[Axapta-Knowledge-Village] User Status - Ending-Blocked

2010-02-07 Thread Tushar Joshi
Hello,
 
We have a setup of AX2009 in 63 locations. These locations are accessing the 
application using CITRIX connectivity. Most of the times the Sales related 
users get their status as Ending-Blocked this was not happening earlier but 
suddenly this started happening and sesion gets hang in user machine. Can 
anyone tell the reason why this status comes frequently??
 
I have tried searching for the status which says - The administrator has 
clicked End sessions to end the session and the AOS has processed the request, 
but there is a problem disconnecting the session. but this did not solve my 
issue!
 
-Tushar


  The INTERNET now has a personality. YOURS! See your Yahoo! Homepage. 
http://in.yahoo.com/

[Axapta-Knowledge-Village] Error while updating item dimension combinations through a job

2010-02-07 Thread Tushar Joshi
Hi,
 
I have around 2500 numbers of configurations(inventory dimension) for the BOM 
item. And there are 1600 such BOM items i want to create a SIZE (inv dimension) 
for each of the item. The Item master setup has Auto create combinations 
option marked. So when i try to create a Size manually through Item details  
setup button  Size option then it takes around 50 mins for the record to be 
updated.(This is regarding the performance of AX2009 as 2500 recorss in 
Configtable shudnt be a problem for AX?
 
To avoid this time we tried running a job which validates whether the same size 
id exists for the item or not and then creates a record in Size. Still when i 
try to compare the time it took same i.e. 50 mins, also some time when the job 
is getting executed i got following error in between when the job is about to 
complete Can not create a record in NumberSequenceTracking (Number Sequence 
Tracking) the SQL database has issued an error(). Unable to establish the 
connection with the database.
 
Can anyone help in this reagrd?
 
-Tushar


  The INTERNET now has a personality. YOURS! See your Yahoo! Homepage. 
http://in.yahoo.com/

Re: [Axapta-Knowledge-Village] Report as Finished for more quantity

2010-01-24 Thread Tushar Joshi
I meant by following scenario in Purchase order, If i create a PO for 100 and 
allow the overdelivery of 10% the i can receive 110 while doing packing slip, 
similarly can we start production for 100 and Report As Fisnish 110?? I know 
the on order quantity is 100 in this case but there is method in ProdTable for 
Overdelivery which i think should allow more quantity while Report As Finish. 
Please let me konw any setup is missing in inventory parameters
 
-Tushar
 


--- On Sat, 23/1/10, rayd shil@gmail.com wrote:


From: rayd shil@gmail.com
Subject: Re: [Axapta-Knowledge-Village] Report as Finished for more quantity
To: Axapta-Knowledge-Village@yahoogroups.com
Date: Saturday, 23 January, 2010, 10:43 PM


  




this is an standard error which comes when try to post something for which an 
order never existed, for example - there is no purchase order but u are trying 
to receive, or for that matter, there is no sales order but u are trying to 
ship :)
 
i guess it is more of an investigation of the problem rather than 
customization, because there is something missing in the transaction. I may 
help you with this if you could attach screen shots of steps u are performing 
capturing the on-hand and transaction screens in it.
 
regards
-D


On Sat, Jan 23, 2010 at 8:13 PM, Tushar Joshi tushar_s_joshi@ yahoo.co. in 
wrote:


  








I have tried with Accept error option but still not accepting more quantity. 
Can we customize this acceptance of more qty by using the overdelivery concept 
of purchase orders?
 
-Tushar

--- On Mon, 18/1/10, rayd shil@gmail. com wrote:


From: rayd shil@gmail. com
Subject: Re: [Axapta-Knowledge- Village] Report as Finished for more quantity
To: Axapta-Knowledge- vill...@yahoogro ups.com
Date: Monday, 18 January, 2010, 11:20 PM 



  

Hi Tushar
have u tried using 'accept error' check box, because originally ur production 
order started with 100, so ur ordered status was 100 initially but since u are 
attempting to post production for 102, system is not considering order status 
as 'ordered' for '2' quantity (which was originally not ordered). Accept error 
check box is given for tackling reporting as finished in such situations.

rgds
-D


On Mon, Jan 18, 2010 at 7:59 PM, Tushar Joshi tushar_s_joshi@ yahoo.co. in 
wrote:


  








Dear All,
 
I have a following scenario in a process industry
 
Item A has production order for 100 Qty
Production order started for 100
Picking list posted for 100
Route card posted for 100
But while doing Report as finished I actually observed that I have produced 102 
qty, and want to update the stock for the same quantity
While doing so when i update the Report as finish journal for 102 quantity AX 
gives error as Cannot receive quantity 102 because inventory transactions with 
status Ordered, Arrived or Registered are insufficient.
 
Can anyone suggest how to handle such scenario?
 
-Tushar


The INTERNET now has a personality. YOURS! See your Yahoo! Homepage. 





The INTERNET now has a personality. YOURS! See your Yahoo! Homepage.










  The INTERNET now has a personality. YOURS! See your Yahoo! Homepage. 
http://in.yahoo.com/

Re: [Axapta-Knowledge-Village] Report as Finished for more quantity

2010-01-23 Thread Tushar Joshi
I have tried with Accept error option but still not accepting more quantity. 
Can we customize this acceptance of more qty by using the overdelivery concept 
of purchase orders?
 
-Tushar

--- On Mon, 18/1/10, rayd shil@gmail.com wrote:


From: rayd shil@gmail.com
Subject: Re: [Axapta-Knowledge-Village] Report as Finished for more quantity
To: Axapta-Knowledge-Village@yahoogroups.com
Date: Monday, 18 January, 2010, 11:20 PM


  



Hi Tushar
have u tried using 'accept error' check box, because originally ur production 
order started with 100, so ur ordered status was 100 initially but since u are 
attempting to post production for 102, system is not considering order status 
as 'ordered' for '2' quantity (which was originally not ordered). Accept error 
check box is given for tackling reporting as finished in such situations.

rgds
-D


On Mon, Jan 18, 2010 at 7:59 PM, Tushar Joshi tushar_s_joshi@ yahoo.co. in 
wrote:


  








Dear All,
 
I have a following scenario in a process industry
 
Item A has production order for 100 Qty
Production order started for 100
Picking list posted for 100
Route card posted for 100
But while doing Report as finished I actually observed that I have produced 102 
qty, and want to update the stock for the same quantity
While doing so when i update the Report as finish journal for 102 quantity AX 
gives error as Cannot receive quantity 102 because inventory transactions with 
status Ordered, Arrived or Registered are insufficient.
 
Can anyone suggest how to handle such scenario?
 
-Tushar


The INTERNET now has a personality. YOURS! See your Yahoo! Homepage. 









  The INTERNET now has a personality. YOURS! See your Yahoo! Homepage. 
http://in.yahoo.com/

[Axapta-Knowledge-Village] Item dimension wise cost in movement journals

2010-01-18 Thread Tushar Joshi
Hello friends,
 
We are using the configuration and size dimensios for BOM type of items. The 
inventory model group selected has setup of weighted average cost for all BOM 
type of items.
 
When trying to post a movement journal of any BOM type of item with specific 
configuration and size the cost of the item (weighted average) is not shown in 
cost column of the journal. The item has the setup in its master as use 
combination cost price but still the dimension combination cost price is not 
shown in inventory journals.
 
Any setup missing for this? pls suggest
 
-Tushar


  The INTERNET now has a personality. YOURS! See your Yahoo! Homepage. 
http://in.yahoo.com/

[Axapta-Knowledge-Village] Report as Finished for more quantity

2010-01-18 Thread Tushar Joshi
Dear All,
 
I have a following scenario in a process industry
 
Item A has production order for 100 Qty
Production order started for 100
Picking list posted for 100
Route card posted for 100
But while doing Report as finished I actually observed that I have produced 102 
qty, and want to update the stock for the same quantity
While doing so when i update the Report as finish journal for 102 quantity AX 
gives error as Cannot receive quantity 102 because inventory transactions with 
status Ordered, Arrived or Registered are insufficient.
 
Can anyone suggest how to handle such scenario?
 
-Tushar


  The INTERNET now has a personality. YOURS! See your Yahoo! Homepage. 
http://in.yahoo.com/

[Axapta-Knowledge-Village] Re: [development-axapta] Track by Serial Number.

2009-12-10 Thread Tushar Joshi
Khalil,
 
U can use the serial number dimension of the item for this requirement. 
Servicing of valve is similar to the scenario of material coming IN to your 
inventory so treat theat as purchase orders as and when you receive the item 
for servicing and after doing the observations you can send it to the person 
from whom u received it. At the time of purchase transaction you can generate 
the serial number for the item by doing setups of serial number groups and then 
sending the item back to the person can be done as a sale transaction by which 
you can keep a trace of the items through serial numbers also the sale 
transaction will help u in billing the servicing charges to ur customers.
 
Hope this helps!
 
-Tushar

--- On Wed, 2/12/09, Khalil Rehman khalilrehm...@hotmail.com wrote:


From: Khalil Rehman khalilrehm...@hotmail.com
Subject: [development-axapta] Track by Serial Number.
To: Knowlege Village axapta-knowledge-village@yahoogroups.com, AX 
Consultant Group axapta-consult...@yahoogroups.com, Development Axapta 
development-axa...@yahoogroups.com
Date: Wednesday, 2 December, 2009, 6:06 PM



Dear All,



   i have requirements in Servicing Enviroment as follows:



Example 1:



    we receive one Valve for repairing  Servicing. now first of all we inspect 
the valve and make observation list. after that we want to have tracking from 
material consumed upto invoicing.



   also we want to keep history of this valves by Serial Number which we need 
to review time to time.



best regards.



  KHALIL UR REHMAN  


              
_
Windows Live: Make it easier for your friends to see what you’re up to on 
Facebook.
http://www.microsoft.com/middleeast/windows/windowslive/see-it-in-action/social-network-basics.aspx?ocid=PID23461::T:WLMTAGL:ON:WL:en-xm:SI_SB_2:092009

[Non-text portions of this message have been removed]





Yahoo! Groups Links






  The INTERNET now has a personality. YOURS! See your Yahoo! Homepage. 
http://in.yahoo.com/

[Axapta-Knowledge-Village] SySDatabaseTransDelete

2009-10-25 Thread Tushar Joshi
All,
 
I am trying to delete the transactions from the AX server(using AX 2009 
Sp1) and for that i used the SysDatabaseTransDelete class, surprisingly this 
class is running since last 5 days! System still shows me Deleting 
Transactions... Can anyone tell me what could be the reason 
for this delay??
 
-Tushar


  Try the new Yahoo! India Homepage. Click here. http://in.yahoo.com/trynew

[Axapta-Knowledge-Village] Record Level securities

2009-10-25 Thread Tushar Joshi
Hi All,
 
We have AX implemented at a FACTORY and the connectivity from the server is to 
60+ SHOWROOMS through citrix server. The showrooms are treated as Warehouses in 
AX and for each warehouse there is record level securoty set so that users in 
showrooms will have limited access to specific customers, number sequences to 
generate Sales orders, specific items etc a ll 60 users are having 
restricted access through Record level securities. Can setting up the record 
level securities in large number affects the system performance?? assuming that 
the current record count of Data is  5 million??
 
If yes can anyone suggest how the users in different locations can be handled 
to have limited or restricted access??
 
-Tushar 


  Connect more, do more and share more with Yahoo! India Mail. Learn more. 
http://in.overview.mail.yahoo.com/

[Axapta-Knowledge-Village] Coverage plan by Dimesnion - query

2009-10-25 Thread Tushar Joshi
All,
 
When Item dimensions are set Active, the by default the system sets them active 
for Primary stocking, Mandatory, physical inventory, financial 
inventory, and coverage plan by dimension criterias.
 
I have Sales orders eneterd for an item with Configuration and Size dimensions 
active. when Master scheduling is run then items with same configuration and 
size are grouped and system generates the planned order for the grouped 
quantity. I want to group the requirements at the time of master planning which 
will consider only Item code and Configuration and NO SIZE... if I remove the 
coverage plan by dimension for SIZE dimension then system will group the item 
requirements only based on the item code and configuration but will it affect 
the sales or production or purchase transactions of the Item???
 
-Tushar


  From cricket scores to your friends. Try the Yahoo! India Homepage! 
http://in.yahoo.com/trynew

[Axapta-Knowledge-Village] Multiple work centers for 1 Route

2009-10-11 Thread Tushar Joshi
Hi All,
 
Item of type BOM has a ROUTE defined for it which sets the sequence of the 
tasks to be performed to manufacture a finished product. In every route a work 
center group or a work center can be attached for one operation.
 
But Is it possible to create a route where one operation will have more than 
one work centers assigned to it?? Also is it possible to define a priority of 
utilization of the work center?
 
Example - Item BOM has a route R1 defined for it. In Operations the Op1 is 
performed on M/c 1 but at the same time it can also be done on M/c 2 and M/c 3 
so I want tos et these 3 machines for one operation and also want to define the 
priority that which work center should be used first (during production 
scheduling or work center capacity reservations) if all 3 are available.
 
I am aware that in Std AX 2009 we can not assign more than 1 work centers for 
an operation, but is it possible to customize it? will it affect the core 
functionality of AX?
 
Your suggestions will be of gr8 help!
 
-Tushar


  Now, send attachments up to 25MB with Yahoo! India Mail. Learn how. 
http://in.overview.mail.yahoo.com/photos

Re: [Axapta-Knowledge-Village] Importing Exporting BOM [1 Attachment]

2009-10-06 Thread Tushar Joshi
Hello,
 
If u want to export the BOM data in Excel then u will have to follow following 
steps (this is one of the available options though)
 
Administration  Periodic  Data export/import  Excel spreadsheet  Template 
wizard
 
Then specify a file name in which u want to export the data. Select the Tables 
BOM, BOMTable, and BOMVersion from the list. proceed till export data option. 
Click Ëxport data option and it will export the data to ur workbook.
 
Similarly If u want to import excel BOM data to AX then go to Administration  
Periodic  Data export/import  Excel spreadsheet  Microsoft office excel 
import
 
Select the definition group if u have selected while exporting the data to 
templates or u can leave it blank if not created the definition group while 
exporting. Select the file name in which u have entered the BOM and its related 
components and click OK the data will be imported in AX.
 
Hope this will help u. A sample Template is attached.
 
-Tushar

--- On Mon, 5/10/09, Belal Marzouk belal_marz...@yahoo.com wrote:


From: Belal Marzouk belal_marz...@yahoo.com
Subject: [Axapta-Knowledge-Village] Importing  Exporting BOM
To: Axapta-Knowledge-Village@yahoogroups.com
Date: Monday, 5 October, 2009, 10:37 PM


  





Hello,
 
How can I export and import BOM including its components? How can I import them 
too?
 
Regards,
 
Belal
















  Now, send attachments up to 25MB with Yahoo! India Mail. Learn how. 
http://in.overview.mail.yahoo.com/photos

Re: [Axapta-Knowledge-Village] Reg attaching ten documents in a new tab

2009-09-27 Thread Tushar Joshi
Hello,
 
Instead of attaching the documents in a new tab (for which you will have to do 
some customization) you can use document handling feature of AX and in that you 
can attach as many documents as you want for a single Item in your purchase 
order. You can view them at any point of time by selecting the proper item in 
purchase line and click the Document Handling button on toolbar.
 
Hope this will address your purpose of maintaining documents for a single 
record.
 
-Tushar

--- On Fri, 25/9/09, trinadh sura trinadh_s...@iicindia.com wrote:


From: trinadh sura trinadh_s...@iicindia.com
Subject: [Axapta-Knowledge-Village] Reg attaching ten documents in a new tab
To: Axapta-Knowledge-Village@yahoogroups.com, development-axa...@yahoogroups.com
Date: Friday, 25 September, 2009, 6:34 PM


  





Hi all,
In a purchase order for single record I want to attach ten documents in a new 
tab.
Please can any explain or else send if any suggestions.
 
Best Regards,
Trinadh sura
Technical Consultant
9246198102.
 















  From cricket scores to your friends. Try the Yahoo! India Homepage! 
http://in.yahoo.com/trynew

Re: [Axapta-Knowledge-Village] Import purchase invoice create credit note

2009-08-05 Thread Tushar Joshi
Standard Ax 4.0SP2 does not allow to create credit note for import order. While 
creating a line it checks(PurchLine table - CreateLine method) that if the PO 
type is of Import and it has Bill of entry transaction against it then does not 
allow to create credit note line.
 
If you want to create it then you can create a NEW purchase order of type 
IMPORT against the same vendor and same item with -ve quantity. Process the 
purchase order and at the time of posting invoice it prints the Credit note 
report. Hope it solves your purpose.
 
-Tushar

--- On Wed, 5/8/09, NITIN DESALE nitindes...@yahoo.co.in wrote:


From: NITIN DESALE nitindes...@yahoo.co.in
Subject: Re: [Axapta-Knowledge-Village] Import purchase invoice create credit 
note
To: Axapta-Knowledge-Village@yahoogroups.com
Date: Wednesday, 5 August, 2009, 8:32 AM


  








Dear all,
 
is it possible or not,any idea ?
purchase order create credit note not allowed for import only.

--- On Sat, 1/8/09, NITIN DESALE nitindesale@ yahoo.co. in wrote:


From: NITIN DESALE nitindesale@ yahoo.co. in
Subject: [Axapta-Knowledge- Village] Import purchase invoice create credit note
To: Axapta Knowledge Axapta-Knowledge- vill...@yahoogro ups..com
Date: Saturday, 1 August, 2009, 12:04 PM


  






Hi all,
 
i'm facing problem at the time of create credit note for import purchase order 
in Ax 4.0,
for domestic purchase invoice system allowed to carete credit note but not for 
Import invoice. it throwing an error.
 
Message (11:31:08)
Purchase order is updated in invoice registration, changes cannot be made.
Illegal inventory transaction

if anyone have solution pls let me know the same.
Thanks
Nitin
 


Yahoo! recommends that you upgrade to the new and safer Internet Explorer 8. 



Looking for local information? Find it on Yahoo! Local
















  Looking for local information? Find it on Yahoo! Local 
http://in.local.yahoo.com/

Re: [Axapta-Knowledge-Village] ERROR at the time of Credit note

2009-08-05 Thread Tushar Joshi
Nitin,
 
We(partner) had explained the cause of this error and simulated the scenario. 
You(client) should follow the best industry practices while doing transactions 
and using a global business solution package. Please make sure you follow it in 
future.
 
-Tushar

--- On Sat, 1/8/09, NITIN DESALE nitindes...@yahoo.co.in wrote:


From: NITIN DESALE nitindes...@yahoo.co.in
Subject: [Axapta-Knowledge-Village] ERROR at the time of Credit note
To: Axapta Knowledge Axapta-Knowledge-Village@yahoogroups.com
Date: Saturday, 1 August, 2009, 8:57 AM


  








Hi,
 
For some purchase order we are facing problem at the time of creditnote creation
AP--Function --Create Credit Note--select the particulal invoice number.
 
its throwing an error  Item has automatic serial number alocation.
 
we(client) and our implementaion partner are facing to this error from last one 
and half month , if anybody has solution pls let me know the same.
 
Thanks
Nitin Desle (Pune,MH)
 
Nitin Desle


See the Web's breaking stories, chosen by people like you. Check out Yahoo! 
Buzz.
















  Love Cricket? Check out live scores, photos, video highlights and more. 
Click here http://cricket.yahoo.com

[Axapta-Knowledge-Village] Updating Serial numbers for On-Hand inventory

2009-07-27 Thread Tushar Joshi
Hi All,
 
We have implemented Ax 4.0 SP2 IND_LOC in a manufacturing industry. The 
inventory was getting updated with only WAREHOUSE dimension. But now the 
requirement is to update the inventory with serial numbers dimension so that 
Store person can maintain the FIFO. For items having no transaction, the 
inventory dimension group got changed and it creates serial numbers perfectly 
but for the items having ON-HAND stock its difficult to assign the serial 
number. For Example
 
Item A on hand stock 100, Ordered 200, these records were not updated with 
serial number dimension, but now i want to update on hand 100 qty with serial 
number say S1 and whenever i will receive a material through purchase 
packing slip it shoud take the next serial number as S2. Is it possible to 
acieve this?
 
Can anyone provide a script job?


  Yahoo! recommends that you upgrade to the new and safer Internet Explorer 
8. http://downloads.yahoo.com/in/internetexplorer/

Re: [Axapta-Knowledge-Village] Alternative workcenter with different process time

2009-06-04 Thread Tushar Joshi
Hi,

U can create 3 diferent route versions for the same item and then while running 
the master planning u can select the option of route versions or while 
updating the status of production order u can select the appropriate route out 
of the 3 versions and can see the different process times as per the route 
selected in capacity reservations. Hope this will help. 

-Tushar

--- On Wed, 3/6/09, cüneyt köker c_ko...@yahoo.com wrote:

From: cüneyt köker c_ko...@yahoo.com
Subject: [Axapta-Knowledge-Village] Alternative workcenter with different 
process time
To: Axapta-Knowledge-Village@yahoogroups.com
Date: Wednesday, 3 June, 2009, 1:03 PM
















  
  

Hi All,
 
Is there any way to set up the following case in AX?
  
A specific product can be produced on Machine1 (10 min/pcs), Machine2 (15 
min/pcs) and Machine3 (8 min/pcs) with different process times. Machine1 is 
selected as work center on the route operation. I want to make AX consider 
other two machines too if they are available when scheduling. And when doing 
this, it must consider their different process times and schedule them that way.
  
I know that task groups are used for similar purpose but it is not possible to 
define different times by machine there.
 
 
Thank you in advance,
 
Cuneyt


  
 

  




 

















  Bring your gang together. Do your thing. Find your favourite Yahoo! group 
at http://in.promos.yahoo.com/groups/

[Axapta-Knowledge-Village] Partial star for Production order doesn't work!

2009-05-15 Thread Tushar Joshi
Hi All,
 
One of our prospect is into batch production processes. For Example they crate 
a Production order for 1000 qty but they start the production in batches like 
250 in 1st week 500 in 2nd week, etc... depending on their work center's 
availability and customer's requirement.
 
In Ax when we create a production order for 1000 qty and try to start it 
partially say for 200 qty then intitially it will work fine till Report as 
Finish but when second time we start it for say 500qty then picking list 
journal doesn't get updated for it (not in terms of proposal qty but for 
started qty) also while doing the Report as Finish for the second time started 
qty it throws an error as Report as finish qty exceeds the started qty. 
Require some assistance in addressing this issue!


  Bring your gang together. Do your thing. Find your favourite Yahoo! group 
at http://in.promos.yahoo.com/groups/

[Axapta-Knowledge-Village] Barcode Scanning FIFO

2009-05-08 Thread Tushar Joshi
Hello All,
 
We want to introduce the Barcode scanning functionality to our client. I want 
to use SERIAL NUMBER or BATCH NUMBER dimension to scan the Barcode and maintain 
the FIFO in my inventory. Can anyone suggest how both of these or any one of 
these dimensions can be used for Barcode scanning and maintaining FIFO?
 
Does anyone have a doc or spec prepared for the same from their respective 
prior experiences? it will be of gr8 help!
 
Thanks in advance
 
-Tushar


  Cricket on your mind? Visit the ultimate cricket website. Enter 
http://beta.cricket.yahoo.com

Re: [Axapta-Knowledge-Village] Material Issuance Consumption

2009-03-10 Thread Tushar Joshi
Material is issued against a production order. While updating the status of 
production order to started you have an option to create and post PICKING 
LIST. its nothing but the material issue against the production. the stock gets 
reduced from inventory warehouse when the picking list is posted. It has two 
columns as proposal and consumption which records the consumption of the 
picked material. after picking the material from inventory againsta production 
order you need to post the Route card which also gets generated automatically 
if the end mark route option is checked while starting the production order 
(on general tab). Report as finished Journal will update the stock of the 
finshed goods in warehouse.

--- On Mon, 9/3/09, Axapta Consultant consultant.axa...@yahoo.com wrote:


From: Axapta Consultant consultant.axa...@yahoo.com
Subject: [Axapta-Knowledge-Village] Material Issuance  Consumption
To: Axapta Knowledge Village axapta-knowledge-village@yahoogroups.com
Date: Monday, 9 March, 2009, 2:41 PM








How the material is issued against Production Order,how its consumption is 
recorded in AX and how the finished goods are recived in the warehouse.
 
 
















  Unlimited freedom, unlimited storage. Get it now, on 
http://help.yahoo.com/l/in/yahoo/mail/yahoomail/tools/tools-08.html/

[Axapta-Knowledge-Village] Document Handling!

2009-02-09 Thread Tushar Joshi
Hello All,
 
I am facing a problem in accessing the files which are attached to the Item. 
for example -  In Item master form I selected an Item A and have attached an 
image of its drawings of type file to it. 
 
The Document management setups in Basic module are as follows:
Document type File is created in the list.
Setup in General tab has file location as Archive directory and File location 
is \\server\folder1 (which is a network shared folder). In Parameters also the 
same path is mentioned for the Archive directory. 
 
Even after all these setups I am not able see the attached image file for the 
item from other machine. The other machine from which i try to access this file 
throws an error that c:\Temp\file1.jpg does not exists. 
 
I have changed the archive directory path on that machine also and kept it as 
\\server\folder1 which is same as that of the former machine from which i had 
attached the file still the problem persists
 
Can anyone suggest how can we achieve this? Do we need to change some setups?
 
-Tushar


  Add more friends to your messenger and enjoy! Go to 
http://messenger.yahoo.com/invite/

[Axapta-Knowledge-Village] Security Rights Problem

2009-01-02 Thread Tushar Joshi
All,
 
I am trying to set access rights for a user group. while setting up the 
permissions for viewing Security of Inventory management module, I want to 
assign View option to Tables section. It worked fine for me. I can only view 
the records in Inventory module on Item master form. But If i try to click on 
Sales Order menu on navigation pane then it throws an error as Not Enough 
Rights to Access Inventory Dimension table (InventDim)
 
I checked for this particular table and the rights assigned to it are View, 
but under the Tables option if I select Inventory Dimensions table then 
fields/fields group under it are having no values for the Access option (I mean 
none of the 5 options no access/view/edit/create/full control are selected) and 
even if i try to assign any value say for e.g. View then it does not get 
Saved
 
has anyone done security rights setup??
 
-Tushar


  Connect with friends all over the world. Get Yahoo! India Messenger at 
http://in.messenger.yahoo.com/?wm=n/

Re: [Axapta-Knowledge-Village] AX Error

2008-12-07 Thread Tushar Joshi
Yes Naeem,
 
You r right! if this eror occurs again then please do the synchronization in 
Administration  periodic  SQL administration  Table actions button  
synchronize option. System table some times need to be synchronized with SQL 
database.

--- On Wed, 3/12/08, Naeem Sarwar [EMAIL PROTECTED] wrote:

From: Naeem Sarwar [EMAIL PROTECTED]
Subject: Re: [Axapta-Knowledge-Village] AX Error
To: Axapta-Knowledge-Village@yahoogroups.com
Date: Wednesday, 3 December, 2008, 4:08 PM







I synchronized the system  it solved the problem.  Bank accounts were required 
to be reconfigured!



On Wed, Dec 3, 2008 at 12:13 AM, MaryAnn Hand maryann.hand@ gmail.com wrote:






If the number sequence is ok, then there must be some customization
which is wiping out the journal number for the records that give
errors. I guess it is something you need to have a developer check by
debugging.


On Tue, Dec 2, 2008 at 12:06 PM, Naeem Sarwar mnaeemsarwar@ gmail.com wrote:
 the numbers are being generated. for JV and lines it wont give error while
 entering the data but during validation and posting.

 do you think i still needs to check it... we haven't changed anything is
 system the only thing changed it re-installation of AOS


 On Tue, Dec 2, 2008 at 7:38 PM, MaryAnn Hand maryann.hand@ gmail.com wrote:

 The error indicates that there is no journal number. Run the Number
 sequence wizard - you need to have journal numbers to post!

 On Tue, Dec 2, 2008 at 10:48 AM, Naeem Sarwar mnaeemsarwar@ gmail.com
 wrote:
  We are facing the attached error and the scenario is given below
 
  The windows of AOS was crashed, we recovered the axapta installation
  directory.
  Reinstalled the windows with same name.
  Reinstalled axapta with same AOS names mapping with existing database.
  (over
  written the AX folder)
  Now clients are able to connect with DB creation/deletion/ editing of SO
  and
  PO is OK.
  But when you validate and post Journal lines it returns attached error.
 
  Thanks
  Naeem
 
 
 
 
 

 

 














  Add more friends to your messenger and enjoy! Go to 
http://messenger.yahoo.com/invite/

RE: [Axapta-Knowledge-Village] Re: Grouping of production orders for planning

2008-12-07 Thread Tushar Joshi
Hello James,
 
What i understood from below communication is You want to group the production 
orders( for diff Items/FG) which are generated with a reference of same Sales 
Order. And if the Scheduling date is changed because of any material constraint 
then the changed date should be applicable to all related Production orders.
 
Say 1 Customer has a Sales Order created in Ax with 10 Lines for different 
items. Then you want to start these production orders (for all 10 FG/Items) on 
a same date. But in actual scenario it will not possible as the components of 
these 10 FG items may have a different purchase lead time. so all the orders 
can not be started together. Ax will give you the start date considering the 
On-hand inventory and Open inventory transactions for the items. Also there 
might be a case in which one of the 10 Fg items have a Sub-Bom in it and 
without manufacturing that sub-bom you will not be able to manufacture the 
parent FG. Till the order is in Planned state you can anytime reschedule the 
order but once it is firmed then you will have to change the delivery date of 
the Production order (In Production order  General tab) and then do the 
scheduling for it. You can also do the Explosion for the Production order and 
handle the new requirements for it.
 
But as of now the grouping of the orders against one Sales Order is not 
available in Ax. Probably a customization will solve your problem as you can 
always see the reference of the planned order in Pegging section of the 
Planned Production order form.
 
I am not sure whether my understanding is accurate. Let me know if am wrong 
somewhere in understanding the requirement :)
 
Waiting to hear from you.
 
-Tushar

--- On Thu, 27/11/08, James Flavell [EMAIL PROTECTED] wrote:

From: James Flavell [EMAIL PROTECTED]
Subject: RE: [Axapta-Knowledge-Village] Re: Grouping of production orders for 
planning
To: Axapta-Knowledge-Village@yahoogroups.com
Date: Thursday, 27 November, 2008, 12:46 PM







Sorry Harry,
 
The schedule with finite material which I think is what you mean by the 
'limited by materials' option I understand but I am trying to group several 
production orders together so that they all only start on a date when all 
materialfor all the production orders has a confirmed date. If one of the 
material POs should later have a change in confirmed date then the scheduling 
should reschedule ALL the grouped production orders to the new date.
 
The scenario is revolving around project based manufacturer whereby the 
customer does not have a lot of spare space to hold finsihed items (even if 
they did have space they would still want to group by the project) and so they 
maybe get a project that has maybe 30 different FG to be produced and then 
delivered on a certain date. They want to do the picking of all the material at 
the same time for all 30 Productions as well as do the 30 production ordrs 
together so they can then ship them out all together at the correct date.
 
All the production orders are pretty much involving only human labour and 
therefore there is not real machine constraints. So the customer would like all 
30 production orders to be 'together' in the scheduling then the shop floor 
(assembly) can just go and start any of them and then move on to the next one 
until they are all finished and then the project can be shipped out 
 
Thanks
James
 
 
 



From: Axapta-Knowledge- [EMAIL PROTECTED] ups.com [mailto:Axapta- Knowledge- 
[EMAIL PROTECTED] ups.com] On Behalf Of Harry Deshpande
Sent: 27 November 2008 00:57
To: Axapta-Knowledge- [EMAIL PROTECTED] ups.com
Subject: RE: [Axapta-Knowledge- Village] Re: Grouping of production orders for 
planning






I am not sure of what you are saying. Did you try ‘limited by materials’ 
checkbox while scheduling production orders?

Regards

Harry




From: Axapta-Knowledge- [EMAIL PROTECTED] ups.com [mailto:Axapta- Knowledge- 
[EMAIL PROTECTED] ups.com] On Behalf Of James Flavell
Sent: Wednesday, November 26, 2008 1:19 AM
To: Axapta-Knowledge- [EMAIL PROTECTED] ups.com
Subject: RE: [Axapta-Knowledge- Village] Re: Grouping of production orders for 
planning





Thanks Harry



Kind of getting you although probably not 100%



The production orders planned start date should be based on when the material 
is available

If the material is delayed then the start date of the production orders should 
be delayed and the user warned if they will miss the delivery date



I believe this is how the master planning is doing in AX (for single item) if 
everything is still in the planned status. But once firmed then I think AX 
master planning does not really give a good indication to the user 



Thanks

James








From: Axapta-Knowledge- [EMAIL PROTECTED] ups.com [mailto:Axapta- Knowledge- 
[EMAIL PROTECTED] ups.com] On Behalf Of Harry Deshpande
Sent: 24 November 2008 12:22
To: Axapta-Knowledge- [EMAIL PROTECTED] ups.com
Subject: RE: [Axapta-Knowledge- Village] Re: Grouping of 

Re: [Axapta-Knowledge-Village] Ax Installation error . Plz send Reply Urgent.

2008-10-16 Thread Tushar Joshi
Contents of log MSI (s) (CC:58) [11:47:38:729] : MainEngineThread is returning 
1625
This installation is forbidden by system policy.  Contact your system 
administrator indicates that you are not doing the installation being an 
administrative user.
 
Make sure that you do the installation as an administrator user.
 
-Tushar

--- On Thu, 16/10/08, suneel babu [EMAIL PROTECTED] wrote:

From: suneel babu [EMAIL PROTECTED]
Subject: [Axapta-Knowledge-Village] Ax Installation error . Plz send Reply 
Urgent.
To: Axapta Knowledge village axapta-knowledge-village@yahoogroups.com, 
amit bhatt AX [EMAIL PROTECTED], Arjit babu Ax [EMAIL PROTECTED], Ax 
Questions [EMAIL PROTECTED], Development [EMAIL PROTECTED]
Date: Thursday, 16 October, 2008, 3:39 PM






Hi.,
  when i am installain g Ax 4.0 AOS at the client place, i faced the below 
error.
  Any one knows about that, plz send reply ASAP.
 
 * *ObjectServe r+log.txt* * * 
MSI (s) (CC:58) [11:47:38:729] : Product not registered: beginning first-time 
install
MSI (s) (CC:58) [11:47:38:729] : PROPERTY CHANGE: Adding ProductState property. 
Its value is '-1'.
MSI (s) (CC:58) [11:47:38:729] : Entering CMsiConfigurationMa nager::SetLastUs 
edSource.
MSI (s) (CC:58) [11:47:38:729] : User policy value 'DisableMedia' is 1
MSI (s) (CC:58) [11:47:38:729] : Warning: rejected media source due to system 
policy.
MSI (s) (CC:58) [11:47:38:729] : Note: 1: 1708
MSI (s) (CC:58) [11:47:38:729] : Note: 1: 2729
MSI (s) (CC:58) [11:47:38:729] : Note: 1: 2729
MSI (s) (CC:58) [11:47:38:729] : Product: Microsoft Dynamics AX 4.0 Object 
Server -- Installation failed.
MSI (s) (CC:58) [11:47:38:729] : MainEngineThread is returning 1625
This installation is forbidden by system policy.  Contact your system 
administrator.
H:\Msi\ObjectServer \ObjectServer. msi
MSI (c) (E0:9C) [11:47:38:839] : Decrementing counter to disable shutdown. If 
counter = 0, shutdown will be denied.  Counter after decrement: -1
MSI (c) (E0:9C) [11:47:38:839] : MainEngineThread is returning 1625
 * * * * * * 
* 



Get the latest buzz on outsourcing. Up to date information on mergers, 
acquisitions and deals on BPO Watch. Try it now!















  Get perfect Email ID for your Resume. Grab now 
http://in.promos.yahoo.com/address

[Axapta-Knowledge-Village] Sales Tax Codes Report in IND LOC 4.0 SP2

2008-10-14 Thread Tushar Joshi
Hello all,
 
Does anyone have any idea about how to do the report setup for sales tax 
codes?? It is available as a standard feature in Ax 4.0 SP2 IND LOC at 
following path:
 
GL  Setup  Sales Tax  Sales Tax codes -- select any sales tax code and go to 
Report Setup tab and Report setup - credit note tab, here we can design the 
reports but as of now no idea of how to design it.
 
If anyone has done some work on it, then it will be of gr8 help!!
 
-Tushar


  Add more friends to your messenger and enjoy! Go to 
http://messenger.yahoo.com/invite/

Re: [Axapta-Knowledge-Village] Re: Item transaction reference

2008-10-07 Thread Tushar Joshi
Hi Kiran,
 
My client is using their customized barcode definition and for that we have 
customized the ean 128 type of barcode setup available in Axapta. It is 
modified as per their requirement. The barcode definition contains Vendor name, 
Item number, Item Name, Date of receipt, Lot qty(received qty) and packing qty 
i.e. if the supplier has sent 400 units of an item in 4 packs containing 100 
units in each pack.
 
Now based on this we have managed to print the barcode labels at the time of 
quality inspection and the material is inwarded but the scanning process is 
done when the same material is issued to production department. At the time of 
scanning i want to maintain FIFO i.e. the first received material should be 
issued first. for which i wanted to know whether we can keep a track of 
receipts and issues of the material.
 
let me know if u need more information.
 
-Tushar

--- On Sun, 5/10/08, kkthadishetty [EMAIL PROTECTED] wrote:

From: kkthadishetty [EMAIL PROTECTED]
Subject: [Axapta-Knowledge-Village] Re: Item transaction reference
To: Axapta-Knowledge-Village@yahoogroups.com
Date: Sunday, 5 October, 2008, 2:33 AM






Hi Tushar,

i need some more information about the barcode for the item.when and 
how the barcode is generated

barcode containing which data..(composition of barcode) and which 
barcode your client is using(ean13 or ean128..etc. ,)

when the items are picked from the inventory we have to do some 
customisation for batch control.

and there are some addons are avaliable for batch control.

(FULLSCOPE Process manufacturing addon module have the batch control.)

i think some other partners are also developed the batch controll.

regards
kiran
00971554070590

if barcode contains batch data/ batch number in that...

--- In Axapta-Knowledge- [EMAIL PROTECTED] ups.com, Tushar Joshi 
tushar_s_joshi@ ... wrote:

 Agreed Kiran.
  
 But my client has a Barcode setup in which they scan the barcode 
label while issuing the material from the inventory. Now I want to 
use FIFO methodology while scanning i.e. If i have 2 PO's for X item 
with different receipt days say 2/10/2008 and 3/10/2008.
  
 Now when i will isssue the material X to production department at 
that time i have a barcode label printed on the material and it has a 
definition for it which contains date of receipt, according to this 
if a material with prior receipt date is available in my inventory 
then scanning should throw an error saying previously received 
material exists in inventory so i though might be the LOT ID's or 
REFRENCE ID's can work for this
  
 If you have any other suggession to map this, i would gladly accept 
the same! :)
  
 -Tushar
 
 --- On Mon, 29/9/08, kkthadishetty kkthadishetty@ ... wrote:
 
 From: kkthadishetty kkthadishetty@ ...
 Subject: [Axapta-Knowledge- Village] Re: Item transaction reference
 To: Axapta-Knowledge- [EMAIL PROTECTED] ups.com
 Date: Monday, 29 September, 2008, 12:21 PM
 
 
 
 
 
 
 
 Hi Tushar,
 
 i understood your query. but i want to know the reason why u want 
to 
 track the items through LOT ID..in the Ax we have Batch number 
 dimension available already.
 activate the batch number dimension for the item and the same can 
be 
 tracked.
 
 Regards
 
 Kiran
 
 --- In Axapta-Knowledge- [EMAIL PROTECTED] ups.com, Tushar Joshi 
 tushar_s_joshi@ ... wrote:
 
  Thanks Khalil,
   
  But do we have a reference for it? how can you say that it has 
been 
 reduced from the 1st PO? I am using FIFO method for my inventory 
 transactions. Does it refers to any LOT, REFERENCE or DIMNSION ID?? 
 if u can explain in some more detail then it would of gr8 help!!
   
  -Tushar
  
  --- On Sun, 28/9/08, Khalil Rehman khalilrehman5@ ... wrote:
  
  From: Khalil Rehman khalilrehman5@ ...
  Subject: RE: [Axapta-Knowledge- Village] Item transaction 
reference
  To: axapta-knowledge- [EMAIL PROTECTED] ups.com
  Date: Sunday, 28 September, 2008, 12:50 PM
  
  
  
  
  
  
  Dear Tushar,
   
      if you are using FIFO method, then it will reduce 
the 
 quatity from that PO, which was become inventory part first. mean 
 from the PO whose invoice generated first.
   
  i hope it will solve your problem.
  
  
  
    KHALIL UR REHMAN  
  
  
  
  
  To: Axapta-Knowledge- [EMAIL PROTECTED] ups.com
  From: tushar_s_joshi@ yahoo.co. in
  Date: Sat, 27 Sep 2008 10:34:09 +0530
  Subject: [Axapta-Knowledge- Village] Item transaction reference
  
  
  
  
  
  
  
  
  
  Hi Ax Users,
   
  I want to know how can we keep a track of Item transactions 
 references?? which has been received and issued. In detail the 
 scenario is like this:
   
  I have created 2 PO's of the item X.
  Former with Qty 100 and Later with 500
  After posting invoice for both Purchase Orders the Lot ID, 
 Reference Lot Id and Dimension ID got generated against both of 
them 
 in Inventory item transactions.
  My Inventory for the same Item shows now 600 qty.
  After Posting

Re: [Axapta-Knowledge-Village] Re: Item transaction reference

2008-10-03 Thread Tushar Joshi
Agreed Kiran.
 
But my client has a Barcode setup in which they scan the barcode label while 
issuing the material from the inventory. Now I want to use FIFO 
methodology while scanning i.e. If i have 2 PO's for X item with different 
receipt days say 2/10/2008 and 3/10/2008.
 
Now when i will isssue the material X to production department at that time i 
have a barcode label printed on the material and it has a definition for it 
which contains date of receipt, according to this if a material with prior 
receipt date is available in my inventory then scanning should throw an error 
saying previously received material exists in inventory so i though might be 
the LOT ID's or REFRENCE ID's can work for this
 
If you have any other suggession to map this, i would gladly accept the same! :)
 
-Tushar

--- On Mon, 29/9/08, kkthadishetty [EMAIL PROTECTED] wrote:

From: kkthadishetty [EMAIL PROTECTED]
Subject: [Axapta-Knowledge-Village] Re: Item transaction reference
To: Axapta-Knowledge-Village@yahoogroups.com
Date: Monday, 29 September, 2008, 12:21 PM







Hi Tushar,

i understood your query. but i want to know the reason why u want to 
track the items through LOT ID..in the Ax we have Batch number 
dimension available already.
activate the batch number dimension for the item and the same can be 
tracked.

Regards

Kiran

--- In Axapta-Knowledge- [EMAIL PROTECTED] ups.com, Tushar Joshi 
tushar_s_joshi@ ... wrote:

 Thanks Khalil,
  
 But do we have a reference for it? how can you say that it has been 
reduced from the 1st PO? I am using FIFO method for my inventory 
transactions. Does it refers to any LOT, REFERENCE or DIMNSION ID?? 
if u can explain in some more detail then it would of gr8 help!!
  
 -Tushar
 
 --- On Sun, 28/9/08, Khalil Rehman khalilrehman5@ ... wrote:
 
 From: Khalil Rehman khalilrehman5@ ...
 Subject: RE: [Axapta-Knowledge- Village] Item transaction reference
 To: axapta-knowledge- [EMAIL PROTECTED] ups.com
 Date: Sunday, 28 September, 2008, 12:50 PM
 
 
 
 
 
 
 Dear Tushar,
  
     if you are using FIFO method, then it will reduce the 
quatity from that PO, which was become inventory part first. mean 
from the PO whose invoice generated first.
  
 i hope it will solve your problem.
 
 
 
   KHALIL UR REHMAN  
 
 
 
 
 To: Axapta-Knowledge- [EMAIL PROTECTED] ups.com
 From: tushar_s_joshi@ yahoo.co. in
 Date: Sat, 27 Sep 2008 10:34:09 +0530
 Subject: [Axapta-Knowledge- Village] Item transaction reference
 
 
 
 
 
 
 
 
 
 Hi Ax Users,
  
 I want to know how can we keep a track of Item transactions 
references?? which has been received and issued. In detail the 
scenario is like this:
  
 I have created 2 PO's of the item X.
 Former with Qty 100 and Later with 500
 After posting invoice for both Purchase Orders the Lot ID, 
Reference Lot Id and Dimension ID got generated against both of them 
in Inventory item transactions.
 My Inventory for the same Item shows now 600 qty.
 After Posting the Purchase Orders the Inventory transactions has 
the status as PURCHASED.
  
 Now i did a transaction of Item movement, through Inventory 
Movement Journal.
 The qty in movement journal is -50.
 After posting the Movement journal, inventory transaction for the 
item has status as SOLD.
  
 Here i want to know out of which two PURCHASED lots I have issued 
the qty (means whether from the PURCHASE of 100 or from the PURCHASE 
of 500)??
  
 Would appreciate any input on this!! Its really urgent!
  
 -Tushar
 
 
 Did you know? You can CHAT without downloading messenger. Click 
here 
 
 
 
 
 Invite your mail contacts to join your friends list with Windows 
Live Spaces. It's easy! Try it! 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 Download prohibited? No problem. CHAT from any browser, 
without download. Go to http://in.webmessen ger.yahoo. com/


 














  Add more friends to your messenger and enjoy! Go to 
http://messenger.yahoo.com/invite/

RE: [Axapta-Knowledge-Village] Item transaction reference

2008-09-28 Thread Tushar Joshi
Thanks Khalil,
 
But do we have a reference for it? how can you say that it has been reduced 
from the 1st PO? I am using FIFO method for my inventory transactions. Does it 
refers to any LOT, REFERENCE or DIMNSION ID?? if u can explain in some more 
detail then it would of gr8 help!!
 
-Tushar

--- On Sun, 28/9/08, Khalil Rehman [EMAIL PROTECTED] wrote:

From: Khalil Rehman [EMAIL PROTECTED]
Subject: RE: [Axapta-Knowledge-Village] Item transaction reference
To: axapta-knowledge-village@yahoogroups.com
Date: Sunday, 28 September, 2008, 12:50 PM






Dear Tushar,
 
    if you are using FIFO method, then it will reduce the quatity from that PO, 
which was become inventory part first. mean from the PO whose invoice generated 
first.
 
i hope it will solve your problem.



  KHALIL UR REHMAN  




To: Axapta-Knowledge- [EMAIL PROTECTED] ups.com
From: tushar_s_joshi@ yahoo.co. in
Date: Sat, 27 Sep 2008 10:34:09 +0530
Subject: [Axapta-Knowledge- Village] Item transaction reference









Hi Ax Users,
 
I want to know how can we keep a track of Item transactions references?? which 
has been received and issued. In detail the scenario is like this:
 
I have created 2 PO's of the item X.
Former with Qty 100 and Later with 500
After posting invoice for both Purchase Orders the Lot ID, Reference Lot Id and 
Dimension ID got generated against both of them in Inventory item transactions.
My Inventory for the same Item shows now 600 qty.
After Posting the Purchase Orders the Inventory transactions has the status as 
PURCHASED.
 
Now i did a transaction of Item movement, through Inventory Movement Journal.
The qty in movement journal is -50.
After posting the Movement journal, inventory transaction for the item has 
status as SOLD.
 
Here i want to know out of which two PURCHASED lots I have issued the qty 
(means whether from the PURCHASE of 100 or from the PURCHASE of 500)??
 
Would appreciate any input on this!! Its really urgent!
 
-Tushar


Did you know? You can CHAT without downloading messenger. Click here 




Invite your mail contacts to join your friends list with Windows Live Spaces. 
It's easy! Try it!  














  Download prohibited? No problem. CHAT from any browser, without download. 
Go to http://in.webmessenger.yahoo.com/

[Axapta-Knowledge-Village] Report Path in Report print!

2008-09-26 Thread Tushar Joshi
All,
 
Is 
 
 


  Unlimited freedom, unlimited storage. Get it now, on 
http://help.yahoo.com/l/in/yahoo/mail/yahoomail/tools/tools-08.html/

[Axapta-Knowledge-Village] Report Path in Report print!

2008-09-26 Thread Tushar Joshi
All,
 
Is it possible to print the Report path in the print of the report?
 
E.g. - I have opened a report say GLReportsTransactionsPeriodicTrial 
Balance, then on the report print is it possible to print it somewhere? say 
header or footer? In one of the implementations it has came as a requirement 
from Client :)
 
-Tushar


  Unlimited freedom, unlimited storage. Get it now, on 
http://help.yahoo.com/l/in/yahoo/mail/yahoomail/tools/tools-08.html/

[Axapta-Knowledge-Village] Configuration Rules and Routes

2008-09-16 Thread Tushar Joshi
Hi Ax users,
 
Does anyone have idea or any document for reference on BOM Configuration Rules 
and Configuration Routes??
 
How it can be set? whats the procedure for setting a configuration rule or 
route? what is the significance of it?
 
-Tushar


  Add more friends to your messenger and enjoy! Go to 
http://in.messenger.yahoo.com/invite/

Re: [Axapta-Knowledge-Village] Master data not displaying.

2008-09-11 Thread Tushar Joshi
I think the problem is with inventdimid field of InventItemLocation table (if 
you check  InventItemLocation is the datasource of InventTable and its having  
join with InventDim table) 
Records will be visible on form if we have: 
1 Item’s record in InventTable 
2 Three records in InventTableModule Table (for sales, purch and invent) 
3 Record in InventItemLocation table and inventDimId field of this table is 
having “Axapta” value (that is default value) 
So what I feel, in your case you’ve not updated the InventItemLocation table 
correctly…. Just insert “Axapta” in the inventDimId field the u’ll be able to 
see the records on form…. 
 
-Tushar

--- On Wed, 10/9/08, Clive Buda [EMAIL PROTECTED] wrote:

From: Clive Buda [EMAIL PROTECTED]
Subject: Re: [Axapta-Knowledge-Village] Master data not displaying.
To: Axapta-Knowledge-Village@yahoogroups.com
Date: Wednesday, 10 September, 2008, 7:01 PM






Did you check the company that you used on the import file and the one that you 
cannot see your data.

--- On Tue, 9/9/08, sachin ghodajkar [EMAIL PROTECTED] com wrote:

 From: sachin ghodajkar [EMAIL PROTECTED] com
 Subject: [Axapta-Knowledge- Village] Master data not displaying.
 To: Axv axapta-knowledge- [EMAIL PROTECTED] ups.com
 Date: Tuesday, September 9, 2008, 12:41 PM
 Dear friends,
 
 I uploaded the data in a company.The activity was completed
 succesfully without any error or message.( Message:-The
 import took 100 seconds) 
 
 But when i goes to Item master data, the data was not
 displayed. The data is also not available in back-end i.e.
 invent table, invent table module * invent table location.
 
 Please tell me the reason why it is happening  its
 remedy.
 
 Reply the mail ASAP.
 
 
 Regards
 
 Sachin S.Ghodajkar
 Mumbai.
 
 
 
 Unlimited freedom, unlimited storage. Get it now, on
 http://help. yahoo.com/ l/in/yahoo/ mail/yahoomail/ tools/tools- 08.html/

 














  Unlimited freedom, unlimited storage. Get it now, on 
http://help.yahoo.com/l/in/yahoo/mail/yahoomail/tools/tools-08.html/

[Axapta-Knowledge-Village] trade agreements lead time field significance

2008-08-29 Thread Tushar Joshi
All,
 
I have came across a requirement regarding trade agreements based on the mode 
of delivery for which in standard Ax there is no setups available. Though i am 
trying to handle or suggest a work around for it through the lead time field 
in trade agreements form because if the mode of delivery for the item is say 
BY AIR and BY SEA then there will be a difference in the purchase lead time 
of it which can be set by selecting the delivery date while creating a P.O.
 
E.g. I have created a purchase price agreement for B-Pack1 item as below 
 













Currency
Account code
Account selection
Warehouse
Unit
Quantity
Price
Find next
Lead time
Working days

INR
Table
3000
GW
Pcs
100
8
Yes
5
Yes

INR
Table
3000
GW
Pcs
100
10
Yes
0
Yes
 
so in above scenarion my price of the item varies on the basis of lead time. 
But when i create a PO and set its delivery date as today (that means the lead 
time in this case is 0 days) still my PO line shows the rate of the item as 
8.00 Rs. which should be 10.00 Rs in this case.
 
Can anyone help on this?
Also please let me know if my approach is altogether wrong!
 
Your valuable inputs are required!
 
-Tushar


  Add more friends to your messenger and enjoy! Go to 
http://in.messenger.yahoo.com/invite/

Re: [Axapta-Knowledge-Village] Error during multi line voucher posting

2008-08-29 Thread Tushar Joshi
What transaction u r doing? Service Tax, TDS?
 
-Tushar

--- On Thu, 28/8/08, asit nayak [EMAIL PROTECTED] wrote:

From: asit nayak [EMAIL PROTECTED]
Subject: [Axapta-Knowledge-Village] Error during multi line voucher posting
To: Axapta-Knowledge-Village@yahoogroups.com
Date: Thursday, 28 August, 2008, 9:35 AM







Hi All,
 
I am using Ax 4.0Sp2(IND).
 
When I am posting multi line voucher ,recoverable GL account is hitting rather 
than interim account. It should hit interim account.
 
Please any one help me out.
 
 
Thanks
Asit
 
 
 














  Unlimited freedom, unlimited storage. Get it now, on 
http://help.yahoo.com/l/in/yahoo/mail/yahoomail/tools/tools-08.html/

RE: [Axapta-Knowledge-Village] Production Time in Seconds

2008-08-11 Thread Tushar Joshi
Thanks Harry for the prompt reply.
 
Date of the sales orders is 1/1/2008. I have changed my machine date to 
1/1/2008 and asked the user to enter the sales order schedule.
 
I am doing the Master scheduling for the first time and there are no production 
orders exisitng so capacity reservations should not be the reason for the 
error. 
 
Is my conversion factor correct? and i trust that, putting it into the 
Hours/Time field is the correct way of doing setup! Correct me if wrong.

--- On Mon, 11/8/08, Harry Deshpande [EMAIL PROTECTED] wrote:

From: Harry Deshpande [EMAIL PROTECTED]
Subject: RE: [Axapta-Knowledge-Village] Production Time in Seconds
To: Axapta-Knowledge-Village@yahoogroups.com 
Axapta-Knowledge-Village@yahoogroups.com
Date: Monday, 11 August, 2008, 1:54 AM








What is the date of your sales order?
 
Regards
 
Harry
www.systomatics. com
 
 


From: Axapta-Knowledge- [EMAIL PROTECTED] ups.com [mailto:Axapta- Knowledge- 
[EMAIL PROTECTED] ups.com] On Behalf Of Tushar Joshi
Sent: Saturday, August 09, 2008 3:15 AM
To: Axapta-Knowledge- [EMAIL PROTECTED] ups.com
Subject: [Axapta-Knowledge- Village] Production Time in Seconds
 








Hello All,

 

Does anyone has idea how to capture the runtime of a process in seconds?

 

I tried the same by putting the Conversion factor as (1/3000=.0003) into the 
Hours/Time field in Times Tab of the Route.

 

But it throws the error when i ran the Master scheduling saying working Time 
STD not defined for the period 31/12/2007.

 

I am running the master scheduling for the month of January and have changed my 
system date to 1/1/2008. Logically Axapta will do the requirements calculations 
for Purchase and Production orders in a backward direction i.e. from the date 
of delivery it will go backwards. My sales order quantities are around 40,000 
nos and if the cycle time for 1 unit(process qty) is 15 seconds then its should 
not go beyond 2 hrs of production time. But still am getting the eror for the 
period of 31/12/2005.

 

Any help would be highly appreciated!

 

a screenashot of the setups is attached for the reference.






Download prohibited? No problem. CHAT from any browser, without download.
 














  Add more friends to your messenger and enjoy! Go to 
http://in.messenger.yahoo.com/invite/

[Axapta-Knowledge-Village] Difference between Movement Journal and Profit/Loss journal

2008-05-12 Thread Tushar Joshi
Hello Ax Users,
   
  What is the difference between Movement Journal and Profit/Loss journal? the 
only difference i found is We can define an offset account in Movement journal 
and in Profit/Loss journal we can put only quantity ad cost for item.
   
  Can anyone put some light on how and in which scenarios these journals will 
be used?
   
  At least 1 example each!!
   
  -Tushar

   
-
 Bring your gang together. Do your thing. Find your favourite Yahoo! Group.

Re: [Axapta-Knowledge-Village] Packing Slip Number

2008-05-01 Thread Tushar Joshi
Hi there,
   
  I think there is no point in attaching any number sequence to Packing slip 
because it'a user enterable field in which the user will enter the packing slip 
number which he recieves from Supplier(Vendor) at the time of material reciept 
(it is also known as Goods Reciept Note / Delivery Challan number in INDIAN 
scenario) and so there should not be any number sequence attached to it.
   
  -Tushar

findrajon [EMAIL PROTECTED] wrote:
  Hi everybody.
Can anyone please help me in attaching a number sequence to
packing slip no field when i try to post packing slip in purchase 
order.The no should be visible on this field as soon as packing slip 
posting form is opened.



   

   
-
 Bollywood, fun, friendship, sports and more. You name it,  we have it.

Re: [Axapta-Knowledge-Village] Packing Slip Number

2008-05-01 Thread Tushar Joshi
Hi there,
   
  I think there is no point in attaching any number sequence to Packing slip 
because it's a user enterable field in which the user will enter the packing 
slip number which he recieves from Supplier(Vendor) at the time of material 
reciept (it is also known as Goods Reciept Note / Delivery Challan number in 
INDIAN scenario) and so there should not be any number sequence attached to it.
   
  -Tushar


findrajon [EMAIL PROTECTED] wrote:
  Hi everybody.
Can anyone please help me in attaching a number sequence to
packing slip no field when i try to post packing slip in purchase 
order.The no should be visible on this field as soon as packing slip 
posting form is opened.



   

   
-
 Explore your hobbies and interests. Click here to begin.

Re: [Axapta-Knowledge-Village] Export to Excel

2008-04-24 Thread Tushar Joshi
You can save the report in HTML format and then open with excel
   
  -Tushar

[EMAIL PROTECTED] wrote:
  Hi All,
I have one report, which when exported to excel doesnt comes in proper
format.Is there any other way to export the report in excel, may be
through coding as possible in Navision.

Thanks in advance.
Regards
Priyanka



   

   
-
 From Chandigarh to Chennai - find friends all over India.  Click here.

RE: [Axapta-Knowledge-Village] Re: Shift timings fpr Production

2008-04-14 Thread Tushar Joshi
Thanks Anders.
   
  But does that mean we can not use these working times for INDIAN production 
scenario? where you have time intervals as 07:00AM to 03:00PM, 03:00PM to 
11:00PM and 11:00PM to 07:00AM(next day).
   
  If NO then can we customize these working times? Its a critical requirement 
from client to keep track of production outputs!!
   
  -Tushar

Anders Sorensen [EMAIL PROTECTED] wrote:
  Hi,
  
  The problem is that you are not allowed to have time intervals that cross 
midnight (toTime always has to be after fromTime) , since each working time 
interval is defined per date.
  
  Regards,
  Anders Sorensen
  
  
  This posting is provided AS IS with no warranties, and confers no rights.
  
  From: Axapta-Knowledge-Village@yahoogroups.com [mailto:[EMAIL PROTECTED] 
On Behalf Of Tushar Joshi
Sent: 11. april 2008 10:21
To: Axapta-Knowledge-Village@yahoogroups.com
Subject: Re: [Axapta-Knowledge-Village] Re: Shift timings fpr Production


  
  No Sumit it still gives the error. I have attached the screenshot for 
reference.



-Tushar

dperko64 [EMAIL PROTECTED] wrote:

Your end time for one shift is exactly the same as the start time for 
your next shift. Either change first shift to end at 2:59 PM or start 
your second shift at 3:01 PM. 

--- In Axapta-Knowledge-Village@yahoogroups.com, Tushar Joshi 
[EMAIL PROTECTED] wrote:

 Hi Sumit,
 
 I have to map the shift wise production details in Production 
order. We have created a Caledar and in that the working times are 
defined but when i try to create the time intervals as 07:00AM-03:00PM, 
03:00PM-11:00PM, and 11:00PM -07:00AM(next day) it wont allow me to do 
this. It says illegal time intervals. can we customise the working 
times??
 
 -Tushar
 



  


-
  
  Unlimited freedom, unlimited storage. Get it now

  



  

   

   
-
 Unlimited freedom, unlimited storage. Get it now

Re: [Axapta-Knowledge-Village] Re: Import the text file and create journal,lines and settle the open transactions

2008-04-13 Thread Tushar Joshi
Hi Naveed,
   
  Can we use the same if i want to import an Excel file and do the same tasks 
mentioned in mail chain?
   
  I have a requirement of that sort regarding the customer payment reciepts 
i will recieve a excel from customer in which he will be mentioning the details 
for payment against 200 odd invoices n instead of knocking off each transaction 
can we upload the excel n do the required thing?
   
  -Tushar

Navid Ahsan [EMAIL PROTECTED] wrote:
  Hi Sanjeev,

Following is the code that creates the Journal, marks the transaction 
(indicated by invoiceid) for settlement and then posts the Journal.

server static boolean ProcessPayment(CustPaymMode _paymMode, 
AccountNum _accountNum, InvoiceId _invoiceId, AmountCurCredit 
_amountCurCredit, TransDate _transDate = SystemDateGet())
{
LedgerJournalName ledgerJournalName;
LedgerJournalTable ledgerJournalTable;
LedgerJournalTrans ledgerJournalTrans;
LedgerJournalCheckPost ledgerJournalCheckPost;

Common common;
NumberSeq numberseq;
CustTransOpen custTransOpen;
CustInvoiceSalesLink custInvoiceSalesLink;
Specification specOffsetVoucher;

boolean result = false;
CompanyInfo company = CompanyInfo::find();
SalesId salesId = '';
CustTable cust = CustTable::find(_accountNum);
;

// if we have invoice id that means we are applying a payment
// on invoice otherwise on account payment
if(_invoiceId != '')
{
select firstonly custInvoiceSalesLink
where custInvoiceSalesLink.invoiceId == _invoiceId;

}

try
{
ttsbegin;

// Journal Name should be warehouse specific
select firstonly ledgerJournalName
where ledgerJournalName.JournalType == 
LedgerJournalType::CustPayment
 ledgerJournalName.JournalName == 'Cust';

if(ledgerJournalName)
{
ledgerJournalTable.JournalName = 
ledgerJournalName.JournalName;
ledgerJournalTable.Name = ledgerJournalName.Name;
ledgerJournalTable.insert();

if(ledgerJournalTable)
{
numberseq = NumberSeq::NewGetVoucherFromCode
(ledgerJournalName.VoucherSeries);
ledgerJournalTrans.JournalNum = 
ledgerJournalTable.JournalNum;
ledgerJournalTrans.Voucher = 
numberseq.voucher();
ledgerJournalTrans.TransDate = _transDate;
ledgerJournalTrans.AccountType = 
LedgerJournalACType::Cust;
ledgerJournalTrans.Txt = strfmt('%1%
2', parameters.AdvSetTransTxt, _transDate);
ledgerJournalTrans.OffsetAccountType = 
ledgerJournalName.OffsetAccountType;
ledgerJournalTrans.OffsetAccount = 
ledgerJournalName.OffsetAccount;
ledgerJournalTrans.Dimension = 
ledgerJournalName.Dimension;
ledgerJournalTrans.CurrencyCode = 
company.CurrencyCode;
ledgerJournalTrans.ExchRate = 
ExchRates::find(company.CurrencyCode, datenull(), NoYes::No, 
NoYes::No).ExchRate;
ledgerJournalTrans.TransactionType = 
LedgerTransType::Payment;
ledgerJournalTrans.Dimension[4] = 
routeTable.DriverName1;
ledgerJournalTrans.PaymMode = _paymMode;
if(_invoiceId != '')
ledgerJournalTrans.SettleVoucher = 
SettlementType::SelectedTransact;
else
ledgerJournalTrans.SettleVoucher = 
SettlementType::None;
ledgerJournalTrans.AccountNum = _accountNum;
ledgerJournalTrans.AmountCurCredit = 
_amountCurCredit;
ledgerJournalTrans.insert();

// Mark invoice for settlement only if we are doing 
invoice payment
// not for account payment.
if(_invoiceId != '')
{
select custTransOpen
where custTransOpen.AccountNum == _accountNum
 custTransOpen.RefRecId == 
CustTrans::findFromInvoice(_invoiceId).RecId;
if(custTransOpen)
{
common = ledgerJournalTrans;
specOffsetVoucher = 
Specification_OffsetVoucher::newCommon(common, true);
if (!specOffsetVoucher.isMarked
(custTransOpen.TableId, custTransOpen.RecId))
{
if (ledgerJournalTrans.RecId)
{
specOffsetVoucher.create
(custTransOpen.TableId, custTransOpen.RecId, _amountCurCredit, 
company.CurrencyCode);
}
}
}
}

// Journal Created now post it
ledgerJournalCheckPost = 
LedgerJournalCheckPost::newLedgerJournalTable(ledgerJournalTable, 
NoYes::Yes);
ledgerJournalCheckPost.run();

result = true;
}
}
ttscommit;
}
catch
{
result = false;
}

return result;
}

You can create a form that opens the text file and then load the data 
into a temporary table and then when the user is satisfied with the 
data create the journal using above code(above code creates a jounral 
for one transaction only but it can be modified). Hope this will help.

