Impossible to seal off - it is open on the sides to a Lobby basically.
He is a stickler for sure for what he wants the way he wants it. He
wanted us to run the pipe on the roof within the tapered insulation... I
said sure, but we would not warranty it.
Its going to be a fight.
On 12/2/2010 4:50 PM, Travis Mack, SET wrote:
I believe that even with a deluge system you have to install heads per the
listing. So you couldn't do his method anyway.
Tell him to seal it all off and use FM200. That may cost a fortune but you have
to pay for what you want.
Travis Mack, SET
MFP Design, LLC
www.mfpdesign.com
Sent on the Sprint® Now Network from my BlackBerry®
-----Original Message-----
From: Greg McGahan<[email protected]>
Sender: [email protected]
Date: Thu, 02 Dec 2010 16:46:25
To:<[email protected]>
Reply-To: [email protected]
Subject: difficult one
The situations is this:
Preface - I have already exhausted the "you can't because" in trying to
convince him to run two lines exposed in this space.
Light Hazard
Corridor / Lobby with a center section Sloped, exposed construction 8
in on 12in - 20' in width
On each side the ceiling drops about 4' to smooth flat ceilings
The architect wants to find a way to eliminate exposed pipe. He prefers
to use sidewalls on the vertical 4' sides which I told him we could not do..
His question is can he install detection at the peak, use sidewalls as
described above with a deluge valve.
Does anyone have any other creative ideas for this situation?
Thanks,
Greg
--
Greg C. McGahan Living Water Fire Protection, LLC. 1160 McKenzie Road
Cantonment, FL 32533 850-937-1850 Fax 850-937-1852
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum