear shot to load/unload
 from
the garage door including the basement  4x8 sheets to the machine
 room.
The right side of the back 40 is left out, a good classroom and
something
else could spaciously fit in there.  I'm just trying to get 21
 unpacked.
  
2
  
weeks, 2 days till the soft launch.
   
http://calculais.com/syn/2/5.1.pdf
  
   Replying to indicate that I have given up on caring about floorplans
 since
   any
   such discussion inevitably ends up pissing me off when I get told how
   wrong my
   ideas are without any real logical argument.
   ___
   Discuss mailing list
   Discuss@synhak.org
   https://synhak.org/mailman/listinfo/discuss
 ___
 Discuss mailing list
 Discuss@synhak.org
 https://synhak.org/mailman/listinfo/discuss

___
Discuss mailing list
Discuss@synhak.org
https://synhak.org/mailman/listinfo/discuss

Re: [SH-Discuss] Kitchen Oven and Stove

2014-02-06 Thread Omar Rassi
Personally I'd like a dishwasher! Is it a standalone or one of those units
that goes under a counter/sink???


On Thu, Feb 6, 2014 at 2:03 PM, Justin Herman just...@gmail.com wrote:

 It wasn't a suggestion just an offer. When I was picking up the stove the
 dishwasher was offered too.


 On Thu, Feb 6, 2014 at 1:26 PM, Torrie Fischer 
 tdfisc...@hackerbots.netwrote:

 On Thursday, February 06, 2014 12:25:27 Justin Herman wrote:
  Do we want a dishwasher?

 Sure, once everyone is trained to clean up their soda cans and bags of
 fast
 food :)

 
 
  On Wed, Feb 5, 2014 at 11:22 PM, Tiki Mclemore 
 spiralsparrowcr...@gmail.com
   wrote:
  
   I am so happy! I can't wait for the kitchen to come together!!!
  
   ___
   Discuss mailing list
   Discuss@synhak.org
   https://synhak.org/mailman/listinfo/discuss
 ___
 Discuss mailing list
 Discuss@synhak.org
 https://synhak.org/mailman/listinfo/discuss



 ___
 Discuss mailing list
 Discuss@synhak.org
 https://synhak.org/mailman/listinfo/discuss

___
Discuss mailing list
Discuss@synhak.org
https://synhak.org/mailman/listinfo/discuss

Re: [SH-Discuss] another zoning proposal

2014-02-06 Thread Justin Herman
I would also like to be on this committee.


On Thu, Feb 6, 2014 at 2:07 PM, Becca Salchak blsalc...@yahoo.com wrote:

 Id like to volunteer myself for the committee
 On Feb 6, 2014 1:24 PM, Torrie Fischer tdfisc...@hackerbots.net wrote:

 On Thursday, February 06, 2014 12:31:45 Philip P. Patnode wrote:
  Torrie is doing what she needs to do in the face of the continuing
  bickering, deal making, personal agendas, ego-driven land grabs, and the
  subtle obstructionism shown by some members over the floorplan.
 
  In the face of complete chaos and a looming deadline, form a committee.
 
  Yes, I am serious.
 
  Following the philosophy of action as a do'ocracy, some motivated
 members
  should assemble to discuss the floorplan and make a final decision.
 
  Five people, with sharp pencils and blank paper, can sketch out a
  compromise floorplan in under an hour.  Add another half hour for coffee
  and revisions.

 This is an excellent idea. I think this could also be a wonderful
 experiment
 in an improved governance process for the space. Consensus is starting to
 fall
 apart.

 There was recently a large thread on noisebridge-discuss along the very
 same
 lines. I will look at their discussion and see what happened.

 I'm wholly in favor of such a committee producing a floorplan with this
 limited set of rules:

 * The floorplan is binding on The Community until March 2nd at 00:00
 * No significant modifications may be done to the floorplan after the
 floorplan is approved without majority approval from the committee members
 * Any committee member may declare a modification to be significant such
 that
 it is required to be approved by the committee
 * The floorplan shall not include anything that cannot be uninstalled,
 moved,
 disassembled, or otherwise modified over a two day weekend after March 3rd
 without unaminous approval from the committee members
 * The committee is dissolved on March 2nd at 00:00
 * Additions to the committee shall not change without majority approval
 from
 the committee members or a Membership proposal
 * Committee discussion and voting is held on the build@ list
 * The SYNHAK Secretary is responsible for maintaining the committee
 membership
 roster
 * The roster and any other commitee records are made public to The
 Membership
 * Only Active Members in Good Standing are permitted to be a committee
 member
 * Committee members may resign at any time, only in writing to the
 committee

 
  After a decision has been made, print out a few copies to work from and
  start moving stuff into the designated areas.
 
  The members will take it from there, knowing that a final floorplan
 exists.
 
  If this doesn't sound like a workable solution, then just keep on
 bickering
  and squabbling about where to put things or who gets his way about this
 or
  that.
 
  Of course, the opening day celebration might have to be moved to August
 1st
  if you keep up the noise level and refuse to cooperate with each other.
 
  Reminds me of 4th grade recess out on the parking lot...
 
  On Thu, Feb 6, 2014 at 9:47 AM, Torrie Fischer
 tdfisc...@hackerbots.netwrote:
   On Thursday, February 06, 2014 01:41:59 Craig Bergdorf wrote:
What if the EE lab and general meeting area were connected again in
 an
L? Having the meeting area being the entire width we could fit the
 21
people we had at this weeks meeting.   Also with a shrunken machine
 shop
from the first post to the floor drain, a clear shot to load/unload
 from
the garage door including the basement  4x8 sheets to the machine
 room.
The right side of the back 40 is left out, a good classroom and
something
else could spaciously fit in there.  I'm just trying to get 21
 unpacked.
  
2
  
weeks, 2 days till the soft launch.
   
http://calculais.com/syn/2/5.1.pdf
  
   Replying to indicate that I have given up on caring about floorplans
 since
   any
   such discussion inevitably ends up pissing me off when I get told how
   wrong my
   ideas are without any real logical argument.
   ___
   Discuss mailing list
   Discuss@synhak.org
   https://synhak.org/mailman/listinfo/discuss
 ___
 Discuss mailing list
 Discuss@synhak.org
 https://synhak.org/mailman/listinfo/discuss


 ___
 Discuss mailing list
 Discuss@synhak.org
 https://synhak.org/mailman/listinfo/discuss

___
Discuss mailing list
Discuss@synhak.org
https://synhak.org/mailman/listinfo/discuss

Re: [SH-Discuss] something for summer

2014-02-06 Thread Martin Pinkston
For those requesting more about the locomotive hobby.
My train club is The Lake Shore Live Steamers.
Www.lakeshorelivesteamers.com
I am in the process of building my 3rd, 1/8 scale, 7.5 gauge, live steam 
locomotive. It's a Heisler logging engine and about 90% completed.
I also have 3 electric locomotives.
The steamers had actual printed plans, the electrics were my designs, but all 
were scratch built.

Take Care  Have fun Always.
Martin Pinkston RN
___
Discuss mailing list
Discuss@synhak.org
https://synhak.org/mailman/listinfo/discuss


Re: [SH-Discuss] Kitchen Oven and Stove

2014-02-06 Thread Becca Salchak
The only thing is how many dishes are we going to have if I am baking I
would only make 5 dishes max and half I would have to do by hand any way
On Feb 6, 2014 2:12 PM, Omar Rassi omar.ra...@gmail.com wrote:

 Personally I'd like a dishwasher! Is it a standalone or one of those units
 that goes under a counter/sink???


 On Thu, Feb 6, 2014 at 2:03 PM, Justin Herman just...@gmail.com wrote:

 It wasn't a suggestion just an offer. When I was picking up the stove the
 dishwasher was offered too.


 On Thu, Feb 6, 2014 at 1:26 PM, Torrie Fischer 
 tdfisc...@hackerbots.netwrote:

 On Thursday, February 06, 2014 12:25:27 Justin Herman wrote:
  Do we want a dishwasher?

 Sure, once everyone is trained to clean up their soda cans and bags of
 fast
 food :)

 
 
  On Wed, Feb 5, 2014 at 11:22 PM, Tiki Mclemore 
 spiralsparrowcr...@gmail.com
   wrote:
  
   I am so happy! I can't wait for the kitchen to come together!!!
  
   ___
   Discuss mailing list
   Discuss@synhak.org
   https://synhak.org/mailman/listinfo/discuss
 ___
 Discuss mailing list
 Discuss@synhak.org
 https://synhak.org/mailman/listinfo/discuss



 ___
 Discuss mailing list
 Discuss@synhak.org
 https://synhak.org/mailman/listinfo/discuss



 ___
 Discuss mailing list
 Discuss@synhak.org
 https://synhak.org/mailman/listinfo/discuss

___
Discuss mailing list
Discuss@synhak.org
https://synhak.org/mailman/listinfo/discuss

Re: [SH-Discuss] another zoning proposal

2014-02-06 Thread Torrie Fischer
On Thursday, February 06, 2014 11:40:49 degerov...@yahoo.com wrote:
 I volunteer myself for the committee. Can we meet tomorrow at 7pm at the
 space?
 
 Devin.
 
 Sent from Yahoo Mail on Android

I can't make that due to SparkAK. I'm busy 'till Monday.
___
Discuss mailing list
Discuss@synhak.org
https://synhak.org/mailman/listinfo/discuss


Re: [SH-Discuss] another zoning proposal

2014-02-06 Thread Philip P. Patnode
So, who is going to be #5?

Torrie @ 1324

Becca @ 1407

Justin @ 1408

Devin @ 1440

#5 @ ?

Good to see that some of the members are interested and motivated to get
the new floorplan finalized.




On Thu, Feb 6, 2014 at 2:40 PM, degerov...@yahoo.com
degerov...@yahoo.comwrote:

 I volunteer myself for the committee. Can we meet tomorrow at 7pm at the
 space?

 Devin.

 Sent from Yahoo Mail on 
 Androidhttp://overview.mail.yahoo.com/mobile/?.src=Android

  --
 * From: * Becca Salchak blsalc...@yahoo.com;
 * To: * SYN/HAK discussion list discuss@synhak.org;
 * Subject: * Re: [SH-Discuss] another zoning proposal
 * Sent: * Thu, Feb 6, 2014 7:07:38 PM

   Id like to volunteer myself for the committee
 On Feb 6, 2014 1:24 PM, Torrie Fischer tdfisc...@hackerbots.net wrote:

 On Thursday, February 06, 2014 12:31:45 Philip P. Patnode wrote:
  Torrie is doing what she needs to do in the face of the continuing
  bickering, deal making, personal agendas, ego-driven land grabs, and the
  subtle obstructionism shown by some members over the floorplan.
 
  In the face of complete chaos and a looming deadline, form a committee.
 
  Yes, I am serious.
 
  Following the philosophy of action as a do'ocracy, some motivated
 members
  should assemble to discuss the floorplan and make a final decision.
 
  Five people, with sharp pencils and blank paper, can sketch out a
  compromise floorplan in under an hour.  Add another half hour for coffee
  and revisions.

 This is an excellent idea. I think this could also be a wonderful
 experiment
 in an improved governance process for the space. Consensus is starting to
 fall
 apart.

 There was recently a large thread on noisebridge-discuss along the very
 same
 lines. I will look at their discussion and see what happened.

 I'm wholly in favor of such a committee producing a floorplan with this
 limited set of rules:

 * The floorplan is binding on The Community until March 2nd at 00:00
 * No significant modifications may be done to the floorplan after the
 floorplan is approved without majority approval from the committee members
 * Any committee member may declare a modification to be significant such
 that
 it is required to be approved by the committee
 * The floorplan shall not include anything that cannot be uninstalled,
 moved,
 disassembled, or otherwise modified over a two day weekend after March 3rd
 without unaminous approval from the committee members
 * The committee is dissolved on March 2nd at 00:00
 * Additions to the committee shall not change without majority approval
 from
 the committee members or a Membership proposal
 * Committee discussion and voting is held on the build@ list
 * The SYNHAK Secretary is responsible for maintaining the committee
 membership
 roster
 * The roster and any other commitee records are made public to The
 Membership
 * Only Active Members in Good Standing are permitted to be a committee
 member
 * Committee members may resign at any time, only in writing to the
 committee

 
  After a decision has been made, print out a few copies to work from and
  start moving stuff into the designated areas.
 
  The members will take it from there, knowing that a final floorplan
 exists.
 
  If this doesn't sound like a workable solution, then just keep on
 bickering
  and squabbling about where to put things or who gets his way about this
 or
  that.
 
  Of course, the opening day celebration might have to be moved to August
 1st
  if you keep up the noise level and refuse to cooperate with each other.
 
  Reminds me of 4th grade recess out on the parking lot...
 
  On Thu, Feb 6, 2014 at 9:47 AM, Torrie Fischer
 tdfisc...@hackerbots.netwrote:
   On Thursday, February 06, 2014 01:41:59 Craig Bergdorf wrote:
What if the EE lab and general meeting area were connected again in
 an
L? Having the meeting area being the entire width we could fit the
 21
people we had at this weeks meeting.   Also with a shrunken machine
 shop
from the first post to the floor drain, a clear shot to load/unload
 from
the garage door including the basement  4x8 sheets to the machine
 room.
The right side of the back 40 is left out, a good classroom and
something
else could spaciously fit in there.  I'm just trying to get 21
 unpacked.
  
2
  
weeks, 2 days till the soft launch.
   
http://calculais.com/syn/2/5.1.pdf
  
   Replying to indicate that I have given up on caring about floorplans
 since
   any
   such discussion inevitably ends up pissing me off when I get told how
   wrong my
   ideas are without any real logical argument.
   ___
   Discuss mailing list
   Discuss@synhak.org
   https://synhak.org/mailman/listinfo/discuss
 ___
 Discuss mailing list
 Discuss@synhak.org
 https://synhak.org/mailman/listinfo/discuss


 ___
 Discuss mailing list
 

Re: [SH-Discuss] another zoning proposal

2014-02-06 Thread Craig Bergdorf
I'll happily draw it up as it's being discussed. I am also busy with
SparkAK this weekend, what about tonight at 8? If not, then how about
Monday?


On Thu, Feb 6, 2014 at 4:02 PM, Craig Bergdorf mm1...@gmail.com wrote:

 Right here for #5
 On Feb 6, 2014 2:58 PM, Philip P. Patnode ppatn...@gmail.com wrote:

 So, who is going to be #5?

 Torrie @ 1324

 Becca @ 1407

 Justin @ 1408

 Devin @ 1440

 #5 @ ?

 Good to see that some of the members are interested and motivated to get
 the new floorplan finalized.




 On Thu, Feb 6, 2014 at 2:40 PM, degerov...@yahoo.com 
 degerov...@yahoo.com wrote:

 I volunteer myself for the committee. Can we meet tomorrow at 7pm at the
 space?

 Devin.

 Sent from Yahoo Mail on 
 Androidhttp://overview.mail.yahoo.com/mobile/?.src=Android

  --
 * From: * Becca Salchak blsalc...@yahoo.com;
 * To: * SYN/HAK discussion list discuss@synhak.org;
 * Subject: * Re: [SH-Discuss] another zoning proposal
 * Sent: * Thu, Feb 6, 2014 7:07:38 PM

   Id like to volunteer myself for the committee
 On Feb 6, 2014 1:24 PM, Torrie Fischer tdfisc...@hackerbots.net
 wrote:

 On Thursday, February 06, 2014 12:31:45 Philip P. Patnode wrote:
  Torrie is doing what she needs to do in the face of the continuing
  bickering, deal making, personal agendas, ego-driven land grabs, and
 the
  subtle obstructionism shown by some members over the floorplan.
 
  In the face of complete chaos and a looming deadline, form a
 committee.
 
  Yes, I am serious.
 
  Following the philosophy of action as a do'ocracy, some motivated
 members
  should assemble to discuss the floorplan and make a final decision.
 
  Five people, with sharp pencils and blank paper, can sketch out a
  compromise floorplan in under an hour.  Add another half hour for
 coffee
  and revisions.

 This is an excellent idea. I think this could also be a wonderful
 experiment
 in an improved governance process for the space. Consensus is starting
 to fall
 apart.

 There was recently a large thread on noisebridge-discuss along the very
 same
 lines. I will look at their discussion and see what happened.

 I'm wholly in favor of such a committee producing a floorplan with this
 limited set of rules:

 * The floorplan is binding on The Community until March 2nd at 00:00
 * No significant modifications may be done to the floorplan after the
 floorplan is approved without majority approval from the committee
 members
 * Any committee member may declare a modification to be significant
 such that
 it is required to be approved by the committee
 * The floorplan shall not include anything that cannot be uninstalled,
 moved,
 disassembled, or otherwise modified over a two day weekend after March
 3rd
 without unaminous approval from the committee members
 * The committee is dissolved on March 2nd at 00:00
 * Additions to the committee shall not change without majority approval
 from
 the committee members or a Membership proposal
 * Committee discussion and voting is held on the build@ list
 * The SYNHAK Secretary is responsible for maintaining the committee
 membership
 roster
 * The roster and any other commitee records are made public to The
 Membership
 * Only Active Members in Good Standing are permitted to be a committee
 member
 * Committee members may resign at any time, only in writing to the
 committee

 
  After a decision has been made, print out a few copies to work from
 and
  start moving stuff into the designated areas.
 
  The members will take it from there, knowing that a final floorplan
 exists.
 
  If this doesn't sound like a workable solution, then just keep on
 bickering
  and squabbling about where to put things or who gets his way about
 this or
  that.
 
  Of course, the opening day celebration might have to be moved to
 August 1st
  if you keep up the noise level and refuse to cooperate with each
 other.
 
  Reminds me of 4th grade recess out on the parking lot...
 
  On Thu, Feb 6, 2014 at 9:47 AM, Torrie Fischer
 tdfisc...@hackerbots.netwrote:
   On Thursday, February 06, 2014 01:41:59 Craig Bergdorf wrote:
What if the EE lab and general meeting area were connected again
 in an
L? Having the meeting area being the entire width we could fit
 the 21
people we had at this weeks meeting.   Also with a shrunken
 machine shop
from the first post to the floor drain, a clear shot to
 load/unload from
the garage door including the basement  4x8 sheets to the
 machine room.
The right side of the back 40 is left out, a good classroom and
something
else could spaciously fit in there.  I'm just trying to get 21
 unpacked.
  
2
  
weeks, 2 days till the soft launch.
   
http://calculais.com/syn/2/5.1.pdf
  
   Replying to indicate that I have given up on caring about
 floorplans since
   any
   such discussion inevitably ends up pissing me off when I get told
 how
   wrong my
   ideas are without any real logical argument.
   

Re: [SH-Discuss] another zoning proposal

2014-02-06 Thread Craig Bergdorf
Right here for #5
On Feb 6, 2014 2:58 PM, Philip P. Patnode ppatn...@gmail.com wrote:

 So, who is going to be #5?

 Torrie @ 1324

 Becca @ 1407

 Justin @ 1408

 Devin @ 1440

 #5 @ ?

 Good to see that some of the members are interested and motivated to get
 the new floorplan finalized.




 On Thu, Feb 6, 2014 at 2:40 PM, degerov...@yahoo.com degerov...@yahoo.com
  wrote:

 I volunteer myself for the committee. Can we meet tomorrow at 7pm at the
 space?

 Devin.

 Sent from Yahoo Mail on 
 Androidhttp://overview.mail.yahoo.com/mobile/?.src=Android

  --
 * From: * Becca Salchak blsalc...@yahoo.com;
 * To: * SYN/HAK discussion list discuss@synhak.org;
 * Subject: * Re: [SH-Discuss] another zoning proposal
 * Sent: * Thu, Feb 6, 2014 7:07:38 PM

   Id like to volunteer myself for the committee
 On Feb 6, 2014 1:24 PM, Torrie Fischer tdfisc...@hackerbots.net
 wrote:

 On Thursday, February 06, 2014 12:31:45 Philip P. Patnode wrote:
  Torrie is doing what she needs to do in the face of the continuing
  bickering, deal making, personal agendas, ego-driven land grabs, and
 the
  subtle obstructionism shown by some members over the floorplan.
 
  In the face of complete chaos and a looming deadline, form a committee.
 
  Yes, I am serious.
 
  Following the philosophy of action as a do'ocracy, some motivated
 members
  should assemble to discuss the floorplan and make a final decision.
 
  Five people, with sharp pencils and blank paper, can sketch out a
  compromise floorplan in under an hour.  Add another half hour for
 coffee
  and revisions.

 This is an excellent idea. I think this could also be a wonderful
 experiment
 in an improved governance process for the space. Consensus is starting
 to fall
 apart.

 There was recently a large thread on noisebridge-discuss along the very
 same
 lines. I will look at their discussion and see what happened.