Navid

--- In Axapta-Knowledge-Village@yahoogroups.com, Armaan 
[EMAIL PROTECTED] wrote:

 Hi friends,
 i have a requirement like i have a text file i need to import the 
text
 file and create a journal and line with the customer name..and for
 that customer i need to check all the open transactions and mark the
 transactions for settlement..
 the file contains all major details like invoice number,paym
 reference,total amount,voucher number etc...
 i need to start the process form AR periodic,i need to have a 
dialog
 box ..open the file ,,read the file and create journal,line and 
settle
 the open transactions..all the logic lies in class and from class am
 not able to access the markstrans method of custopentrans form..
 can u guys help me how 

Re: [Axapta-Knowledge-Village] Re: Shift timings fpr Production

2008-04-13 Thread Tushar Joshi
Thanks Hemant. But can we use this divided time interval for generating a shift 
wise production report? because my client is interested in SHIFTWISE production 
report and for nght shift we need to take 11:00 PM to 24:00 and 12:00AM to 
7:00AM timings as parameters to generate the report. Can we do this?
   
  -Tushar

Hemant Kumthekar [EMAIL PROTECTED] wrote:
  Hi,
   
  See the attached file.
   
  Hemant K
   
  

  - Original Message 
From: Tushar Joshi [EMAIL PROTECTED]
To: Axapta-Knowledge-Village@yahoogroups.com
Sent: Friday, April 11, 2008 3:21:03 AM
Subject: Re: [Axapta-Knowledge-Village] Re: Shift timings fpr Production

  No Sumit it still gives the error. I have attached the screenshot for 
reference.
   
  -Tushar

dperko64 [EMAIL PROTECTED] com wrote:
  Your end time for one shift is exactly the same as the start time for 
your next shift. Either change first shift to end at 2:59 PM or start 
your second shift at 3:01 PM. 

--- In Axapta-Knowledge- [EMAIL PROTECTED] ups.com, Tushar Joshi 
tushar_s_joshi@ ... wrote:

 Hi Sumit,
 
 I have to map the shift wise production details in Production 
order. We have created a Caledar and in that the working times are 
defined but when i try to create the time intervals as 07:00AM-03:00PM, 
03:00PM-11:00PM, and 11:00PM -07:00AM(next day) it wont allow me to do 
this. It says illegal time intervals. can we customise the working 
times??
 
 -Tushar
 






-
  Unlimited freedom, unlimited storage. Get it now   






__
Do You Yahoo!?
Tired of spam? Yahoo! Mail has the best spam protection around 
http://mail.yahoo.com   

   

   
-
 Best Jokes, Best Friends, Best Food. Get all this and more on  Best of Yahoo! 
Groups.

Re: [Axapta-Knowledge-Village] Enterprise Portal login

2008-04-01 Thread Tushar Joshi
Hi,
   
  It seems the Enterprise Portal setup has been crashed for the users who are 
not able to see the tabs viz. HomeSales etc. Try running the EP set up again 
and check the ports through which you are accessing the sharepoint site. Also 
authentication should be the NT AUTHENTICATION for log on.
   
  Hope this will resolve your problem
   
  -Tushar

larsj_73 [EMAIL PROTECTED] wrote:
  Hi,

I have an Enterprise Portal site that works fine for some users. 
Other users can't see anything when they log in (they can't even see 
the tabs for home, sales etc.), even though the users are in the 
exact same groups in AX and on the SharePoint site.

I've tried to put one of the users in the administration group, but 
that doesn't help either. 

When the 'normal' users are logged on to the site, they appear as web 
users in the online users list. When the users that can't see 
anything are logged on to the SharePoint site, they do not appear in 
the same list, so the problem seems to be in the logon to AX, but I 
can't figure out what it is.

I'm kind of lost here, so any help is appreciated.
-- 
With best regards
Lars H. Sandvik-Jacobsen



   

   
-
 5, 50, 500, 5000 - Store N number of mails in your inbox. Click here.

Re: [Axapta-Knowledge-Village] Reports From AX

2008-04-01 Thread Tushar Joshi
Hi,
   
  U can get some of these reports i dunno how useful they are in terms of the 
information u want to capture but try this out:
   
  1. Sales Report (Sales Representative wise)
   
  ARReportsTransactionsSales OrderSales Order this will open a parameter 
form where in u have to pass the parameters. Click on Select button which will 
take u to update/change the parameters. So you can change the sales order field 
to Sales Responsible field by selecting through drop down. Try running the 
report for specific sales responsible or for all.
   
  2. Recovery report (Sales Representative wise)
   
  No Clue.
   
  3. Product wise sales report
   
  You can have a Product wise/customer wise statistics report. try the 
following: ARReportsStatisticsCustomerItem/Customer Statistics.
   
  4. Try for ARReportstransactionsCustomersHistory by transaction, This 
report will give history by transactions for all customers. If u put the 
specific date while generating the report u might get what u want.
   
  and option no 5 even i need to dig out :)
   
  -Tushar

Sanam Khan [EMAIL PROTECTED] wrote:
  Hiii
  
  Do anyone have any idea how can I get these reports from AX …
  
  1.   Sales Report ( Sales representative Wise)
  2.   Recovery Report (Sales Representative wise)
  3.   Product Wise sales Report
  4.   Daily Sales Report (History wise)
  5.   Sales Representative Customers list
  
  
  Regards,
  
  Sanam khan 
  

  

   

   
-
 Save all your chat conversations. Find them online.

Re: [Axapta-Knowledge-Village] Lead Time in planning for Scheduling of operations

2008-04-01 Thread Tushar Joshi
Can u please guide me in mapping Sub contracting process in Ax.
   
  I have a client who follows sub-contracting process in which the material 
from his own inventory are sent to vendor for job-work and then the material in 
inwarded with a different item number.
   
  E.g. I have a sub assemly named A for which i have a BOM and the components 
are C and D. I will send the material C and D to my vendor and in turn he will 
return me item A.
   
  -Tushar

visti Sethna [EMAIL PROTECTED] wrote:
Can someone tell me how will the time be captured for the 
subcontracting (Service type) item please. Coz My gant chart should capture the 
lead time for procurement of the subcontracted item when I schedule  the jobs. 
Instead, it schedules the first operation instantly after the second operation. 
There is something called finite material and finite capacity planing. Where do 
i select the checkbox for finite material planning. 
   
  Please suggest.


-- 
With Regards,
Mr. Vishtaspa Sethna 
Associate E.R.P. Consultant
Godrej Infotech Ltd. 
Cell: +919718010823 
  

   

   
-
 Download prohibited? No problem. CHAT from any browser, without download.

Re: [Axapta-Knowledge-Village] Eror while importing Data from Excel to Ax

2008-03-29 Thread Tushar Joshi
VendTable and CustTable i did the export and gave it to client to fill it 
up with their actual data. after recieving it i tried to import using same 
definition group and it gave an error
   
  -Tushar

Nitesh [EMAIL PROTECTED] wrote:
Hi Tushar,
  Which Table you are trying to import  ? 
  

 
  On Thu, Mar 27, 2008 at 3:17 PM, Tushar Joshi [EMAIL PROTECTED] wrote:
  Did not get you. which format we need?
   
  -Tushar 
  

Dharmanadi [EMAIL PROTECTED] wrote:



Hi,
  
  Checked your excel format also – for example Ledger table 
  
  
  Regards,
  
  
-
  
  From: Axapta-Knowledge-Village@yahoogroups.com [mailto:[EMAIL PROTECTED] On 
Behalf Of Nitesh
Sent: Friday, March 21, 2008 6:56 PM
To: Axapta-Knowledge-Village@yahoogroups.com
Subject: Re: [Axapta-Knowledge-Village] Eror while importing Data from Excel to 
Ax

  
Hi Tushar,

seems Record already exist in Table .

From Import Dialog box go to Import Rule Tabpage and select the
Option clear table before Import from Import Rule field.

Regards
Nitesh

On 3/21/08, Tushar Joshi [EMAIL PROTECTED] wrote:
 Hi,

 I am trying to import the masterdata provided by client into Ax 4.0 SP2.

 I created a new blank company account in Ax to import data n started the
 excelimport through Administration - Periodic - Data Import/export -
 excel spreadsheets - excel import. but it gives an error and says the
 record already exists and import is interrupted. can anyone help me on how
 to import data through excel?

 The excel sheets were given ti client were created from same company
 account with a defnition group created.

 plz help..

 Regards,
 Tushar


 -
 Meet people who discuss and share your passions. Join them now.

  



  






-
  Did you know? You can CHAT without downloading messenger. Click here   
  
  
  






  

   

   
-
 Meet people who discuss and share your passions.  Join them now.

RE: [Axapta-Knowledge-Village] Eror while importing Data from Excel to Ax

2008-03-27 Thread Tushar Joshi
Cristina,
   
  How to import from a *.csv file? i saved my excel into a .csv type of file 
but when trying to import it through import option it does not allow me to 
select the file of tyep .csv!!
   
  -Tushar

Cristina Carcelén [EMAIL PROTECTED] wrote:
Try to import from an *.csv file.  Maybe you have some blanks records.


-
  De: Axapta-Knowledge-Village@yahoogroups.com [mailto:[EMAIL PROTECTED] En 
nombre de Tushar Joshi [EMAIL PROTECTED]
Enviado el: viernes, 21 de marzo de 2008 20:18
Para: Axapta-Knowledge-Village@yahoogroups.com
Asunto: Re: [Axapta-Knowledge-Village] Eror while importing Data from Excel to 
Ax


  
  Hi Nitesh,
   
  Thanks a lot for reply! but i tried this already... i have a doubt... if i 
try to import a single record then it is success but when i try to import 
another one it syas record already exists is it something to do with Number 
Sequences??? would appriciate if u cud throw some light on this :)
   
  Tushar

Nitesh [EMAIL PROTECTED] wrote:
  Hi Tushar,

seems Record already exist in Table 

From Import Dialog box go to Import Rule Tabpage and select the
Option clear table before Import from Import Rule field.

Regards
Nitesh

On 3/21/08, Tushar Joshi [EMAIL PROTECTED] wrote:
 Hi,

 I am trying to import the masterdata provided by client into Ax 4.0 SP2.

 I created a new blank company account in Ax to import data n started the
 excelimport through Administration - Periodic - Data Import/export -
 excel spreadsheets - excel import. but it gives an error and says the
 record already exists and import is interrupted. can anyone help me on how
 to import data through excel?

 The excel sheets were given ti client were created from same company
 account with a defnition group created.

 plz help..

 Regards,
 Tushar


 -
 Meet people who discuss and share your passions. Join them now.




-
  5, 50, 500, 5000 - Store N number of mails in your inbox. Click here.   

