It cost me about $1.00 in materials to build a switch on PC ties. Most of that 
went for rail. Two pieces of 3' lenght rail will be enought to build a switch & 
some PC ties.You will need a 40 watt soldering iron, Liquid resin solder flux, 
resin cored solder(0.032" Dia) and a pattern. You can make your own patten with 
a peice of flex track, carbon paper and typing paper(20lb bond).
 
The rest of you can spend $20.00 or more for track switches that do not fit 
your space requirement if you want. Myself I will build mine for about a 
dollar. Oh yes, My switches fit my space requirements. I have been building 
switches sence 1968 on PC ties without a fast track jig.
 
Paul

--- On Mon, 8/2/10, Ed <[email protected]> wrote:


From: Ed <[email protected]>
Subject: {S-Scale List} Fast tracks....
To: [email protected]
Date: Monday, August 2, 2010, 11:06 AM


Am considering hand laying my own track to save money and for bragging rights. 
I was wondering if anyone has done a calculation of the cost to build per 
turnout once you have the Fast Tracks tools and building jig. 

Any thoughts on this would be greatly appreciated....



      

[Non-text portions of this message have been removed]



------------------------------------

Yahoo! Groups Links

<*> To visit your group on the web, go to:
    http://groups.yahoo.com/group/S-Scale/

<*> Your email settings:
    Individual Email | Traditional

<*> To change settings online go to:
    http://groups.yahoo.com/group/S-Scale/join
    (Yahoo! ID required)

<*> To change settings via email:
    [email protected] 
    [email protected]

<*> To unsubscribe from this group, send an email to:
    [email protected]

<*> Your use of Yahoo! Groups is subject to:
    http://docs.yahoo.com/info/terms/

Reply via email to