 I'm wholly in favor of such a committee producing a floorplan with this
 limited set of rules:

 * The floorplan is binding on The Community until March 2nd at 00:00
 * No significant modifications may be done to the floorplan after the
 floorplan is approved without majority approval from the committee
 members
 * Any committee member may declare a modification to be significant such
 that
 it is required to be approved by the committee
 * The floorplan shall not include anything that cannot be uninstalled,
 moved,
 disassembled, or otherwise modified over a two day weekend after March
 3rd
 without unaminous approval from the committee members
 * The committee is dissolved on March 2nd at 00:00
 * Additions to the committee shall not change without majority approval
 from
 the committee members or a Membership proposal
 * Committee discussion and voting is held on the build@ list
 * The SYNHAK Secretary is responsible for maintaining the committee
 membership
 roster
 * The roster and any other commitee records are made public to The
 Membership
 * Only Active Members in Good Standing are permitted to be a committee
 member
 * Committee members may resign at any time, only in writing to the
 committee

 
  After a decision has been made, print out a few copies to work from and
  start moving stuff into the designated areas.
 
  The members will take it from there, knowing that a final floorplan
 exists.
 
  If this doesn't sound like a workable solution, then just keep on
 bickering
  and squabbling about where to put things or who gets his way about
 this or
  that.
 
  Of course, the opening day celebration might have to be moved to
 August 1st
  if you keep up the noise level and refuse to cooperate with each other.
 
  Reminds me of 4th grade recess out on the parking lot...
 
  On Thu, Feb 6, 2014 at 9:47 AM, Torrie Fischer
 tdfisc...@hackerbots.netwrote:
   On Thursday, February 06, 2014 01:41:59 Craig Bergdorf wrote:
What if the EE lab and general meeting area were connected again
 in an
L? Having the meeting area being the entire width we could fit the
 21
people we had at this weeks meeting.   Also with a shrunken
 machine shop
from the first post to the floor drain, a clear shot to
 load/unload from
the garage door including the basement  4x8 sheets to the machine
 room.
The right side of the back 40 is left out, a good classroom and
something
else could spaciously fit in there.  I'm just trying to get 21
 unpacked.
  
2
  
weeks, 2 days till the soft launch.
   
http://calculais.com/syn/2/5.1.pdf
  
   Replying to indicate that I have given up on caring about floorplans
 since
   any
   such discussion inevitably ends up pissing me off when I get told how
   wrong my
   ideas are without any real logical argument.
   ___
   Discuss mailing list
   Discuss@synhak.org
   https://synhak.org/mailman/listinfo/discuss
 ___
 Discuss mailing list
 Discuss@synhak.org
 

Re: [SH-Discuss] another zoning proposal

2014-02-06 Thread Justin Herman
This week is bad for me next week is good.


On Thu, Feb 6, 2014 at 4:12 PM, Craig Bergdorf mm1...@gmail.com wrote:

 I'll happily draw it up as it's being discussed. I am also busy with
 SparkAK this weekend, what about tonight at 8? If not, then how about
 Monday?


 On Thu, Feb 6, 2014 at 4:02 PM, Craig Bergdorf mm1...@gmail.com wrote:

 Right here for #5
 On Feb 6, 2014 2:58 PM, Philip P. Patnode ppatn...@gmail.com wrote:

 So, who is going to be #5?

 Torrie @ 1324

 Becca @ 1407

 Justin @ 1408

 Devin @ 1440

 #5 @ ?

 Good to see that some of the members are interested and motivated to get
 the new floorplan finalized.




 On Thu, Feb 6, 2014 at 2:40 PM, degerov...@yahoo.com 
 degerov...@yahoo.com wrote:

 I volunteer myself for the committee. Can we meet tomorrow at 7pm at
 the space?

 Devin.

 Sent from Yahoo Mail on 
 Androidhttp://overview.mail.yahoo.com/mobile/?.src=Android

  --
 * From: * Becca Salchak blsalc...@yahoo.com;
 * To: * SYN/HAK discussion list discuss@synhak.org;
 * Subject: * Re: [SH-Discuss] another zoning proposal
 * Sent: * Thu, Feb 6, 2014 7:07:38 PM

   Id like to volunteer myself for the committee
 On Feb 6, 2014 1:24 PM, Torrie Fischer tdfisc...@hackerbots.net
 wrote:

 On Thursday, February 06, 2014 12:31:45 Philip P. Patnode wrote:
  Torrie is doing what she needs to do in the face of the continuing
  bickering, deal making, personal agendas, ego-driven land grabs, and
 the
  subtle obstructionism shown by some members over the floorplan.
 
  In the face of complete chaos and a looming deadline, form a
 committee.
 
  Yes, I am serious.
 
  Following the philosophy of action as a do'ocracy, some motivated
 members
  should assemble to discuss the floorplan and make a final decision.
 
  Five people, with sharp pencils and blank paper, can sketch out a
  compromise floorplan in under an hour.  Add another half hour for
 coffee
  and revisions.

 This is an excellent idea. I think this could also be a wonderful
 experiment
 in an improved governance process for the space. Consensus is starting
 to fall
 apart.

 There was recently a large thread on noisebridge-discuss along the
 very same
 lines. I will look at their discussion and see what happened.

 I'm wholly in favor of such a committee producing a floorplan with this
 limited set of rules:

 * The floorplan is binding on The Community until March 2nd at 00:00
 * No significant modifications may be done to the floorplan after the
 floorplan is approved without majority approval from the committee
 members
 * Any committee member may declare a modification to be significant
 such that
 it is required to be approved by the committee
 * The floorplan shall not include anything that cannot be uninstalled,
 moved,
 disassembled, or otherwise modified over a two day weekend after March
 3rd
 without unaminous approval from the committee members
 * The committee is dissolved on March 2nd at 00:00
 * Additions to the committee shall not change without majority
 approval from
 the committee members or a Membership proposal
 * Committee discussion and voting is held on the build@ list
 * The SYNHAK Secretary is responsible for maintaining the committee
 membership
 roster
 * The roster and any other commitee records are made public to The
 Membership
 * Only Active Members in Good Standing are permitted to be a committee
 member
 * Committee members may resign at any time, only in writing to the
 committee

 
  After a decision has been made, print out a few copies to work from
 and
  start moving stuff into the designated areas.
 
  The members will take it from there, knowing that a final floorplan
 exists.
 
  If this doesn't sound like a workable solution, then just keep on
 bickering
  and squabbling about where to put things or who gets his way about
 this or
  that.
 
  Of course, the opening day celebration might have to be moved to
 August 1st
  if you keep up the noise level and refuse to cooperate with each
 other.
 
  Reminds me of 4th grade recess out on the parking lot...
 
  On Thu, Feb 6, 2014 at 9:47 AM, Torrie Fischer
 tdfisc...@hackerbots.netwrote:
   On Thursday, February 06, 2014 01:41:59 Craig Bergdorf wrote:
What if the EE lab and general meeting area were connected again
 in an
L? Having the meeting area being the entire width we could fit
 the 21
people we had at this weeks meeting.   Also with a shrunken
 machine shop
from the first post to the floor drain, a clear shot to
 load/unload from
the garage door including the basement  4x8 sheets to the
 machine room.
The right side of the back 40 is left out, a good classroom and
something
else could spaciously fit in there.  I'm just trying to get 21
 unpacked.
  