   #ygrp-mkp {   BORDER-RIGHT: #d8d8d8 1px solid; PADDING-RIGHT: 14px; 
BORDER-TOP: #d8d8d8 1px solid; PADDING-LEFT: 14px; PADDING-BOTTOM: 0px; MARGIN: 
14px 0px; BORDER-LEFT: #d8d8d8 1px solid; PADDING-TOP: 0px; BORDER-BOTTOM: 
#d8d8d8 1px solid; FONT-FAMILY: Arial  }  #ygrp-mkp HR {   BORDER-RIGHT: 
#d8d8d8 1px solid; BORDER-TOP: #d8d8d8 1px solid; BORDER-LEFT: #d8d8d8 1px 
solid; BORDER-BOTTOM: #d8d8d8 1px solid  }  #ygrp-mkp #hd {   FONT-WEIGHT: 
bold; FONT-SIZE: 85%; MARGIN: 10px 0px; COLOR: #628c2a; LINE-HEIGHT: 122%  }  
#ygrp-mkp #ads {   MARGIN-BOTTOM: 10px  }  #ygrp-mkp .ad {   PADDING-RIGHT: 
0px; PADDING-LEFT: 0px; PADDING-BOTTOM: 0px; PADDING-TOP: 0px  }  #ygrp-mkp .ad 
A {   COLOR: #ff; TEXT-DECORATION: none  }  #ygrp-sponsor #ygrp-lc {   
FONT-FAMILY: Arial  }  #ygrp-sponsor #ygrp-lc #hd {   FONT-WEIGHT: bold; 
FONT-SIZE: 78%; MARGIN: 10px 0px; LINE-HEIGHT: 122%  }  #ygrp-sponsor #ygrp-lc 
.ad {   PADDING-RIGHT: 0px; PADDING-LEFT: 0px; MARGIN-BOTTOM:
 10px; PADDING-BOTTOM: 0px; PADDING-TOP: 0px  }  #ygrp-mlmsg {   FONT: 
x-small arial,helvetica,clean,sans-serif  }  #ygrp-mlmsg TABLE {   FONT-WEIGHT: 
normal; FONT-SIZE: 100%; LINE-HEIGHT: normal; FONT-STYLE: normal; FONT-VARIANT: 
normal  }  #ygrp-mlmsg SELECT {   FONT: 99% arial,helvetica,clean,sans-serif  } 
 INPUT {   FONT: 99% arial,helvetica,clean,sans-serif  }  TEXTAREA {   FONT: 
99% arial,helvetica,clean,sans-serif  }  #ygrp-mlmsg PRE {   FONT: 100% 
monospace  }  CODE {   FONT: 100% monospace  }  #ygrp-mlmsg * {   LINE-HEIGHT: 
1.22em  }  #ygrp-text {   FONT-FAMILY: Georgia  }  #ygrp-text P {   MARGIN: 0px 
0px 1em  }  #ygrp-tpmsgs {   CLEAR: both; FONT-FAMILY: Arial  }  #ygrp-vitnav { 
  FONT-SIZE: 77%; MARGIN: 0px; PADDING-TOP: 10px; FONT-FAMILY: Verdana  }  
#ygrp-vitnav A {   PADDING-RIGHT: 1px; PADDING-LEFT: 1px; PADDING-BOTTOM: 0px; 
PADDING-TOP: 0px  }  #ygrp-actbar {   CLEAR: both; MARGIN: 25px 0px; COLOR: 
#666; WHITE-SPACE: nowrap; TEXT-ALIGN: right  } 
 #ygrp-actbar .left {   FLOAT: left; WHITE-SPACE: nowrap  }  bld {   
FONT-WEIGHT: bold  }  #ygrp-grft {   PADDING-RIGHT: 0px; PADDING-LEFT: 0px; 
FONT-SIZE: 77%; PADDING-BOTTOM: 15px; PADDING-TOP: 15px; FONT-FAMILY: Verdana  
}  #ygrp-ft {   PADDING-RIGHT: 0px; BORDER-TOP: #666 1px solid; PADDING-LEFT: 
0px; FONT-SIZE: 77%; PADDING-BOTTOM: 5px; PADDING-TOP: 5px; FONT-FAMILY: 
verdana  }  #ygrp-mlmsg #logo {   PADDING-BOTTOM: 10px  }  #ygrp-reco {   
PADDING-RIGHT: 0px; PADDING-LEFT: 0px; MARGIN-BOTTOM: 20px; PADDING-BOTTOM: 
0px; PADDING-TOP: 0px  }  #ygrp-reco #reco-head {   FONT-WEIGHT: bold; COLOR: 
#ff7900  }  #reco-grpname {   MARGIN-TOP: 10px; FONT-WEIGHT: bold  }  
#reco-category {   FONT-SIZE: 77%  }  #reco-desc {   FONT-SIZE: 77%  }  
#ygrp-vital {   PADDING-RIGHT: 0px; PADDING-LEFT: 8px; MARGIN-BOTTOM: 20px; 
PADDING-BOTTOM: 8px; PADDING-TOP: 2px; BACKGROUND-COLOR: #e0ecee  }  
#ygrp-vital #vithd {   FONT-WEIGHT: bold; FONT-SIZE: 77

RE: [Axapta-Knowledge-Village] Eror while importing Data from Excel to Ax

2008-03-27 Thread Tushar Joshi
Did not get you. which format we need?
   
  -Tushar

Dharmanadi [EMAIL PROTECTED] wrote:
  Hi,
  
  Checked your excel format also – for example Ledger table 
  
  
  Regards,
  
  
-
  
  From: Axapta-Knowledge-Village@yahoogroups.com [mailto:[EMAIL PROTECTED] On 
Behalf Of Nitesh
Sent: Friday, March 21, 2008 6:56 PM
To: Axapta-Knowledge-Village@yahoogroups.com
Subject: Re: [Axapta-Knowledge-Village] Eror while importing Data from Excel to 
Ax

  
Hi Tushar,

seems Record already exist in Table .

From Import Dialog box go to Import Rule Tabpage and select the
Option clear table before Import from Import Rule field.

Regards
Nitesh

On 3/21/08, Tushar Joshi [EMAIL PROTECTED] wrote:
 Hi,

 I am trying to import the masterdata provided by client into Ax 4.0 SP2.

 I created a new blank company account in Ax to import data n started the
 excelimport through Administration - Periodic - Data Import/export -
 excel spreadsheets - excel import. but it gives an error and says the
 record already exists and import is interrupted. can anyone help me on how
 to import data through excel?

 The excel sheets were given ti client were created from same company
 account with a defnition group created.

 plz help..

 Regards,
 Tushar


 -
 Meet people who discuss and share your passions. Join them now.

  



  

   

   
-
 Did you know? You can CHAT without downloading messenger.  Click here

Re: [Axapta-Knowledge-Village] Reverse Sales Packing Slips

2008-03-26 Thread Tushar Joshi
No its not possible to reverse a packing slip once it is posted... u have to 
pass a General Journal to reverse the account entry.
   
  Regds,
  Tushar

anishafakir [EMAIL PROTECTED] wrote:
  Hi,

Is it possible in AX4.0 to reverse packing slips by specifying a 
paticular packing slip for a sales order?

This is when a sales order has multiple packing slips, e.g. say 3 
packing slip records DN1, DN2, DN3 and you only want to reverse a 
particular packing slip say DN3.

Can this be done standard or must it be a mod?

Thanking you in advance

Regards,
Anisha



   

   
-
 Bollywood, fun, friendship, sports and more. You name it,  we have it.

Re: [Axapta-Knowledge-Village] Eror while importing Data from Excel to Ax

2008-03-24 Thread Tushar Joshi
Hi Nitesh,
   
  Thanks a lot for reply! but i tried this already... i have a doubt... if i 
try to import a single record then it is success but when i try to import 
another one it syas record already exists is it something to do with Number 
Sequences??? would appriciate if u cud throw some light on this :)
   
  Tushar

Nitesh [EMAIL PROTECTED] wrote:
  Hi Tushar,

seems Record already exist in Table .

From Import Dialog box go to Import Rule Tabpage and select the
Option clear table before Import from Import Rule field.

Regards
Nitesh

On 3/21/08, Tushar Joshi [EMAIL PROTECTED] wrote:
 Hi,

 I am trying to import the masterdata provided by client into Ax 4.0 SP2.

 I created a new blank company account in Ax to import data n started the
 excelimport through Administration - Periodic - Data Import/export -
 excel spreadsheets - excel import. but it gives an error and says the
 record already exists and import is interrupted. can anyone help me on how
 to import data through excel?

 The excel sheets were given ti client were created from same company
 account with a defnition group created.

 plz help..

 Regards,
 Tushar


 -
 Meet people who discuss and share your passions. Join them now.


   

   
-
 5, 50, 500, 5000 - Store N number of mails in your inbox. Click here.

[Axapta-Knowledge-Village] Eror while importing Data from Excel to Ax

2008-03-21 Thread Tushar Joshi
Hi,
   
  I am trying to import the masterdata provided by client into Ax 4.0 SP2.
   
  I created a new blank company account in Ax to import data n started the 
excelimport through Administration - Periodic - Data Import/export - excel 
spreadsheets - excel import. but it gives an error and says the record 
already exists and import is interrupted. can anyone help me on how to import 
data through excel?
   
  The excel sheets were given ti client were created from same company account 
with a defnition group created.
   
  plz help..
   
  Regards,
  Tushar

   
-
 Meet people who discuss and share your passions.  Join them now.

Re: [Axapta-Knowledge-Village] Re: serial no problem

2008-03-12 Thread Tushar Joshi
Dear Pradeep,
   
  I tried the steps(but i have skipped the 3rd one)
   
  but it gives the error as A quantity other than 1 can not be updated with 
serial number SR2 (the one which i created) because serial number control is 
activated.
   
  And it does not allow you to post registration transaction.
   
  pls help!
   
  Regards,
  Tushar Joshi

pradeepkanagaraj [EMAIL PROTECTED] wrote:
  Dear Ghosh,

Try these steps:
1. Inventory Management - Link the RAMs item with a dimension group 
in which the storage dimension Serial Number is active (and /or 
made primary stocking).

2.Also select the Serial Number Control option in General tab of 
storage dimension form against Serial Number.

3. Attach RAMs to an inventory model group with Registration 
option selected. This step can be skipped if required.

4. While updating Packing Slip, go to PO lines -- Inventory -- 
Registration -- Enter 500 or select Auto Create -- Create Serial 
Numbers.

This should solve your problem. Guys correct me if wrong.

Regards,
Pradeep Kanagaraj
--- In Axapta-Knowledge-Village@yahoogroups.com, ghoshsubhajit 
[EMAIL PROTECTED] wrote:

 Dear All
 
 I have a problem in handling serial no (inventory dimension) in 
AX4. I 
 want to buy 500 rams from a vendor. For that I create a PO with 
one 
 line where quentity is 500.
 
 Now vendor delivers 500 RAMs with 500 serial no. Now I want to tag 
 serial no aganist each ram. But my PO line is only one.
 
 How can I do this. Is there any standard functionality for this or 
 customization required.
 
 Regards
 
 Subhajit Ghosh




 

   
-
 Unlimited freedom, unlimited storage. Get it now