2
  
weeks, 2 days till the soft launch.
   
http://calculais.com/syn/2/5.1.pdf
  
   Replying to indicate that I have given up on caring about
 floorplans since
   any
   such discussion inevitably ends up pissing me off 

Re: [SH-Discuss] another zoning proposal

2014-02-06 Thread Craig Bergdorf
I'm here now, but leaving in 30 mins to return around 9 tonight
On Feb 6, 2014 4:30 PM, Becca Salchak blsalc...@yahoo.com wrote:

 I can be down at Synhak at like 9  tonight
 On Feb 6, 2014 4:13 PM, Craig Bergdorf mm1...@gmail.com wrote:

 I'll happily draw it up as it's being discussed. I am also busy with
 SparkAK this weekend, what about tonight at 8? If not, then how about
 Monday?


 On Thu, Feb 6, 2014 at 4:02 PM, Craig Bergdorf mm1...@gmail.com wrote:

 Right here for #5
 On Feb 6, 2014 2:58 PM, Philip P. Patnode ppatn...@gmail.com wrote:

 So, who is going to be #5?

 Torrie @ 1324

 Becca @ 1407

 Justin @ 1408

 Devin @ 1440

 #5 @ ?

 Good to see that some of the members are interested and motivated to
 get the new floorplan finalized.




 On Thu, Feb 6, 2014 at 2:40 PM, degerov...@yahoo.com 
 degerov...@yahoo.com wrote:

 I volunteer myself for the committee. Can we meet tomorrow at 7pm at
 the space?

 Devin.

 Sent from Yahoo Mail on 
 Androidhttp://overview.mail.yahoo.com/mobile/?.src=Android

  --
 * From: * Becca Salchak blsalc...@yahoo.com;
 * To: * SYN/HAK discussion list discuss@synhak.org;
 * Subject: * Re: [SH-Discuss] another zoning proposal
 * Sent: * Thu, Feb 6, 2014 7:07:38 PM

   Id like to volunteer myself for the committee
 On Feb 6, 2014 1:24 PM, Torrie Fischer tdfisc...@hackerbots.net
 wrote:

 On Thursday, February 06, 2014 12:31:45 Philip P. Patnode wrote:
  Torrie is doing what she needs to do in the face of the continuing
  bickering, deal making, personal agendas, ego-driven land grabs,
 and the
  subtle obstructionism shown by some members over the floorplan.
 
  In the face of complete chaos and a looming deadline, form a
 committee.
 
  Yes, I am serious.
 
  Following the philosophy of action as a do'ocracy, some motivated
 members
  should assemble to discuss the floorplan and make a final decision.
 
  Five people, with sharp pencils and blank paper, can sketch out a
  compromise floorplan in under an hour.  Add another half hour for
 coffee
  and revisions.

 This is an excellent idea. I think this could also be a wonderful
 experiment
 in an improved governance process for the space. Consensus is
 starting to fall
 apart.

 There was recently a large thread on noisebridge-discuss along the
 very same
 lines. I will look at their discussion and see what happened.

 I'm wholly in favor of such a committee producing a floorplan with
 this
 limited set of rules:

 * The floorplan is binding on The Community until March 2nd at 00:00
 * No significant modifications may be done to the floorplan after the
 floorplan is approved without majority approval from the committee
 members
 * Any committee member may declare a modification to be significant
 such that
 it is required to be approved by the committee
 * The floorplan shall not include anything that cannot be
 uninstalled, moved,
 disassembled, or otherwise modified over a two day weekend after
 March 3rd
 without unaminous approval from the committee members
 * The committee is dissolved on March 2nd at 00:00
 * Additions to the committee shall not change without majority
 approval from
 the committee members or a Membership proposal
 * Committee discussion and voting is held on the build@ list
 * The SYNHAK Secretary is responsible for maintaining the committee
 membership
 roster
 * The roster and any other commitee records are made public to The
 Membership
 * Only Active Members in Good Standing are permitted to be a
 committee member
 * Committee members may resign at any time, only in writing to the
 committee

 
  After a decision has been made, print out a few copies to work from
 and
  start moving stuff into the designated areas.
 
  The members will take it from there, knowing that a final floorplan
 exists.
 
  If this doesn't sound like a workable solution, then just keep on
 bickering
  and squabbling about where to put things or who gets his way about
 this or
  that.
 
  Of course, the opening day celebration might have to be moved to
 August 1st
  if you keep up the noise level and refuse to cooperate with each
 other.
 
  Reminds me of 4th grade recess out on the parking lot...
 
  On Thu, Feb 6, 2014 at 9:47 AM, Torrie Fischer
 tdfisc...@hackerbots.netwrote:
   On Thursday, February 06, 2014 01:41:59 Craig Bergdorf wrote:
What if the EE lab and general meeting area were connected
 again in an
L? Having the meeting area being the entire width we could fit
 the 21
people we had at this weeks meeting.   Also with a shrunken
 machine shop
from the first post to the floor drain, a clear shot to
 load/unload from
the garage door including the basement  4x8 sheets to the
 machine room.
The right side of the back 40 is left out, a good classroom and
something
else could spaciously fit in there.  I'm just trying to get 21
 unpacked.
  
2
  
weeks, 2 days till the soft launch.
   
http://calculais.com/syn/2/5.1.pdf
  
   Replying to 

[SH-Discuss] 2/13 at 6pm: Special meeting at Synhak to fill Knight Foundation Grant Proposal Form!

2014-02-06 Thread gs volt
Greetings,

Knight Foundation has emailed me a Grant Proposal Form.

About Knight Foundation:

Knight Foundation focuses on projects that promote informed and engaged
communities. In Akron, we are supporting talent attraction and retention
necessary to build a 21st century economy.


This Grant Proposal Form form is used to evaluate whether Knight supports
an organization's work. In this form, I plan to declare to Knight what we
need help with.

Ofcourse, I need help with coming up with what we need help with :)

I'm planning to meet in person with anyone interested in helping with
filling this form on Thu Feb 13th at 6pm at our new location at 48 S Summit
St for a discussion.

Until then, here are the important things in the form that we can all
individually think about responses to (mostly a plaintext copy paste of
things in the form that I thought were important):

   - Does Synhak plan to use a fiscal agent? (if not, Knight recommends
   Miami Foundation)
   - Proposal for a project
  - Total cost? $
  - Requested from Knight?  $
  - Over how many years?
  - Synhak's operating revenues $ ... and expenses $... for the current
  year and the end date of our fiscal year 
  - Attachments that would help Knight and they expect:
 - *Project Budget .. very important for completeness of form*
 - Existing funders
 - Any major expenses/capital equipment we plan to purchase
  - Proposal Narrative (few paragraphs per each of the following):
  1. Purpose of grant in one short sentence
  2. What is the project
  3. List key activities and the timetable, including the grant start
  and end dates
  4. Why is this a fit for Knight Foundation?
 1. Explain how you will intentionally engage the community,
 improve or provide access to information flow, and address the Akron
 strategy of engaging and retaining the next generation of talent.
  5. What are our outcomes?
 1. Indicate 2 or 3 concrete changes you would like to see in place
 at the end of your grant period
  6. Measuring success?
 1. List the metrics that we will use to track the success of our
 outcomes

Towards the end .. it states:

As a potential grantee of Knight Foundation, please be aware of the
following:

Submission of this proposal indicates your organization's permission for
Knight Foundation to ask people who are not members of the Foundation's
staff to review the proposal and to give advice and information to the
Foundation about your organization, board, staff and others with whom you
are affiliated.  Materials submitted to Knight Foundation as part of the
proposal process will be used as the foundation deems appropriate.  They
are not subject to any right of confidentiality unless specifically agreed
to in writing by Knight Foundation.

Knight Foundation is under no obligation to fund the applicant. If it does
choose to have a future relationship, the foundation may suggest the type,
including contracts, grants, loans, program-related investments or others.


I'm excited about this.

^^ Devin, Torrie, Chris

All: please let me know if that scheduled time does not work - feel free to
counter it.

My plan is to finish and submit this form by 2/21

After that it'll be in Knight's hands.

Regards,

-- 
G | Gaurav Narain Saxena | (330) 283 - 4972

I am a Board Member at SYN/HAK http://www.synhak.org: The Akron
Hackerspace located at 48 S Summit St Akron Ohio
44308https://maps.google.com/maps?q=48+S+Summit+St+Akron+Ohio+44308

I am providing technical consulting services to
Sherwin-Williamshttp://www.sherwin-williams.com/on behalf of Bennett
Adelson http://www.bennettadelson.com/ (Microsoft Solution Center)
located at 6050 Oak Tree Blvd, Cleveland, Ohio
44131https://maps.google.com/maps?q=6050+Oak+Tree+Blvd,+Cleveland,+Ohio+44131
I have also been providing solutions to non-trivial problems other
businesses may have through my company Whiskey Bits LLC located in Portage
Lakes, Ohio
Learn more about things I have created by reading my About
pagehttp://gsvolt.wordpress.com/about-2/on my
blog http://gsvolt.wordpress.com/
___
Discuss mailing list
Discuss@synhak.org
https://synhak.org/mailman/listinfo/discuss

Re: [SH-Discuss] 2/13 at 6pm: Special meeting at Synhak to fill Knight Foundation Grant Proposal Form!

2014-02-06 Thread Omar Rassi
Also, what I wrote are ideas, not actual items, unless they are actual
things we're trying to accomplish then yes I concur.


On Thu, Feb 6, 2014 at 6:30 PM, Omar Rassi omar.ra...@gmail.com wrote:

 I tried to answer some these questions real quick while holding a
 squirming baby on my lap at my laptop in the kitchen. What I wrote is in
 *ITALICS.*

- Does Synhak plan to use a fiscal agent? (if not, Knight recommends
Miami Foundation)
- Proposal for a project (*renovation of the building we occupy 48
South Summit Street*)
   - Total cost? $100,000 (*AKA Omar's purely arbitrary guesstimation
   based on previous conversations with other members*)
   - Requested from Knight?  *$100,000*
   - Over how many years? 2 (*spread out the work! we're all doing
   this in our spare time after all*)
   - Synhak's operating revenues $ *???* and expenses $ *???* for the
   current year and the end date of our fiscal year 
   - Attachments that would help Knight and they expect:
   - *Project Budget .. very important for completeness of form *(*Does
  the treasurer have this?)*
  - Existing funders (*Synhak Membership*)
  - Any major expenses/capital equipment we plan to purchase (*LASERS!
  ZAP! uhhh... shoring up the south wall, more roof/ceiling repair,
  re-finishing the Perkins room, ELECTRICAL ELECTRICAL ELECTRICAL, 
 plumbing*
  )
   - Proposal Narrative (few paragraphs per each of the following):
1. Purpose of grant in one short sentence, *In order to create a more
   perfect hackerspace, we wish to renovate and improve the building 
 occupied
   by said hackerspace.*
   2. What is the project, *Project Edify*
   3. List key activities and the timetable, including the grant start
   and end dates *???*
   4. Why is this a fit for Knight Foundation? *???*
  1. Explain how you will intentionally engage the community,
  improve or provide access to information flow, and address the Akron
  strategy of engaging and retaining the next generation of talent. 
 *See
  www.synhak.org http://www.synhak.org*
   5. What are our outcomes?
  1. *Laser cutter!*
  2. *Safer more energy efficient building*
  3. *attract more members with a more attractive infrastructure*
   6. Measuring success?
  1. List the metrics that we will use to track the success of our
  outcomes *BUZZWORDS*



 On Thu, Feb 6, 2014 at 5:52 PM, gs volt gsvo...@gmail.com wrote:

 Greetings,

 Knight Foundation has emailed me a Grant Proposal Form.

 About Knight Foundation:

 Knight Foundation focuses on projects that promote informed and engaged
 communities. In Akron, we are supporting talent attraction and retention
 necessary to build a 21st century economy.


 This Grant Proposal Form form is used to evaluate whether Knight supports
 an organization's work. In this form, I plan to declare to Knight what we
 need help with.

 Ofcourse, I need help with coming up with what we need help with :)

 I'm planning to meet in person with anyone interested in helping with
 filling this form on Thu Feb 13th at 6pm at our new location at 48 S Summit
 St for a discussion.

 Until then, here are the important things in the form that we can all
 individually think about responses to (mostly a plaintext copy paste of
 things in the form that I thought were important):

- Does Synhak plan to use a fiscal agent? (if not, Knight recommends
Miami Foundation)
- Proposal for a project
   - Total cost? $
   - Requested from Knight?  $
   - Over how many years?
   - Synhak's operating revenues $ ... and expenses $... for the
   current year and the end date of our fiscal year 
   - Attachments that would help Knight and they expect:
  - *Project Budget .. very important for completeness of form*
  - Existing funders
  - Any major expenses/capital equipment we plan to purchase
   - Proposal Narrative (few paragraphs per each of the following):
   1. Purpose of grant in one short sentence
   2. What is the project
   3. List key activities and the timetable, including the grant
   start and end dates
   4. Why is this a fit for Knight Foundation?
  1. Explain how you will intentionally engage the community,
  improve or provide access to information flow, and address the Akron
  strategy of engaging and retaining the next generation of talent.
   5. What are our outcomes?
  1. Indicate 2 or 3 concrete changes you would like to see in
  place at the end of your grant period
   6. Measuring success?
  1. List the metrics that we will use to track the success of
  our outcomes

 Towards the end .. it states:

 As a potential grantee of Knight Foundation, please be aware of the
 following:

 Submission of this proposal 

Re: [SH-Discuss] another zoning proposal

2014-02-06 Thread degerovita
I will be available monday afternoon as well.





 From: Torrie Fischer tdfisc...@hackerbots.net
To: SYN/HAK discussion list discuss@synhak.org 
Sent: Thursday, February 6, 2014 5:09 PM
Subject: Re: [SH-Discuss] another zoning proposal
 

On Thursday, February 06, 2014 16:12:00 Craig Bergdorf wrote:
 I'll happily draw it up as it's being discussed. I am also busy with
 SparkAK this weekend, what about tonight at 8? If not, then how about
 Monday?

Monday works. Lets do Monday. I'll be there after 6 PM for more painting, so 
can we get a committee working by 8PM?

We don't need to decide today of course. I'm busy with SparkAK all weekend but 
I'll have e-mail of course.

 
 On Thu, Feb 6, 2014 at 4:02 PM, Craig Bergdorf mm1...@gmail.com wrote:
  Right here for #5
  
  On Feb 6, 2014 2:58 PM, Philip P. Patnode ppatn...@gmail.com wrote:
  So, who is going to be #5?
  
  Torrie @ 1324
  
  Becca @ 1407
  
  Justin @ 1408
  
  Devin @ 1440
  
  #5 @ ?
  
  Good to see that some of the members are interested and motivated to get
  the new floorplan finalized.
  
  
  
  
  On Thu, Feb 6, 2014 at 2:40 PM, degerov...@yahoo.com 
  
  degerov...@yahoo.com wrote:
  I volunteer myself for the committee. Can we meet tomorrow at 7pm at the
  space?
  
  Devin.
  
  Sent from Yahoo Mail on
  Androidhttp://overview.mail.yahoo.com/mobile/?.src=Android 
   --
  
  * From: * Becca Salchak blsalc...@yahoo.com;
  * To: * SYN/HAK discussion list discuss@synhak.org;
  * Subject: * Re: [SH-Discuss] another zoning proposal
  * Sent: * Thu, Feb 6, 2014 7:07:38 PM
  
    Id like to volunteer myself for the committee
  
  On Feb 6, 2014 1:24 PM, Torrie Fischer tdfisc...@hackerbots.net
  
  wrote:
  On Thursday, February 06, 2014 12:31:45 Philip P. Patnode wrote:
   Torrie is doing what she needs to do in the face of the continuing
   bickering, deal making, personal agendas, ego-driven land grabs, and
  
  the
  
   subtle obstructionism shown by some members over the floorplan.
   
   In the face of complete chaos and a looming deadline, form a
  
  committee.
  
   Yes, I am serious.
   
   Following the philosophy of action as a do'ocracy, some motivated
  
  members
  
   should assemble to discuss the floorplan and make a final decision.
   
   Five people, with sharp pencils and blank paper, can sketch out a
   compromise floorplan in under an hour.  Add another half hour for
  
  coffee
  
   and revisions.
  
  This is an excellent idea. I think this could also be a wonderful
  experiment
  in an improved governance process for the space. Consensus is starting
  to fall
  apart.
  
  There was recently a large thread on noisebridge-discuss along the very
  same
  lines. I will look at their discussion and see what happened.
  
  I'm wholly in favor of such a committee producing a floorplan with this
  limited set of rules:
  
  * The floorplan is binding on The Community until March 2nd at 00:00
  * No significant modifications may be done to the floorplan after the
  floorplan is approved without majority approval from the committee
  members
  * Any committee member may declare a modification to be significant
  such that
  it is required to be approved by the committee
  * The floorplan shall not include anything that cannot be uninstalled,
  moved,
  disassembled, or otherwise modified over a two day weekend after March
  3rd
  without unaminous approval from the committee members
  * The committee is dissolved on March 2nd at 00:00
  * Additions to the committee shall not change without majority approval
  from
  the committee members or a Membership proposal
  * Committee discussion and voting is held on the build@ list
  * The SYNHAK Secretary is responsible for maintaining the committee
  membership
  roster
  * The roster and any other commitee records are made public to The
  Membership
  * Only Active Members in Good Standing are permitted to be a committee
  member
  * Committee members may resign at any time, only in writing to the
  committee
  
   After a decision has been made, print out a few copies to work from
  
  and
  
   start moving stuff into the designated areas.
   
   The members will take it from there, knowing that a final floorplan
  
  exists.
  
   If this doesn't sound like a workable solution, then just keep on
  
  bickering
  
   and squabbling about where to put things or who gets his way about
  
  this or
  
   that.
   
   Of course, the opening day celebration might have to be moved to
  
  August 1st
  
   if you keep up the noise level and refuse to cooperate with each
  
  other.
  
   Reminds me of 4th grade recess out on the parking lot...
   
   On Thu, Feb 6, 2014 at 9:47 AM, Torrie Fischer
  
  tdfisc...@hackerbots.netwrote:
On Thursday, February 06, 2014 01:41:59 Craig Bergdorf wrote:
 What if the EE lab and general meeting area were connected again
  
  in an
  
 L? Having the meeting area being the 

Re: [SH-Discuss] 2/13 at 6pm: Special meeting at Synhak to fill Knight Foundation Grant Proposal Form!

2014-02-06 Thread Andrew Buczko
We can ask for funds to pay contractors to do this stuff for us. (not to be
rude, but I already work 4 jobs)
Plus, it might get done quicker.




On Thu, Feb 6, 2014 at 6:32 PM, Omar Rassi omar.ra...@gmail.com wrote:

 Also, what I wrote are ideas, not actual items, unless they are actual
 things we're trying to accomplish then yes I concur.


 On Thu, Feb 6, 2014 at 6:30 PM, Omar Rassi omar.ra...@gmail.com wrote:

 I tried to answer some these questions real quick while holding a
 squirming baby on my lap at my laptop in the kitchen. What I wrote is in
 *ITALICS.*

- Does Synhak plan to use a fiscal agent? (if not, Knight recommends
Miami Foundation)
- Proposal for a project (*renovation of the building we occupy 48
South Summit Street*)
   - Total cost? $100,000 (*AKA Omar's purely arbitrary guesstimation
   based on previous conversations with other members*)
   - Requested from Knight?  *$100,000*
   - Over how many years? 2 (*spread out the work! we're all doing
   this in our spare time after all*)
   - Synhak's operating revenues $ *???* and expenses $ *???* for the
   current year and the end date of our fiscal year 
   - Attachments that would help Knight and they expect:
   - *Project Budget .. very important for completeness of form *(*Does
  the treasurer have this?)*
  - Existing funders (*Synhak Membership*)
  - Any major expenses/capital equipment we plan to purchase (*LASERS!
  ZAP! uhhh... shoring up the south wall, more roof/ceiling repair,
  re-finishing the Perkins room, ELECTRICAL ELECTRICAL ELECTRICAL, 
 plumbing*
  )
   - Proposal Narrative (few paragraphs per each of the following):
1. Purpose of grant in one short sentence, *In order to create a more
   perfect hackerspace, we wish to renovate and improve the building 
 occupied
   by said hackerspace.*
   2. What is the project, *Project Edify*
   3. List key activities and the timetable, including the grant
   start and end dates *???*
   4. Why is this a fit for Knight Foundation? *???*
  1. Explain how you will intentionally engage the community,
  improve or provide access to information flow, and address the Akron
  strategy of engaging and retaining the next generation of talent. 
 *See
  www.synhak.org http://www.synhak.org*
   5. What are our outcomes?
  1. *Laser cutter!*
  2. *Safer more energy efficient building*
  3. *attract more members with a more attractive infrastructure*
   6. Measuring success?
  1. List the metrics that we will use to track the success of
  our outcomes *BUZZWORDS*



 On Thu, Feb 6, 2014 at 5:52 PM, gs volt gsvo...@gmail.com wrote:

 Greetings,

 Knight Foundation has emailed me a Grant Proposal Form.

 About Knight Foundation:

 Knight Foundation focuses on projects that promote informed and engaged
 communities. In Akron, we are supporting talent attraction and retention
 necessary to build a 21st century economy.


 This Grant Proposal Form form is used to evaluate whether Knight
 supports an organization's work. In this form, I plan to declare to Knight
 what we need help with.

 Ofcourse, I need help with coming up with what we need help with :)

 I'm planning to meet in person with anyone interested in helping with
 filling this form on Thu Feb 13th at 6pm at our new location at 48 S Summit
 St for a discussion.

 Until then, here are the important things in the form that we can all
 individually think about responses to (mostly a plaintext copy paste of
 things in the form that I thought were important):

- Does Synhak plan to use a fiscal agent? (if not, Knight recommends
Miami Foundation)
- Proposal for a project
   - Total cost? $
   - Requested from Knight?  $
   - Over how many years?
   - Synhak's operating revenues $ ... and expenses $... for the
   current year and the end date of our fiscal year 
   - Attachments that would help Knight and they expect:
  - *Project Budget .. very important for completeness of form*
  - Existing funders
  - Any major expenses/capital equipment we plan to purchase
   - Proposal Narrative (few paragraphs per each of the following):
   1. Purpose of grant in one short sentence
   2. What is the project
   3. List key activities and the timetable, including the grant
   start and end dates
   4. Why is this a fit for Knight Foundation?
  1. Explain how you will intentionally engage the community,
  improve or provide access to information flow, and address the 
 Akron
  strategy of engaging and retaining the next generation of talent.
   5. What are our outcomes?
  1. Indicate 2 or 3 concrete changes you would like to see in
  place at the end of your grant period
   6. Measuring success?
  1. 

Re: [SH-Discuss] another zoning proposal

2014-02-06 Thread Andrew Buczko
I will like to be on the committee.
I can be there Monday.
And my membership is in good standing.

Andy




On Thu, Feb 6, 2014 at 8:48 PM, degerov...@yahoo.com wrote:

 I will be available monday afternoon as well.


   --
  *From:* Torrie Fischer tdfisc...@hackerbots.net

 *To:* SYN/HAK discussion list discuss@synhak.org
 *Sent:* Thursday, February 6, 2014 5:09 PM
 *Subject:* Re: [SH-Discuss] another zoning proposal

 On Thursday, February 06, 2014 16:12:00 Craig Bergdorf wrote:
  I'll happily draw it up as it's being discussed. I am also busy with
  SparkAK this weekend, what about tonight at 8? If not, then how about
  Monday?

 Monday works. Lets do Monday. I'll be there after 6 PM for more painting,
 so
 can we get a committee working by 8PM?

 We don't need to decide today of course. I'm busy with SparkAK all weekend
 but
 I'll have e-mail of course.

 
  On Thu, Feb 6, 2014 at 4:02 PM, Craig Bergdorf mm1...@gmail.com wrote:
   Right here for #5
  
   On Feb 6, 2014 2:58 PM, Philip P. Patnode ppatn...@gmail.com
 wrote:
   So, who is going to be #5?
  
   Torrie @ 1324
  
   Becca @ 1407
  
   Justin @ 1408
  
   Devin @ 1440
  
   #5 @ ?
  
   Good to see that some of the members are interested and motivated to
 get
   the new floorplan finalized.
  
  
  
  
   On Thu, Feb 6, 2014 at 2:40 PM, degerov...@yahoo.com 
  
   degerov...@yahoo.com wrote:
   I volunteer myself for the committee. Can we meet tomorrow at 7pm at
 the
   space?
  
   Devin.
  
   Sent from Yahoo Mail on
   Androidhttp://overview.mail.yahoo.com/mobile/?.src=Android
--
  
   * From: * Becca Salchak blsalc...@yahoo.com;
   * To: * SYN/HAK discussion list discuss@synhak.org;
   * Subject: * Re: [SH-Discuss] another zoning proposal
   * Sent: * Thu, Feb 6, 2014 7:07:38 PM
  
Id like to volunteer myself for the committee
  
   On Feb 6, 2014 1:24 PM, Torrie Fischer tdfisc...@hackerbots.net
  
   wrote:
   On Thursday, February 06, 2014 12:31:45 Philip P. Patnode wrote:
Torrie is doing what she needs to do in the face of the continuing
bickering, deal making, personal agendas, ego-driven land grabs,
 and
  
   the
  
subtle obstructionism shown by some members over the floorplan.
   
In the face of complete chaos and a looming deadline, form a
  
   committee.
  
Yes, I am serious.
   
Following the philosophy of action as a do'ocracy, some
 motivated
  
   members
  
should assemble to discuss the floorplan and make a final
 decision.
   
Five people, with sharp pencils and blank paper, can sketch out a
compromise floorplan in under an hour.  Add another half hour for
  
   coffee
  
and revisions.
  
   This is an excellent idea. I think this could also be a wonderful
   experiment
   in an improved governance process for the space. Consensus is
 starting
   to fall
   apart.
  
   There was recently a large thread on noisebridge-discuss along the
 very
   same
   lines. I will look at their discussion and see what happened.
  
   I'm wholly in favor of such a committee producing a floorplan with
 this
   limited set of rules:
  
   * The floorplan is binding on The Community until March 2nd at 00:00
   * No significant modifications may be done to the floorplan after
 the
   floorplan is approved without majority approval from the committee
   members
   * Any committee member may declare a modification to be significant
   such that
   it is required to be approved by the committee
   * The floorplan shall not include anything that cannot be
 uninstalled,
   moved,
   disassembled, or otherwise modified over a two day weekend after
 March
   3rd
   without unaminous approval from the committee members
   * The committee is dissolved on March 2nd at 00:00
   * Additions to the committee shall not change without majority
 approval
   from
   the committee members or a Membership proposal
   * Committee discussion and voting is held on the build@ list
   * The SYNHAK Secretary is responsible for maintaining the committee
   membership
   roster
   * The roster and any other commitee records are made public to The
   Membership
   * Only Active Members in Good Standing are permitted to be a
 committee
   member
   * Committee members may resign at any time, only in writing to the
   committee
  
After a decision has been made, print out a few copies to work
 from
  
   and
  
start moving stuff into the designated areas.
   
The members will take it from there, knowing that a final
 floorplan
  
   exists.
  
If this doesn't sound like a workable solution, then just keep on
  
   bickering
  
and squabbling about where to put things or who gets his way about
  
   this or
  
that.
   
Of course, the opening day celebration might have to be moved to
  
   August 1st
  
if you keep up the noise level and refuse to cooperate with each
  
   other.
  
Reminds me of 4th grade recess out on the